Tender Details

Particulars Details
Title
State Plan 2023 2024 Online Sewerage Water Quality Monitoring System At Sewerage Treatment Plant At Chakkumkandam For Guruvayur Sewerage Scheme General Civil Work
Description
State Plan 2023 2024 Online Sewerage Water Quality Monitoring System At Sewerage Treatment Plant At Chakkumkandam For Guruvayur Sewerage Scheme General Civil Work
Organisation Kerala Water Authority | State Govt. and UT
Tender Id 2024_KWA_652754_1
Reference
Number
139/EE/PHD/TSR/2023-24
Tender Fee 2760
EMD 50000
Tender Value -
Place Guruvayur
Link
View Original Tender Notice

https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1005663

Start Date February 01, 2024 23:00
End Date
Expired 08/02/2024

Expired 976 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Comprehensive operation and maintenance and special repair of 110 nos ward level piped water supply schemes (non quality) & 16 nos pws scheme based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bill for five years. no. of schemes: wls(non quality): 110 pws(non quality): 16 p h division jhanjharpur

Comprehensive operation and maintenance and special repair of 110 nos ward level piped water supply schemes (non quality) & 16 nos pws scheme based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bill for five years. no. of schemes: wls(non quality): 110 pws(non quality): 16 p h division jhanjharpur

Read more
Supply, installation and cmc of online water quality monitoring system in mine discharge water at ik-1a incline and srpocp, srp area. cmc is for a period of 3 years for ik-1a inc and 2 years for srpocp respectively after completion of two years warranty period, as per the technical specifications, terms and conditions of nit document.

Supply, installation and cmc of online water quality monitoring system in mine discharge water at ik-1a incline and srpocp, srp area. cmc is for a period of 3 years for ik-1a inc and 2 years for srpocp respectively after completion of two years warranty period, as per the technical specifications, terms and conditions of nit document.

Read more
Supply, installation and commissioning of vibration monitoring system (vms) for generating unit at pjhes (revulapally(v), jogulamba gadwal (dist.))

Supply, installation and commissioning of vibration monitoring system (vms) for generating unit at pjhes (revulapally(v), jogulamba gadwal (dist.))

Read more
Gr no-01 comprehensive operation and maintenance, routine repairs and special repairs of i.) rural piped water supply scheme (pws-10 schemes), ii.) ward level piped water supply schemes in quality affected wards (wls_quality-70 schemes) and iii.) ward level piped water supply schemes in non quality affected wards(wls_non quality-359 schemes) based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bills for five years.

Gr no-01 comprehensive operation and maintenance, routine repairs and special repairs of i.) rural piped water supply scheme (pws-10 schemes), ii.) ward level piped water supply schemes in quality affected wards (wls_quality-70 schemes) and iii.) ward level piped water supply schemes in non quality affected wards(wls_non quality-359 schemes) based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bills for five years.

Read more
Operation & maintenance of part i: fixed operation of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality), iii.) ward level piped water supply schemes in non quality affected wards (wls_non quality) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive operation & maintenance of i.) rural piped water supply scheme (pws)

Operation & maintenance of part i: fixed operation of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality), iii.) ward level piped water supply schemes in non quality affected wards (wls_non quality) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive operation & maintenance of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality) iv.) ward level piped water supply schemes in non quality affected wards (wls_non quality) , i.e. the cost of chemicals, overhauling of filter media and related appurtenances, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of engineer-in-charge. in blocks:- 08 total no. of schemes: 280 wls(non quality): 226 wls(quality): 05 pws (non quality): 35 svs (non quality): 14

Read more
A) replacement of 200mm dia sewerage line from 3-4-3/19/g/a to 3-4-63-19/a/1 in sreeramanapuram street no.1, b) replacement of old agede 200mm dia sewerage sewer line from h.no.3-4-63/19/92 to 3-4-63/19/67 in sreeramanpuram, c) laying and jointing of sewerage sewer line from grave yard to 3-4-63/19/53 in sreeramanapuram under uppal ward, uppal circle-9, uppal zone-ii

A) replacement of 200mm dia sewerage line from 3-4-3/19/g/a to 3-4-63-19/a/1 in sreeramanapuram street no.1, b) replacement of old agede 200mm dia sewerage sewer line from h.no.3-4-63/19/92 to 3-4-63/19/67 in sreeramanpuram, c) laying and jointing of sewerage sewer line from grave yard to 3-4-63/19/53 in sreeramanapuram under uppal ward, uppal circle-9, uppal zone-ii

Read more
Procurement of blast monitoring seismograph and digital thermometer with probe for gdk coal mine (no.2, 2a, and 5), rg-1 area

Procurement of blast monitoring seismograph and digital thermometer with probe for gdk coal mine (no.2, 2a, and 5), rg-1 area

Read more
Supply and delivery of coagulants, disinfectant for water supply treatment in bodhan municipality under 15th fc tied grants

Supply and delivery of coagulants, disinfectant for water supply treatment in bodhan municipality under 15th fc tied grants

Read more
Pp frp (poly propylene fibreglass reinforced plastic) tank at effluent treatment plant of cam division, ktps-vi stage

Pp frp (poly propylene fibreglass reinforced plastic) tank at effluent treatment plant of cam division, ktps-vi stage

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise