Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Shifting Of Water Supply Pipeline Crossing Drains At Various Locations From 39th To 50th Division In Rmc.
|
Description |
Shifting Of Water Supply Pipeline Crossing Drains At Various Locations From 39th To 50th Division In Rmc.
|
Organisation | Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 244 |
EMD | 6889 |
Tender Value | |
Place | AP |
Link |
AAAAAAAAAA Login to view |
Start Date | July 10, 2025 02:30 |
End Date |
23/07/2025 ( 11 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Long term measures for permanent rectification black spot id-cg-(04)-01 from ch. 19.400 to 20.900 (infront of g.k. township to charoda bypass crossing) in the state of chhattisgarh
Long term measures for permanent rectification black spot id-cg-(04)-01 from ch. 19.400 to 20.900 (infront of g.k. township to charoda bypass crossing) in the state of chhattisgarh
Read moreIe services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreSupply of threat containment vessel (tcv) at various aai airports
Supply of threat containment vessel (tcv) at various aai airports in india with 03
 years onsite warranty with spares and consumables and provision of inhouse/ call
 basis maintenance for 03 years after completion of warranty period.
Read moreRehabilitation and upgradation for kopargaon to savli vihir section from km. 354.000 to km.362.663 total length 8.663 of nh 752 g to 4l.ps in the state of maharashtra. repairs of bad patches and dis at the risk and cost of the contractor as p
Rehabilitation and upgradation for kopargaon to savli vihir section from km. 354.000 to km.362.663 total length 8.663 of nh 752 g to 4l.ps in the state of maharashtra. repairs of bad patches and dis at the risk and cost of the contractor as p
Read moreConstruction of road from km 0.00 to km 27.430 (package-1) of bile- migging section (km 0.00 at bile) of nh-913 (frontier highway) to intermediate lane on epc mode in the state of arunachal pradesh
Construction of road from km 0.00 to km 27.430 (package-1) of bile-
 migging section (km 0.00 at bile) of nh-913 (frontier highway) to intermediate
 lane on epc mode in the state of arunachal pradesh
Read moreConstruction of road from km 17.812 to km 55.377 (package-2) of bile- migging section (km 0.00 at migging end) of nh-913 (frontier highway) to intermediate lane on epc mode in the state of arunachal pradesh
Construction of road from km 17.812 to km 55.377 (package-2) of bile-
 migging section (km 0.00 at migging end) of nh-913 (frontier highway) to
 intermediate lane on epc mode in the state of arunachal pradesh
Read moreUpgradation of construction of six lane highway corridor from ch. 8/500 to 33/500 and upgradation of existing highway to six lanes from ch. 8/500 to 40/00 section at grade section of hadapsar yevat (nh-65) in the state of maharashtra
Upgradation of construction of six lane highway corridor &#x0d from ch. 8/500 to 33/500 and upgradation of existing &#x0d highway to six lanes from ch. 8/500 to 40/00 section at&#x0d grade section of hadapsar yevat (nh-65) in the state of &#x0d maharashtra
Read moreConstruction of vop near sadahalli gate at km.538.832 of ministry identified blackspot ka01 016bs for hyderabad bengaluru section of nh7 from km. 534.720 to km. 556.840 in the state of karnataka on epc mode
Construction of vop near sadahalli gate at km.538.832 of ministry identified blackspot ka01 016bs for hyderabad bengaluru section of nh7 from km. 534.720 to km. 556.840 in the state of karnataka on epc mode
Read moreof your Industry type