Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing/Fabrication Of 02 Nos. Of Base Frame Of 2000 Gpm Pump Motor (Asp 250 G) At S. B. Project.
|
| Description |
Repairing/Fabrication Of 02 Nos. Of Base Frame Of 2000 Gpm Pump Motor (Asp 250 G) At S. B. Project.
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_ECL_335786_1 |
|
Reference Number |
GM/SBA/EnM/Tender/25-26/10 |
| Tender Fee | 0 |
| EMD | 4600 |
| Tender Value | |
| Place | Sonepur Bazari Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=348512 |
| Start Date | May 27, 2025 16:30 |
| End Date |
Expired
06/06/2025
Expired 389 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing / rewinding of 120hp, 550v, 1480 rpm, sl. no. vwc/m/05 3phase squirrel cage induction pump motor at victoria west colliery filter plant of damagoria colliery.
Repairing / rewinding of 120hp, 550v, 1480 rpm, sl. no. vwc/m/05 3phase squirrel cage induction pump motor at victoria west colliery filter plant of damagoria colliery.
Read moreSpecial repairing of field section, pump house, battery, office rooms, providing 05 nos. structural steel gate at main entrance, renovation of damaged boundary wall at side of dumper section of excavation workshop of socp under ibva (1st re-tender)
Special repairing of field section, pump house, battery, office rooms, providing 05 nos. structural steel gate at main entrance, renovation of damaged boundary wall at side of dumper section of excavation workshop of socp under ibva (1st re-tender)
Read moreFabrication, painting three nos. base frame and installation of 1000 gpm motor- pump on the fabricated base frame for coming monsoon 2024 at tapin north open cast under hazaribagh area
Fabrication, painting three nos. base frame and installation of 1000 gpm motor- pump on the fabricated base frame for coming monsoon 2024 at tapin north open cast under hazaribagh area
Read moreInstallation of 2000 gpm pump- motor with base frame, fabrication modification followed by supplying and fixing tire coupling r-140, base frame foot bolt, suction and delivery nipple fabrication fitting to install additional pump at main sump
Installation of 2000 gpm pump- motor with base frame, fabrication modification followed by supplying and fixing tire coupling r-140, base frame foot bolt, suction and delivery nipple fabrication fitting to install additional pump at main sump
Read moreFabrication of base plate/frame, suction bends and delivery bends for operation of 2000 gpm pump and ht motor under dakra ocp, nk area.
Fabrication of base plate/frame, suction bends and delivery bends for operation of 2000 gpm pump and ht motor under dakra ocp, nk area.
Read more(a) lifting /shifting of (a) 01 no. 3000 gpm pump-motor set (b) 01 no. 2000 gpm pump-motor set (c) 02 no. 4000 gpm pump-motor set (b) lifting/shifting of 01 no. 2000 gpm pump -motor setat 09 no. siding of amal.nt-st-jg colliery under lodna
(a) lifting /shifting of (a) 01 no. 3000 gpm pump-motor set (b) 01 no. 2000 gpm pump-motor set (c) 02 no. 4000 gpm pump-motor set (b) lifting/shifting of 01 no. 2000 gpm pump -motor setat 09 no. siding of amal.nt-st-jg colliery under lodna
Read moreRepairing of base plate and foundation of pump motor set 2000 gpm pump make kirlosker installed at mine under kathara colliery
Repairing of base plate and foundation of pump motor set 2000 gpm pump make kirlosker installed at mine under kathara colliery
Read moreFabrication of base plate/frame, suction bends and delivery bends for operation of 2000 gpm and 1000 gpm and ht motor under dakra project, nk area
Fabrication of base plate/frame, suction bends and delivery bends for operation of 2000 gpm and 1000 gpm and ht motor under dakra project, nk area
Read moreDismantling, shifting and installation of 02 nos. 1000 gpm pump and 02 nos. 2000 gpm pump for 06(six) months with base frame, suction pipeline, delivery pipeline, valves etc. at shifted location for pump shifting in the mines as per requirement.
Dismantling, shifting and installation of 02 nos. 1000 gpm pump and 02 nos. 2000 gpm pump for 06(six) months with base frame, suction pipeline, delivery pipeline, valves etc. at shifted location for pump shifting in the mines as per requirement
Read moreof your Industry type