Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Selection Of Jv Partner For Pre Bid Tie Up For Services And Post Bid Construction Work Through An Unincorporated Joint Venture Agreement For Widening And Strengthening To 2 Lane With Paved Shoulder Including Bypass/Realignment Of Nh On Epc Mode
|
| Description |
Selection Of Jv Partner For Pre Bid Tie Up For Services And Post Bid Construction Work Through An Unincorporated Joint Venture Agreement For Widening And Strengthening To 2 Lane With Paved Shoulder Including Bypass/Realignment Of Nh On Epc Mode
|
| Organisation | Bridge and Roof Company (India) Limited | Central Govt. Ministry/Department |
| Tender Id | 2025_BandR_877055_1 |
|
Reference Number |
BANDR/HO/BD/JOINT VENTURE/NH/WB/EOI/01 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Midnapore state of W.B |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=921925 |
| Start Date | September 11, 2025 23:45 |
| End Date |
Expired
06/10/2025
Expired 378 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Widening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (badwala to lakhwar bend) (realignment from km 12.00 to 31.122) on nh-507
Widening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (badwala to lakhwar bend) (realignment from km 12.00 to 31.122) on nh-507
Read moreConsultancy services for preparation of dpr for i widening upgradation to two lane with paved shoulder on nh 169a from km. 30.75 to km. 51.60 agumbe ghat, ii construction of two lane with paved shoulder for thirtahalli bypass starts on from nh169a
Consultancy services for preparation of dpr for i widening upgradation to two lane with paved shoulder on nh 169a from km. 30.75 to km. 51.60 agumbe ghat, ii construction of two lane with paved shoulder for thirtahalli bypass starts on from nh169a
Read moreConstruction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.
Read moreConstruction of 4 lane with paved shoulder daudnagar bypass from km 93.915 to km 102.290 of nh 139 on naubatpur _ hariharganj road in the state of bihar on epc mode.
Construction of 4 lane with paved shoulder daudnagar bypass from km 93.915 to km 102.290 of nh 139 on naubatpur _ hariharganj road in the state of bihar on epc mode.
Read moreConstruction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for authority engineer for supervision of widening to 2 lane paved shoulder from existing chainage 12.000 to km 40.500 badhwala to lakhwar bend realignment from km. 12.00 to 31.122 on nh-507 length-25.660 km in the state of uttar
Widening to 2 lane paved shoulder from existing chainage 12.000 to km 40.500 badhwala to lakhwar bend realignment from km. 12.00 to 31.122 on nh-507 length-25.660 km in the state of uttarakhand on epc mode.
Read moreAbilitation upgradation and widening of akola to mahan section from km 35.265 to km 64.574 (length 29.309 km) including construction of 4 lane with paved shoulder configuration of barshi takli bypass (length 3.160 km) on nh161a the state of maharas
Abilitation upgradation and widening of akola to mahan section from km 35.265 to km 64.574 (length 29.309 km) including construction of 4 lane with paved shoulder configuration of barshi takli bypass (length 3.160 km) on nh161a the state of maharas
Read moreConsultancy services for authoritys engineer for supervision of the work of construction of 4-lane with paved shoulder of sri muktsar sahib bypass from existing km 269.960 of nh-354 to existing km 39.280 of nh - 754 in the state of punjab.
Consultancy services for authoritys engineer for supervision of the work of construction of 4-lane with paved shoulder of sri muktsar sahib bypass from existing km 269.960 of nh-354 to existing km 39.280 of nh - 754 in the state of punjab.
Read moreExpression of interest for pre-tender tie up for selection of associate / jv / consortium partner for construction of four lane with paved shoulder of bhagalpur kharhara village dhaka more in the state of bihar.
Expression of interest for pre-tender tie up for selection of associate / jv / consortium partner for construction of four lane with paved shoulder of bhagalpur kharhara village dhaka more in the state of bihar.
Read moreof your Industry type