Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Sitc And Post Warranty Camc Of Medical Equipments (Group Iv)
|
Description |
Sitc And Post Warranty Camc Of Medical Equipments (Group Iv)
|
Organisation | SHRI MATA VAISHNO DEVI SHRINE BOARD | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1000 |
EMD | 2.6 Lakh |
Tender Value | |
Place | SMVDSB, Katra |
Link |
AAAAAAAAAA Login to view |
Start Date | July 13, 2025 17:30 |
End Date |
23/07/2025 ( 19 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Licensing of co-branding and inside advertising rights of four (4) no. underground metro stations (medical college-r.b.s college) of agra metro rail corridor-1 in upmrc network as per scope of work mentioned in tender document
Licensing of co-branding and inside advertising rights of four (4) no. underground metro stations (medical 
 college-r.b.s college) of agra metro rail corridor-1 in upmrc network as per scope of work mentioned in tender document
Read moreSitc for modification/ shifting of works of 11 kv and lt electrical utilities of brpl and dismantling/relocation of high mast and street lights of pwd and other agencies infringing lajpat nagar to saket g block corridor line 11.
Sitc for modification/ shifting of works of 11 kv and lt electrical utilities of brpl and dismantling/relocation of high mast and street lights of pwd and other agencies infringing lajpat nagar to saket g block corridor line 11.
Read moreBalance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Read moreCarrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(
Carrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(
Read moreSupply installation implementation training and maintenance of tally software for hmt group of companies in india deployed on a cloud server
Supply installation implementation training and maintenance of tally software for hmt group of companies in india deployed on a cloud server
Read moreSupply, fabrication, assembly and installation of stainless steel equipments in laundry area at wmp, frfcf
Supply, fabrication, assembly and installation of stainless steel equipments in laundry area at wmp, frfcf
Read moreConstruction of medical college at atal bihari vajpayee institute of medical sciences and dr. ram manohar lohia hospital, delhi
Construction of medical college at atal bihari vajpayee institute of medical sciences and dr. ram manohar lohia hospital, new delhi
Read moreDes, storage, cwe of suitable sitc of 5 mwp rooftop solar pv project including o and m of the project in resco model for a period of 25 years overdmrcs phase-iv network (part-ii) comprising of line-08 ext ,line-10 and rss.
Des, storage, cwe of suitable sitc of 5 mwp rooftop solar pv project including o and m of the project in resco model for a period of 25 years overdmrcs phase-iv network (part-ii) comprising of line-08 ext ,line-10 and rss.
Read moreConstruction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreDc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.
Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.
Read moreof your Industry type