Tender Details
Particulars | Details |
---|---|
Title |
Fitment Of New Undercarriage Assy. In 01 No. Bd 155 Dozer Sr. No. 13559 And 01 No. Be 00010263 Working At Aik Deep Ocm, Nagpur Area.
|
Description |
Fitment Of New Undercarriage Assy. In 01 No.
Bd 155 Dozer Sr. No. 13559 And 01 No.
Be 1000 10263 Working At Aik Deep Ocm,
Nagpur Area.
|
Organisation | Western Coalfields Limited | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 1010 |
Tender Value | |
Place | AIK DEEP OCM, NAGPUR AREA |
Link |
AAAAAAAAAA Login to view |
Start Date | April 21, 2025 21:00 |
End Date |
25/04/2025 ( 3 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply and installation of street light at different places in ward no 01 to 07
Supply and installation of street light at different places in ward no 01 to 07
Read moreConstruction of harijan dharmshala at naya bazar no.05,cons of cc road at naya bazar no. 04 from balram jatav to rajesh ahirwal house,cons of cc road and drain at naya bazar ward no.01 from tamarayi kunaa to mantu latri house,cons of chabutra in nb1
Construction of harijan dharmshala at naya bazar no.05,cons of cc road at naya bazar no. 04 from balram jatav to rajesh ahirwal house,cons of cc road and drain at naya bazar ward no.01 from tamarayi kunaa to mantu latri house,cons of chabutra in nb1
Read moreSitc of new control cum protection panel for hv side of 66 by 11kv 2mva transformers no. 01 and 02 along with dismantling of existing old panel at matatila hydro power plant distt lalitpur
Sitc of new control cum protection panel for hv side of 66 by 11kv 2mva transformers no. 01 and 02 along with dismantling of existing old panel at matatila hydro power plant distt lalitpur
Read moreConstruction work of c.c. road m-30, m-20 and curbed drain at various places in uday nagar basti no.1 basti 2 basti 3 and new shobhapur and old gokalpur area under gokalpur ward. (any mad)
Construction work of c.c. road m-30, m-20 and curbed drain at various places in uday nagar basti no.1 basti 2 basti 3 and new shobhapur and old gokalpur area under gokalpur ward. (any mad)
Read moreProviding of fresh drinking water pipe line of 40 mm dia connecting to drinking water point in berth no 5, 6 and 7 in wharf area, new shed 1 area and berth no. 13 near security gate
Providing of fresh drinking water pipe line of 40 mm dia connecting to drinking water point in berth no 5, 6 and 7 in wharf area, new shed 1 area and berth no. 13 near security gate
Read moreRfp no. dce a/alhw/ee dd/db/rfp-01/2025-26
Request for proposal rfp for the work of integration of old and new dry dock-ii at marine dock yard in sri vijaya puram, south andaman 
 andaman and nicobar islands
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of 43 nos. of rcc sectionalisation stoppings (26 nos. rcc sectionalisation preparatory stoppings and 17 nos. rcc sectionalisation stoppings) in seam iv (b) and seam iv (m) and seam v of saoner mine no. 2, nagpur area
Construction of 43 nos. of rcc sectionalisation stoppings (26 nos. rcc sectionalisation preparatory stoppings and 17 nos. rcc sectionalisation stoppings) in seam iv (b) and seam iv (m) and seam v of saoner mine no. 2, nagpur area
Read moreof your Industry type