Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Estimate For Construction Of 4 Nos Rain Water Harvesting Near Entry Gate Of C2 Block Palam Vihar Zone Ii, Gurugram.
|
| Description |
Estimate For Construction Of 4 Nos Rain Water Harvesting Near Entry Gate Of C2 Block Palam Vihar Zone Ii, Gurugram.
|
| Organisation | Government of Haryana |
| Tender Id | 2023_HRY_303158_1 |
|
Reference Number |
2023C566B57C 5CE8 42FB B684 DA39A7F10A92285ULB |
| Tender Fee | 1000 |
| EMD | 38400 |
| Tender Value | |
| Place | Municipal Corporation Gurgaon |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in |
| Start Date | August 11, 2023 20:25 |
| End Date |
Expired
16/08/2023
Expired 1047 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of rain water harvesting structure at different locations under ge palampur
Construction of rain water harvesting structure 
 at different locations under ge palampur 
Read moreProvn of rain water harvesting near bldg no 1573 and other sanctioned works under the area of age b/r-ii of ge (a) no 1 jodhpur
Provn of rain water harvesting near bldg no 1573 and other sanctioned works under the area of age b/r-ii of ge (a) no 1 jodhpur
Read moreProvn of rain water harvesting near bldg no. 380 and p-706 (bmp and t-72) of corps zonal wksp and other sanction works under age b/r-ii of ge (army) no 1 jodhpur
Provn of rain water harvesting near bldg no. 380 and p-706 (bmp and t-72) of corps zonal wksp and other sanction works under age b/r-ii of ge (army) no 1 jodhpur
Read moreConstruction of boys girls hostel blocks and correstophen estate near lakkar bazar, shimla h.p. sh civil work, ws si rain harvesting tank, site development, e.i. work including type iv qtrs.
Construction of boys girls hostel blocks and correstophen estate near lakkar bazar, shimla h.p. sh civil work, ws si rain harvesting tank, site development, e.i. work including type iv qtrs.
Read moreEngagement of 02 nos. tractor mounted water tanker for supplying of water for construction purpose at hijukita rehab site (near school and masjid area) for the period of 320 days under rajmahal area.
Engagement of 02 nos. tractor mounted water tanker for supplying of water for construction purpose at hijukita rehab site (near school and masjid area) for the period of 320 days under rajmahal area.
Read morePlanning, designing and construction of residential and non residential infrastructure in phasei for establishment of cisf 12th reserve battalion at village jamunia talab, dist sehore (mp) pkg-i in epc mode-i. sh: c/o 242 nos. t-ii qtrs (15 blocks of stilt plus 4 and 1 block of gf), 12 nos t-iii qtrs (stilt plus 3), 5 nos t-i qtrs (g plus 2), 2 nos t-v qtrs. (duplex), training block (g plus 1), 10 bedded hospital (g plus 1), gos mess (gf), single accommodation for 57 sos (g plus 2), store block and tradesmen shop (g plus1), 701 mens barracks 3 blocks (g plus 2), quarter guard (gf), admin/ communication block (g plus 2), dhobi ghat (gf), 2 nos. elect sub stations, stp, 2 nos. ug sumps with pump rooms, i/c internal w/s, sanitary and ei, lifts, dg sets, fire alarm system, firefighting, solar pv power generation system, cctv system, air conditioning system, external civil and electrical service connections, and comprehensive development works .................. bulk services.
Read moreConstruction of 10 nos big rain water harvesting system at various location in palam vihar area, zone-ii, gurugram.
Construction of 10 nos big rain water harvesting system at various location in palam vihar area, zone-ii, gurugram.
Read moreEstimate for construction of 2 nos rain water harvesting at jharsa bundh near h.no. 1603 to 1624 in zone-ii, gurugram.
Estimate for construction of 2 nos rain water harvesting at jharsa bundh near h.no. 1603 to 1624 in zone-ii, gurugram.
Read moreEstimate for construction of 03 nos big rain water harvesting system at sector 17b in zone-ii, gurugram
Estimate for construction of 03 nos big rain water harvesting system at sector 17b in zone-ii, gurugram
Read moreConstruction of 10 nos big rain water harvesting system at various location in palam vihar area, zone-ii, gurugram.recall
Construction of 10 nos big rain water harvesting system at various location in palam vihar area, zone-ii, gurugram.recall
Read moreof your Industry type