Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Repairing Of Track Chain By Changing Of 08 Links From Old And Serviceable Chain For Beml, Be1000 1 G10221 Shovel At Abocp Mines.
|
Description |
Repairing Of Track Chain By Changing Of 08 Links From Old And Serviceable Chain For Beml, Be1000 1 G10221 Shovel At Abocp Mines.
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2025_BCCL_338274_1 |
Reference Number |
BCCL/BII/EXC/REP/e-Tender/ 25-26 /52 Dt.25.06.25 |
Tender Fee | 0 |
EMD | 1463 |
Tender Value | |
Place | ABOCP |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=350659 |
Start Date | June 25, 2025 14:30 |
End Date |
07/07/2025 ( Expired 11 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for preparation of detailed project report for widening work from km. 142 to 156 including construction of bridge at km. 131 and km. 148 (umarda canal bridges and ishan river bridge ) of nh-234 (old nh-91a) in the state of u.p.
Consultancy services for preparation of detailed project report for widening work from km. 142 to 156 including construction of bridge at km. 131 and km. 148 (umarda canal bridges and ishan river bridge ) of nh-234 (old nh-91a) in the state of u.p.
Read moreE tender cum e auction for allotment of land parcel and assets 1.5 ha. (plot no. f-5) on fresh long term lease basis of 30 yrs under pglm 2015 (and clarifications issued by mopsw from time to time till 10.12.2024) for liquid storage facilities at jnp
E tender cum e auction for allotment of land parcel and assets 1.5 ha. (plot no. f-5) on fresh long term lease basis of 30 yrs under pglm 2015 (and clarifications issued by mopsw from time to time till 10.12.2024) for liquid storage facilities at jnp
Read moreEngagement of a contractor by mcd for toll and ecc collection at border points from specified commercial vehicles
Engagement of a contractor by mcd for toll and ecc collection at border points from specified commercial vehicles entering delhi for a period of three years
Read moreDm and sditc of hydraulic power pack including heat exchanger and electrical control panel for operation of caisson, as replacement of existing machine by dismantling of old one, including 5 years cmc after expiry of 2 years dlp at lock entrance
Dm and sditc of hydraulic power pack including heat exchanger and electrical control panel for
 operation of caisson, as replacement of existing machine by dismantling of old one, including 5 years
 cmc after expiry of 2 years dlp at lock entrance
Read moreSupply erection testing and commissioning for replacement of old and obsolete 11 kv panel sets with new 1 plus 2 11 kv vcb panel sets at 66 and 33 kv receiving stations of std kathua at mahanpur baggan and palli for the year 2025 26
Supply erection testing and commissioning for replacement of old and obsolete 11 kv panel sets with new 1 plus 2 11 kv vcb panel sets at 66 and 33 kv receiving stations of std kathua at mahanpur baggan and palli for the year 2025 26
Read more1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
Read moreDismantling and loading of be1000-1 ( backhoe) shovel si.no.- b10270 at rohini project, nk area, transportation of dismantled machine to potanga workshop of urimari project barka-sayal area and unloading and assembling of dismantled machine.
Dismantling and loading of be1000-1 
 ( backhoe) shovel si.no.- b10270 at rohini project, nk area, transportation of dismantled machine to potanga workshop of urimari project barka-sayal area and unloading and assembling of dismantled machine.
Read moreSurvey and assessment of feasibility for modification of existing 2 ph. dc towers to 3-ph dc towers by erecting two extra cross arms as proposed by rly for construction of 132 kv 3-ph dc tl from gss kendposi to new tss at kendposi
Survey and assessment of feasibility for modification of existing 2 ph. dc towers to 3-ph dc towers by erecting two extra cross arms as proposed by rly for construction of 132 kv 3-ph dc tl from gss kendposi to new tss at kendposi
Read moreProposed construction of compoundwall and other improvements work for thiruvottiyur old bg in dn 9 toilet block 4nos plus 1no physically challenged seated gents gym shuttle court 2nos volleyball court badminton court at poonthottam st in dn 10 zn 1
Proposed construction of compoundwall and other improvements work for thiruvottiyur old bg in dn 9 toilet block 4nos plus 1no physically challenged seated gents gym shuttle court 2nos volleyball court badminton court at poonthottam st in dn 10 zn 1
Read moreChanging of damaged plates with new plates (16mm) at gondudih old road weighbridge and kusunda old road weighbridge followed by testing of each weighbridge with 15 tons
Changing of damaged plates with new plates (16mm) at gondudih old road weighbridge and kusunda old road weighbridge followed by testing of each weighbridge with 15 tons
Read moreof your Industry type