Tender Details
Particulars | Details |
---|---|
Title |
Installation Of Submercible Pump Near At J.J.S. Public School, Vill. Kakrari, Block Barauli Aheer, Distt. Agra
|
Description |
Installation Of Submercible Pump Near At J.J.S. Public School, Vill. Kakrari, Block Barauli Aheer, Distt. Agra
|
Organisation | Government of Uttar Pradesh |
Tender Id | 2024_MSME_877746_1 |
Reference Number |
2170/agra/upsic/23-24 |
Tender Fee | 590 |
EMD | 2000 |
Tender Value | |
Place | AGRA |
Link | https://etender.up.nic.in |
Start Date | January 05, 2024 19:30 |
End Date |
11/01/2024 ( Expired 492 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation, testing and commissioning of electrical panels, cables and construction of rcc trenches for functionality of phase-i technical labs at barc near visakhapatnam, a.p.
Supply, installation, testing and commissioning of electrical panels, cables and construction of rcc trenches for functionality of phase-i technical labs at barc near visakhapatnam, a.p.
Read moreConstruction work of cc road at five places, boundary wall and retaining wall including gate near mangal bhawan and paver block work in the courtyard of ambedkar mangal bhawan etc. in bhagwanganj ward, sagar-parshad nidhi
Construction work of cc road at five places, boundary wall and retaining wall including gate near mangal bhawan and paver block work in the courtyard of ambedkar mangal bhawan etc. in bhagwanganj ward, sagar-parshad nidhi
Read moreDnit for prov tap conn to consumers ext aug and regabilitation of water supply system installation of 05 nos nnew tube wells const of new ohsr 0 50 lg and repair of existing tube wells and pump chamber at gurdaspur distt gurdaspur under amrut 2 0
Dnit for prov tap conn to consumers ext aug and regabilitation of water supply system installation of 05 nos nnew tube wells const of new ohsr 0 50 lg and repair of existing tube wells and pump chamber at gurdaspur distt gurdaspur under amrut 2 0
Read moreConstruction of 02 lane rail over bridge at level crossing no 300-spl chowka ghat budhwal block section km713 16 18 on gonda lucknow n.e. railway rail section in distt barabanki on epc mode
Construction of 02 lane rail over bridge at level crossing no 300-spl chowka ghat budhwal block section km713 16 18 on gonda lucknow n.e. railway rail section in distt barabanki on epc mode
Read moreUpgradatrion of rural road from sh connection (near green island school) to rabindranagar ward no 6 at hut bay
Upgradation of rural road from sh connection (near green island school) to rabindranagar ward no 6 at hut bay, south andaman under pmgsy-iii, batch-i, 2024-25 (package no an01hb22, length 2.700 km)
Read moreSupplying and installation of cubicles
Supplying and installation of cubicles for video conferencing at first floor and second floor of chakkar block in central jail at colvale bardez goa. (interior, furniture, internal electrification and dg set.)
Read moreConstruction of main storage shed bonded ware house office building toilet block and electrical works crane installation commissioning work at eastern side of production hangars at bangalore complex
Construction of main storage shed bonded ware house office building toilet block and electrical works crane installation commissioning work at eastern side of production hangars at bangalore complex
Read moreSupply, installation of high mast at primary pig loading area, new coil yard near hsm and other temporary storage in nsl
Supply, installation of high mast at primary pig loading area, new coil yard near hsm and other temporary 
 storage in nsl
Read moreProvn of chain link fencing at 119 inf bn (ta) assam and provn of inter connecting passage from block no p-134 to p-129 of 17 jat at shillong and provn of four soakwells near bldg no mes(kt) p-3 (adm block) p-13 (mag) p-44 (rel
Provn of chain link fencing at 119 inf bn (ta) assam and provn of inter connecting passage from block no p-134 to p-129 of 17 jat at shillong and provn of four soakwells near bldg no mes(kt) p-3 (adm block) p-13 (mag) p-44 (religious ins
Read moreSupply, delivery, installation, testing, commissioning with 3 month trial 5 years operation and maintenance of pumping machineries raw water pumping -6 no of pumps each of (1250 cum/hr.) 415v mcc at pump house, power distribution of th
Supply, delivery, installation, testing, commissioning with 3 month trial 5 years operation and maintenance of pumping machineries raw water pumping -6 no of pumps each of (1250 cum/hr.) 415v mcc at pump house, power distribution of th
Read moreof your Industry type