Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Design Drawing Approval Fabrication Supply And Installation Of Vibration Based Visual Inspection System For Ceramic Oxide Pellets
|
Description |
Design Drawing Approval Fabrication Supply And Installation Of Vibration Basedvisual Inspection System For Ceramic Oxide Pellets
|
Organisation | Nuclear Recycle Board | Central Govt. Ministry/Department |
Tender Id | 2024_NRB_795034_1 |
Reference Number |
BARCT NRB INRPO FF FQC GEN 7 2024 157 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | FF/INRPO/NRB/TARAPUR |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=835620 |
Start Date | February 13, 2024 22:30 |
End Date |
19/02/2024 ( Expired 506 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, supply, installation, testing and commissioning of open loop emv ncmc card and qr code based automatic fare collection (afc) system along with camc for nagpur metro rail project phase-ii
Design, supply, installation, testing and commissioning of open loop emv ncmc card and qr code based automatic fare collection (afc) system along with camc for nagpur metro rail project phase-ii
Read moreDesign, supply, installation and commissioning of open standard digital trunking radio system for chandigarh police
Design, supply, installation and commissioning of open standard digital trunking radio system for chandigarh police
Read morePre-qualification bid for design, manufacturing, testing, supply, installation, commissioning, training and performance testing of &ldquohigh capacity sheet cutting combined with multiple single note inspection system along with auto packing&rdquo
Pre-qualification bid for design, manufacturing, testing, supply, installation, commissioning, training and performance testing of &ldquohigh capacity sheet cutting combined with multiple single note inspection system along with auto packing&rdquo
Read moreSupply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa
Supply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa
Read moreDesign, engineering, manufacture, supply and delivery of new ip rotor (with full blading) for turbine model,c 210-130 (for 210 mw unit of kolaghat tps) through capex 2025-26
Design, engineering, manufacture, supply and delivery of new ip rotor (with full blading) for turbine model,c 210-130 (for 210 mw unit of kolaghat tps) through capex 2025-26
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreSupply installation implementation integration commissioning and maintenance of hw infrastructure and associated sw for upi
Supply installation implementation integration commissioning and maintenance of hw infrastructure and associated sw for upi
Read moreDesign, fabrication, supply and installation of signage and graphics for twelve (12) underground metro stations of reach-6 under phase-ii.
Design, fabrication, supply and installation of signage and graphics for twelve (12) underground metro stations of reach-6 under phase-ii.
Read moreSupply, installation testing and commissioning of gel imaging and documentation system
Supply, installation testing and commissioning of gel imaging and documentation system
Read moreRequest for selection (rfs) of epc contractors/ rts vendors for design, engineering, supply, installation, testing commissioning and om for 5 years of 1,198.21 mwp grid connected rooftop solar plants for 5,99,105 sc and st consumers through utility led aggregation (capex) mode in apdiscoms under pm- surya ghar: muft bijli yojana
Request for selection (rfs) of epc contractors/ rts vendors for design, engineering, supply, installation, testing commissioning and om for 5 years of 1,198.21 mwp grid connected rooftop solar plants for 5,99,105 sc and st consumers through utility led aggregation (capex) mode in apdiscoms under pm- surya ghar: muft bijli yojana
Read moreof your Industry type