Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rebuilding Of Rotor Shaft Of 425 Hp Motor Of Unit No 01 At Lis Lethpora Stage I
|
| Description |
Rebuilding Of Rotor Shaft Of 425 Hp Motor Of Unit No 01 At Lis Lethpora Stage I
|
| Organisation | Government of Jammu and Kashmir |
| Tender Id | 2023_IFC_225341_1 |
|
Reference Number |
eNIT-18 |
| Tender Fee | 100 |
| EMD | 460 |
| Tender Value | - |
| Place | MID Sgr |
| Link |
View Original Tender Notice
https://jktenders.gov.in |
| Start Date | August 07, 2023 21:30 |
| End Date |
Expired
09/09/2023
Expired 1096 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rebuilding of rotor shaft of 425 hp motor of unit no 01 at lis lethpora stage i
Rebuilding of rotor shaft of 425 hp motor of unit no 01 at lis lethpora stage i
Read moreReplacement of damaged contactor assembly of 425 hp er of unit-5 at lis lethpora stage 1st.
Replacement of damaged contactor assembly of 425 hp er of unit-5 at lis lethpora stage 1st.
Read moreRepairs/rewinding of 425 hp capacity, 3 phase, vertical induction motor of pumping unit no. 03 at lift irrigation scheme lethpora stage-1st.
Repairs/rewinding of 425 hp capacity, 3 phase, vertical induction motor of pumping unit no. 03 at lift irrigation scheme lethpora stage-1st.
Read moreReplacement of led flood lights at lis lethpora stage-i
Replacement of led flood lights at lis lethpora stage-i
Read moreReplacement of damaged tools at lis lethpora stage i and ii
Replacement of damaged tools at lis lethpora stage i and ii
Read moreReplacement of ac contactor coil/ rewinding of 425 hp auto-transformer er of pumping unit no. 01 at lis marval stage 2nd.
Replacement of ac contactor coil/ rewinding of 425 hp auto-transformer er of pumping unit no. 01 at lis marval stage 2nd.
Read moreContract for dismantling of existing hp rotor and installation of repaired hp rotor in unit-1, stage-i(3x660mw) unit at ntpc barh.
Contract for dismantling of existing hp rotor and installation of repaired hp rotor in unit-1, stage-i(3x660mw) unit at ntpc barh.
Read moreConstruction of protection work (retaining wall) to existing infrastructure near stage 1st of lethpora lis
Construction of protection work (retaining wall) to existing infrastructure near stage 1st of lethpora lis
Read moreRepair of hp rotor and hp outer casing and assembly with hp inner casing, outer casing and rotor of stage 2 (2x500mw unit) ntpc farakka 500mw (stage 2).
Repair of hp rotor and hp outer casing and assembly with hp inner casing, outer casing and rotor of stage-2 (2x500mw unit)- ntpc farakka 500mw (stage-2).
Read moreComplete rewinding of 180 hp motor (unit no. 02) at lis hapathkhut.
Complete rewinding of 180 hp motor (unit no. 02) at lis hapathkhut.
Read moreof your Industry type