Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Work Of Repairing, /Replacement Erection And Fabrication Of Extensor Plate, Short Post, Decking Plates, Structures Of Conveyors And I Beam Of Hopper Shed Of A Chp Of Chd Iii Btps, Obra.
|
Description |
Work Of Repairing, /Replacement Erection And Fabrication Of Extensor Plate, Short Post, Decking Plates, Structures Of Conveyors And I Beam Of Hopper Shed Of A Chp Of Chd Iii Btps, Obra.
|
Organisation | UP Rajya Vidyut Utpadan Nigam Ltd | State Govt. and UT |
Tender Id | 2025_RVUNL_1020443_1 |
Reference Number |
N-OBR////6000007650/T-11/SE-V |
Tender Fee | 1180 |
EMD | 16400 |
Tender Value | |
Place | CHD-III BTPS |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1841306 |
Start Date | March 22, 2025 17:30 |
End Date |
11/04/2025 ( Expired 75 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Work proposal for structure strengthening work of various conveyors of 4x210 mw chp i and wagon tippler and fabrication and installation of extended platform and jalli of both side at old track hopper oth and covered shed for 4x210 mw chp i sgtps
Work proposal for structure strengthening work of various conveyors of 4x210 mw chp i and wagon tippler and fabrication and installation of extended platform and jalli of both side at old track hopper oth and covered shed for 4x210 mw chp i sgtps
Read moreRepairing/reconditioning of stator/rotor of various capacity conveyor motors, vibrating feeders motor, gutka, bearing seat of rotor shafts of various motors of chp of chd-iii, btps, obra
Repairing/reconditioning of stator/rotor of various capacity conveyor motors, vibrating feeders motor, gutka, bearing seat of rotor shafts of various motors of chp of chd-iii, btps, obra
Read moreWork of amc of pusher car including its overhead l.t line, amc of metal detector, suspension magnet and pa system of chp a and b of chd-iii,btps, obra.
Work of amc of pusher car including its overhead l.t line, amc of metal detector, suspension magnet and pa system of chp a and b of chd-iii,btps, obra.
Read moreFabrication, supply and erection of modified sill beam of spillway radial gates 1,2 and 3.repairing chamera-iii power station
Fabrication, supply and erection of modified sill beam of spillway radial gates 1,2 and 3.repairing chamera-iii power station
Read moreRepairing, fabrication and erection of b side hopper liner, mother plates, hopper tray(plates, angles) and b side hopper supporting structure in pch section of sawang washery.
Repairing, fabrication and erection of b side hopper liner, mother plates, hopper tray(plates, angles) and b side hopper supporting structure in pch section of sawang washery.
Read moreRepairing, fabrication and erection of b side hopper liner, mother plates, hopper tray(plates, angles) and b side hopper supporting structure in pch section of sawang washery.
Repairing, fabrication and erection of b side hopper liner, mother plates, hopper tray(plates, angles) and b side hopper supporting structure in pch section of sawang washery.
Read moreRepairing of roller chain assembly, under carriage, patching work of bunker, discharge chute and fabrication of chain link plates and real tail/center plate of feeder breaker no. 2 in respect of akkocp, bnk area.
Repairing of roller chain assembly, under carriage, patching work of bunker, discharge chute and fabrication of chain link plates and real tail/center plate of feeder breaker no. 2 in respect of akkocp, bnk area.
Read moreSteel structural work for complete dismantling, fabrication and erection of deck sheets, chequered plates with supporting structure along with foundation strengthening in crusher house, conveyor 8c,9c,10c,11c,1c and 2c in chp phase-i and phase-ii
Steel structural work for complete dismantling, fabrication and erection of deck sheets,chequered plates with supporting structure along with foundation strengthening in crusher house,conveyor 8c,9c,10c,11c,1c and 2c in chp phase-i and phase-ii
Read moreThe work of repair, rectification, fabrication, and machining of miscellaneous spares of wagon tippler, resilient plate of different fcu, gear boxes of stacker, reclaimer and reclamation, repairing of fluid coupling of chp, btps, obra
The work of repair, rectification, fabrication, and machining of miscellaneous spares of wagon tippler, resilient plate of different fcu, gear boxes of stacker, reclaimer and reclamation, repairing of fluid coupling of chp, btps, obra
Read moreThe work of fabrication, repairing, strengthening of damaged chutes of chp, btps, obra.
The work of fabrication, repairing, strengthening of damaged chutes of chp, btps, obra.
Read moreof your Industry type