Tender Details
Particulars | Details |
---|---|
Title |
Replacement, Repairing Of Worn Out Intermediate Frame And Deck Plates, Installation And Erection Of Idler Frame With Rollers, Rollers, Fabrication And Erection Of Same At 902 2 Tail End Side Belt Conveyor Of Ps 9 Section At Madhuban Coal Washe
|
Description |
Replacement, Repairing Of Worn Out Intermediate Frame And Deck Plates, Installation And Erection Of Idler Frame With Rollers, Rollers, Fabrication And Erection Of Same At 902 2 Tail End Side Belt Conveyor Of Ps 9 Section At Madhuban Coal Washe
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2025_BCCL_330472_1 |
Reference Number |
BCCL/PO/MCW/E-TENDER/ 2024-25/125 |
Tender Fee | 0 |
EMD | 2699 |
Tender Value | |
Place | MADHUBAN COAL WASHERY |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=342554 |
Start Date | February 28, 2025 14:30 |
End Date |
08/03/2025 ( Expired 90 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Echp-i- reconditioning of worn out various size idler rollers for conveyor-17,19 etc
Echp-i- reconditioning of worn out various size idler rollers for conveyor-17,19,43,45,46,47,bfd-8, bfd-9a 9b and rbfd 11
Read moreMtps i mill plant unit i removal of worn out thinned out wall plates of coal bunkers 1d 1e 1f and erection of new wall plates of 12 mm thick ms plates and supporting beams and other related works
Mtps i mill plant unit i removal of worn out thinned out wall plates of coal bunkers 1d 1e 1f and erection of new wall plates of 12 mm thick ms plates and supporting beams and other related works
Read moreRepairing , replacement and maintenance of drive unit , driven drum structure , side plates carrying rollers and rollers of conveyor gathering belt no. 1 of preparation plant at bhojudih coal washery.
Repairing , replacement and maintenance of drive unit , driven drum structure , side plates carrying rollers and rollers of conveyor gathering belt no. 1 of preparation plant at bhojudih coal washery.
Read moreRepairing, fabrication and erection of b side hopper liner, mother plates, hopper tray(plates, angles) and b side hopper supporting structure in pch section of sawang washery.
Repairing, fabrication and erection of b side hopper liner, mother plates, hopper tray(plates, angles) and b side hopper supporting structure in pch section of sawang washery.
Read moreRepairing, fabrication and erection of b side hopper liner, mother plates, hopper tray(plates, angles) and b side hopper supporting structure in pch section of sawang washery.
Repairing, fabrication and erection of b side hopper liner, mother plates, hopper tray(plates, angles) and b side hopper supporting structure in pch section of sawang washery.
Read moreDismantling fabrication erection and alignment of belt structure of 308 a n b side and side frame receiving chutes of secondary crusher a n b side of raw coal section at rajrappa washery project.
Dismantling fabrication erection and alignment of belt structure of 308 a n b side and side frame receiving chutes of secondary crusher a n b side of raw coal section at rajrappa washery project.
Read moreFabrication and installation of new slider frame after dismantling and removal of existing worn-out slider of slidding pulley of unit c-1 and c-2 belt conveyor at moonidih coal washery.
Fabrication and installation of new slider frame after dismantling and removal of existing worn-out slider of slidding pulley of unit c-1 and c-2 belt conveyor at moonidih coal washery.
Read moreReplacement of 2 nos. of snub drum assembly after dismantling of existing worn-out drum for unit c-1 belt conveyor and refitting of all its accessories at moonidih coal washery.
Replacement of 2 nos. of snub drum assembly after dismantling of existing worn-out drum for unit c-1 belt conveyor and refitting of all its accessories at moonidih coal washery.
Read moreSteel structural work for complete dismantling, fabrication and erection of deck sheets, chequered plates with supporting structure along with foundation strengthening in crusher house, conveyor 8c,9c,10c,11c,1c and 2c in chp phase-i and phase-ii
Steel structural work for complete dismantling, fabrication and erection of deck sheets,chequered plates with supporting structure along with foundation strengthening in crusher house,conveyor 8c,9c,10c,11c,1c and 2c in chp phase-i and phase-ii
Read moreUpkeepment of jammed hopper no. 03 and 04 of 701 belt conveyor at ps-5 section at madhuban coal washery under block-ii area, bccl .
Upkeepment of jammed hopper no. 03 and 04 of 701 belt conveyor at ps-5 section at madhuban coal washery under block-ii area, bccl .
Read moreof your Industry type