Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Deposit Deposit Work Wss To Chengamanad Pipe Line Extension In Ward 8, 17 In Chengamanad Panchayath Pipeline Work
|
| Description |
Deposit Deposit Work Wss To Chengamanad Pipe Line Extension In Ward 8, 17 In Chengamanad Panchayath Pipeline Work
|
| Organisation | Kerala Water Authority | State Govt. and UT |
| Tender Id | 2024_KWA_668716_1 |
|
Reference Number |
WRD/KWA-CE(CR)/TR/5195/2023-26 |
| Tender Fee | 775 |
| EMD | 8790 |
| Tender Value | - |
| Place | Chengamanad Panchayath |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1039850 |
| Start Date | March 11, 2024 18:30 |
| End Date |
Expired
16/03/2024
Expired 901 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Gangadharaiah circle development work in ward 8 tcc limits
Gangadharaiah circle development work in ward 8 tcc limits
Read moreMaintenance contract for controlling leakage and seepage in underground/elevated section including tunnel, stations, ancillary buildings, viaduct and depot etc. of line-8 from botanical garden to krishna park extension and line-8 extension stations.
Maintenance contract for controlling leakage and seepage in underground/elevated section including tunnel, stations, ancillary buildings, viaduct and depot etc. of line-8 from botanical garden to krishna park extension and line-8 extension stations.
Read moreConstruction of rcc drain in ward no 15 2 installation of cistern tank 1 mahalinga paschapur 2 mareppa doddannavar 3 birappa jogannavar 4 sidraya mathad 5 gangappa kanabur 6 honnappa saidapur 7 nagappa nesur 8 lakkappa nesur in ward no 17 3 installation of 8 nos cistern tanks in ward no 7 4 drilling of borewell near anganwadi of irappa kittur farm in ward no 5 and installation of cistern tank near srishail basappa konnur farm
1construction of rcc drain in ward no 15 2 installation of cistern tank 1 mahalinga paschapur 2 mareppa doddannavar 3 birappa jogannavar 4 sidraya mathad 5 gangappa kanabur 6 honnappa saidapur 7 nagappa nesur 8 lakkappa nesur in ward no 17 3 installation of 8 nos cistern tanks in ward no 7 4 drilling of borewell near anganwadi of irappa kittur farm in ward no 5 and installation of cistern tank near srishail basappa konnur farm
Read moreRaising of monsoon plantation work under clear felled area at xiv-8 yelavalli, (12.5 ha) xiv-24 hunasgeri (22.5ha), alkeri gouliwada xv-22 (11.85ha) total 46.85ha in kirwatti range during 2026-27
Raising of monsoon plantation work under clear felled area at xiv-8 yelavalli, (12.5 ha) xiv-24 hunasgeri (22.5ha), alkeri gouliwada xv-22 (11.85ha) total 46.85ha in kirwatti range during 2026-27
Read moreRepair work of 800mm dia bws pipe line in gaddi halla 150mm near air wall , 2) koralhalli infront of toll gate bridge ms pipe near bannikatti indian petrol bunk 4) infront of nayara pentro bunk 100mm air vall 5) hammagi jack well pump no 1 and 2, 6) dambal hunasi thota expention joint 7) gaddi halla 90mm ms pipe , korlahalli 2nd bridge and dhoni cross ,hammagi jack well pump house ,adavisambapur bharath petrol bunk , lic office near ring road papanasi kalmeshwar temple cross at gbcmc limits.
Repair work of 800mm dia bws pipe line in 1) gaddi halla 150mm near air wall , 2) koralhalli infront of toll gate bridge ms pipe 3) near bannikatti indian petrol bunk 4) infront of nayara pentro bunk 100mm air vall 5) hammagi jack well pump no 1 and 2, 6) dambal hunasi thota expention joint 7) gaddi halla 90mm ms pipe 8) korlahalli 2nd bridge and dhoni cross 9) hammagi jack well pump house 10) adavisambapur bharath petrol bunk , lic office near ring road 11) papanasi kalmeshwar temple cross at gbcmc limits.
Read moreDepositdeposit work 2022 23 providing pipe line extension to poonthoni at vadavannur grama panchayath providing pipe line extension to poonthoni at vadavannur grama panchayathpipeline work
Depositdeposit work 2022 23 providing pipe line extension to poonthoni at vadavannur grama panchayath providing pipe line extension to poonthoni at vadavannur grama panchayathpipeline work
Read moreDepositalappuzha district panchayatharyad division extension of pipe line laying for various places in mannanchery grama panchayathpipeline work
Depositalappuzha district panchayatharyad division extension of pipe line laying for various places in mannanchery grama panchayathpipeline work
Read moreDeposit wss to nedumbassery pipe line extension in ward 8 cheriyavapalassery kaithakkad area pipeline work
Deposit wss to nedumbassery pipe line extension in ward 8 cheriyavapalassery kaithakkad area pipeline work
Read moreDeposit pipe line extension for 75mm pvc pipe line at monody balanpadi ward 11 mattathur panchayathpipeline work
Deposit pipe line&#x0d extension for 75mm pvc&#x0d pipe line at monody&#x0d balanpadi ward 11&#x0d mattathur&#x0d panchayathpipeline work
Read moreOm water supply schemesannual maintenance of wss to chengamanad panchayath repairs to the pipe lines in chengamanad panchayath area for the year 20242025pipeline work
Om water supply schemesannual maintenance of wss to chengamanad panchayath repairs to the pipe lines in chengamanad panchayath area for the year 20242025pipeline work
Read moreof your Industry type