Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚆 Procurement Notice: Bbza Division Infrastructure Upgrade 🛠️ The Ministry Of Railways, Central Government, Invites Bids For The Replacement Of Corroded Bottom Booms, Roller And Rocker Bearings, And The Provision Of Top Boom Inspection Arrangements For The 544 Dn At Km 682/18 30 And 703 Up At Km 744/17 29 On The Sse/Br/I/Rjy Section. Additionally, The Project Includes The Construction Of Side Footpaths And Inspection Arrangements At Bridge No 510 Up&Dn And 615 Up&Dn. 📅 Bid Submission Deadline: May 21, 2024, 3:00 Pm Emd: Inr 2,58,100 Interested Bidders Are Advised To Review The Complete Tender Document For Detailed Specifications, Project Scope, And Submission Guidelines. Keywords: Bbza Division, Infrastructure Upgrade, Railway Bridge, Maintenance, Tender, Ministry Of Railways, Central Government, Secunderabad| Particulars | Details |
|---|---|
| Title |
Bbza Division: Za Vskp Section: Replacement Of Exg Corroded, Perforated Bottom Boom Of Bay No. 1 In Span No. 1 And Roller &Amp Rocker Bearing On Abutment 1 (Tuni End), Provision Of Top Boom Inspection Arrangements For 544 Dn At Km 682/18 30 Between Tuni Glu Stations And 703 Up At Km 744/17 29 Between Bvm Akp Stations Of Sse/Br/I/Rjy Section And Provision Of Side Foot Path And Inspection Arrangements At Bridge No 510 Up&Amp Dn And 615 Up&Amp Dn
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 74083154 |
|
Reference Number |
E-06-Bridges-BZA-2024 |
| Tender Fee | 0 |
| EMD | 2.58 Lakh |
| Tender Value | - |
| Place | Secunderabad |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/052024/74083154/viewNitPdf_4507244.pdf |
| Start Date | April 26, 2024 16:45 |
| End Date |
Expired
21/05/2024
Expired 877 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Custom bid for services - comprehensive mechanized cleaning activity at nsg 3 stations of cluster a group ie at akp tuni slo cct ee and tdd stations inclusive of pest and rodent control activity and inclusive of gst 18 percentage on outcome basis for..
Custom bid for services - comprehensive mechanized cleaning activity at nsg 3 stations of cluster a group ie at akp tuni slo cct ee and tdd stations inclusive of pest and rodent control activity and inclusive of gst 18 percentage on outcome basis for..
Read moreBza division - 1) provision of divyangjan facilities at way side stations in sse/ works/ tuni section under aden/ tuni sub-division; 2) bza-vskp section:- provision of water supply system & ro plants between chebrolu-duvvada stations; 3) glu, reg,nasp;- construction of irs type pf shelters on pf no. 1,2&3 in sse/w/tuni section; 4) provision of cover over platform shelters of irs type on platform 1,2&3 at anv in aden/ slo sub division; 5) provision of cover over platform shelters of
Bza division - 1) provision of divyangjan facilities at way side stations in sse/ works/ tuni section under aden/ tuni sub-division; 2) bza-vskp section:- provision of water supply system & ro plants between chebrolu-duvvada stations; 3) glu, reg,nasp;- construction of irs type pf shelters on pf no. 1,2&3 in sse/w/tuni section; 4) provision of cover over platform shelters of irs type on platform 1,2&3 at anv in aden/ slo sub division; 5) provision of cover over platform shelters of
Read moreBza division: bza-vskp section: replacement of exg corroded, perforated bottom boom of bay no. 1 in span no. 1 and roller & rocker bearing on abutment 1 (tuni end), provision of top boom inspection arrangements for 544dn at km 682/18-30 between tuni-glu stations and 703 up at km 744/17-29 between bvm-akp stations of sse/br/i/rjy section and provision of side foot path and inspection arrangements at bridge no 510 up&dn and 615 up&dn
For complete deion and other details, please refer to tender
Read moreReplacement of panel interlocking with electronic interlocking and replacement of outdoor gears at dwp, kym, pua, bvm, bpy and tuni stations between bza-dvd of vijayawada division.
For complete deion and other details, please refer to tender
Read moreSw-i : improvements to passenger amenities at way side stations between tuni-thy under sse/ works/tuni section in aden/tuni sub-division. sw-ii : tuni - bza division : augmentation of tr.d depots at tuni station. sw-iii: tuni - replacement or reroofing of age old kutcha type staff quarters type-ii-6 units.(tuni/37 a-d & tuni 6 /a-b) in sse/works/tuni section under aden/tuni sub division.
For complete deion and other details, please refer to tender
Read moreSw-i : glu,nrp,reg,nasp,bvm,thy & ksk - provision of toilets on platforms with watering arrangements in tuni section under aden/tuni sub-division. sw-ii : provision of electronic interlocking at anakapalli, bayyavaram, gullipadu and tuni stations between slo-vskp section on high density network routes of vijayawada division - replacement of codal life completed panel interlocking both indoor & outdoor gears at gullipadu station (proposed construction of two relay room huts & one s
For complete deion and other details, please refer to tender
Read moreSw-i : repairs to fobs at tuni, nrp and akp stations in sse/works/tuni section under aden/tuni sub-division. sw-ii : repairs to fobs at dwp, apt, slo, spvm, cct, coa, pap, glp and anv stations in sse/works/slo section under aden/slo sub-division. sw-iii : repairs to fob s at psda, kvr, gvn and rjy stations in sse/works/rjy section under aden/rjy sub-division. sw-iv : repairs to fob s at cel, tdd and ndd stations in sse/works/ndd section under aden/rjy sub-division.
For complete deion and other details, please refer to tender
Read moreSw-i : repairs to fobs at tuni, nrp and akp stations in sse/works/tuni section under aden/tuni sub-division. sw-ii : repairs to fobs at dwp, apt, slo, spvm, cct, coa, pap, glp and anv stations in sse/works/slo section under aden/slo sub-division. sw-iii : repairs to fob s at psda, kvr, gvn and rjy stations in sse/works/rjy section under aden/rjy sub-division. sw-iv : repairs to fob s at cel, tdd and ndd stations in sse/works/ndd section under aden/rjy sub-division.
For complete deion and other details, please refer to tender
Read moreBza division: bza-vskp section: metalizing of cross girders in the floor system of br no. 248a (rail-cum-road bridge) and sectional bridges 8dn, 102dn, 248/c& 248/e in sse/br-ii/rjy section and br.no.544 dn at km. 682/18-30 between tuni-glu stations and br.no.703 up at km.744/17-29 between bvm-akp stations and sectional bridges br.nos. 615 up& dn, 510 up& dn, 470 up& dn, 460 up& dn and 452 up& dn of sse/br/i/rjy under aden/br/n/bza jurisdiction.
For complete deion and other details, please refer to tender
Read moreBza division: bza-vskp section: metalizing of cross girders in the floor system of br no. 248a (rail-cum-road bridge) and sectional bridges 8dn, 102dn, 248/c& 248/e in sse/br-ii/rjy section and br.no.544 dn at km. 682/18-30 between tuni-glu stations and br.no.703 up at km.744/17-29 between bvm-akp stations and sectional bridges br.nos. 615 up& dn, 510 up& dn, 470 up& dn, 460 up& dn and 452 up& dn of sse/br/i/rjy under aden/br/n/bza jurisdiction.
For complete deion and other details, please refer to tender
Read moreof your Industry type