Tender Details

Particulars Details
Title
Construction Of Civil Works For Increasing Capacity From (1x500 Plus 2x315 Mva) To (2x500 Plus 1x315 Mva) At 400 K.V. Sub Station Ist Muradnagar Ghaziabad.
Description
Construction Of Civil Works For Increasing Capacity From (1x500 Plus 2x315 Mva) To (2x500 Plus 1x315 Mva) At 400 K.V. Sub Station Ist Muradnagar Ghaziabad.
Organisation UP Power Transmission Corp.Ltd (Works and Projects)) | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 5900
EMD 1.2 Lakh
Tender Value
Place GHAZIABAD
Link

AAAAAAAAAA

Login to view
Start Date May 08, 2025 20:30
End Date

23/05/2025 ( 13 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Maintaining the buildings, sweeping of roads and plucking of grass in switch yard area and maintaining the plants and lawns at 400 kv ss suryapet in yadadri-bhongirir district for the period from 01.06.2025 to 31.03.2026 in omc, nalgonda

Maintaining the buildings, sweeping of roads and plucking of grass in switch yard area and maintaining the plants and lawns at 400kv ss suryapet in yadadri-bhongir district for the period from 01.06.2025 to 31.03.2026 in omc, nalgonda

Read more
Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode

Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode

Read more
Special repair to incoming ht cable and improvement to e/m installation and upgradation of existing transformer and allied works in sub station at subroto park under ge (af) subroto park, delhi cantt-10

Special repair to incoming ht cable and improvement to e/m installation and upgradation of existing transformer and allied works in sub station at subroto park under ge (af) subroto park, delhi cantt-10

Read more
Construction of a raised platform for storing departmental materials at new bishnupur220/ 132/33kv sub-station under bankura area office wbsetcl

Construction of a raised platform for storing departmental materials at new bishnupur220/ 132/33kv sub-station under bankura area office wbsetcl

Read more
Construction of stack yard for storing of tower materials with concrete approach pathway and open stackyard at bankura 132/33 kv sub station under bankura area office wbsetcl

Construction of stack yard for storing of tower materials with concrete approach pathway and open stackyard at bankura 132/33 kv sub station under bankura area office wbsetcl

Read more
Extension of control room building and renovation of switchyard with allied civil works at boro 33/11 kv sub-station under raghunathpur division, dist.- purulia.

Extension of control room building and renovation of switchyard with allied civil works at boro 33/11 kv sub-station under raghunathpur division, dist.- purulia.

Read more
Architectural finishing works including interior fitouts design and construction of external facade water supply sanitary installation, drainage for 07 elevated stations from. esic nagar to bandra of metro line 2b corridor d.n. nagar to mandale

Architectural finishing works including interior fitouts design and construction of external facade water supply sanitary installation, drainage for 07 elevated stations from. esic nagar to bandra of metro line 2b corridor d.n. nagar to mandale

Read more
Construction of building for the opportunity school at iit kanpur under phase 2 sh civil works

Construction of building for the opportunity school at iit kanpur under phase 2 sh civil works

Read more
Construction of 01(one) no. 3-storied b-type quarter at the premises of hamiltonganj 66kv sub-station, w.b.s.e.t.c.l (civil part).

Construction of 01(one) no. 3-storied b-type quarter at the premises of hamiltonganj 66kv sub-station, w.b.s.e.t.c.l (civil part).

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise