Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Design Verification Supply Installation Testing And Commissioning Of Em Works Including Fire Detection And Alarm System Of 13 Elevated Stations Of Metro Line 6 Of Mumbai Metro Rail Project Of Mmrda
|
| Description |
Design Verification Supply Installation Testing And Commissioning Of Em Works Including Fire Detection And Alarm System Of 13 Elevated Stations Of Metro Line 6 Of Mumbai Metro Rail Project Of Mmrda
|
| Organisation | Government of Maharashtra |
| Tender Id | 2023_MMRDA_910753_1 |
|
Reference Number |
MMRDA/6/MMRP/CA-187 |
| Tender Fee | 3540 |
| EMD | 1 Lakh |
| Tender Value | - |
| Place | MMRDA BKC |
| Link |
View Original Tender Notice
https://mahatenders.gov.in |
| Start Date | July 12, 2023 16:30 |
| End Date |
Expired
31/10/2023
Expired 1079 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of viaduct and elevated stations of gurugram metro rail limited
Construction of viaduct and elevated stations from sector 9 metro station (exclusive) to cyber city metro station (inclusive) of gurugram metro corridor between millennium city centre and cyber city, gurugram, india.
Read moreSupply,installation, testing, commissioning and training of electrical, fire alarm and detection, fire fighting, vac and bms works for nine elevated stations
Sholinganallur lake to sipcot 2 station including stabling lines,viaduct between the stations (ch 35044.000 to 44671.000) for corridor- 3 of chennai metro rail project phase-ii.
Read morePart design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Read moreDesign verification, detail engineering, supply, installation, testing, commissioning of electrical and mechanical system, dg set, environment control system, tunnel ventilation system and building management system for 07 underground metro stations
Design verification, detail engineering, supply, installation, testing, commissioning of electrical and mechanical system, dg set, environment control system, tunnel ventilation system and building management system for 07 underground metro stations
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - metro rail stations and depot sitc of wall floor mounted power supply boxes and cables etc required for vrf outdoor units at elevated stations and fire pump panel at t..
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - metro rail stations and depot sitc of wall floor mounted power supply boxes and cables etc required for vrf outdoor units at elevated stations and fire pump panel at t..
Read moreAnnual rolling shutter maintenance of 30 nos of elevated and underground stations and 2 depots of pune metro project for a period of one year.
Annual rolling shutter maintenance of 30 nos of elevated and underground stations and 2 depots of pune metro project for a period of one year.
Read moreDesign and construction of elevated viaduct twin tunnel by shield tbm cut and cover tunnel mid ventilation cum emergency egress shaft crosspassages ramps two underground stations bengali chauraha and palasia chauraha including architectural finishing
Design and construction of elevated viaduct twin tunnel by shield tbm cut and cover tunnel mid ventilation cum emergency egress shaft crosspassages ramps two underground stations bengali chauraha and palasia chauraha including architectural finishing
Read moreRequirement of parking lighting works and viaduct lighting work elevated metro stations in jmrc
Requirement of parking lighting works and viaduct lighting work elevated metro stations in jmrc
Read moreDdc for design of 25 kv overhead equipment (ohe) system for the elevated line, power supply and scada for both underground and elevated lines including checking of design of receiving substations and design validation of jaipur metro phase-2 project.
Ddc for design of 25 kv overhead equipment (ohe) system for the elevated line, power supply and scada for both underground and elevated lines including checking of design of receiving substations and design validation of jaipur metro phase-2 project.
Read moreAnnual civil maintenance of 28 nos of elevated and underground stations, 12.15 kms of tunnel and 2 depots of pune metro project for a period of one year.
Annual civil maintenance of 28 nos of elevated and underground stations, 12.15 kms of tunnel and 2 depots of pune metro project for a period of one year.
Read moreof your Industry type