Tender Details
Particulars | Details |
---|---|
Title |
Upso Ii/Loni Bp/Deshaping Machine/2023/Lt 33
|
Description |
Detailed Design, Engineering, Manufacture, Supply, Installation And Commissioning Of 2 Nos. Of Cylinder De Shaping Machines Complete With All Accessories At Lpg Bottling Plant Loni, Ghaziabad.
|
Organisation | IndianOil Corporation Limited(IOCL) |
Tender Id | 2023_UPSO2_172868_1 |
Reference Number |
UPSO-II/LONI BP/Deshaping Machine/2023/LT-33 |
Tender Fee | |
EMD | 0 |
Tender Value | |
Place | LONI BP |
Link | https://iocletenders.nic.in |
Start Date | November 11, 2023 14:30 |
End Date |
20/11/2023 ( Expired 543 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repair maintenance of 33 kv mrs yard and other allied works at dolphin hill, ins eksila, nad and dega area under age em ii of ge u i visakhapatnam
Repair maintenance of 33 kv mrs yard and other allied works at dolphin hill, ins eksila, nad and dega area under age em ii of ge u i visakhapatnam
Read moreRepair/replacement of lt ug cable an other connected items of external electric at valla and old amritsar cantt area under age b/r-ii at amritsar cantt
Repair/replacement of lt ug cable an other connected items of external electric at valla and old amritsar cantt area under age b/r-ii at amritsar cantt
Read moreSupplying and laying of water supply line (using hdd/micro tunneling machine) for supply of drinking water in different areas of alipurduar district under alipurduar division phe dte.(phase-ii)
Supplying and laying of water supply line (using hdd/micro tunneling machine) for supply of drinking water in different areas of alipurduar district under alipurduar division phe dte.(phase-ii)
Read moreRepair/maint of ug cable, earthing,feeder pillar boxes,lt panels street light and garden light etc at nay, mok,sfna, 33 weu, bv yard , and garuda area naval base kochi
Repair/maint of ug cable, earthing,feeder
 pillar boxes,lt panels street light and garden
 light etc at nay, mok,sfna, 33 weu, bv yard , and
 garuda area naval base kochi
Read moreWork of renovation and revamping of 2x6.3 mva, 33/11kv velim substation and enhancing the capacity of substation from 2x6.3mva to 2x6.3mva, 1x10mva under the jurisdiction of sub div ii, chinchinim, division xvi, margao
Work of renovation and revamping of 2x6.3 mva, 33/11kv velim substation and enhancing the capacity of substation from 2x6.3mva to 2x6.3mva, 1x10mva under the jurisdiction of sub div ii, chinchinim, division xvi, margao
Read moreDesign, engineering, manufacture, survey, supply, transportation, erection, testing n commissioning for (i) thickening of existing 33 kv khellani-doda-ii line and (ii) erection of new 33kv line on acsr wolf conductor from bheli ghat to dhara
Design, engineering, manufacture, survey, supply, transportation, erection, testing n commissioning for (i) thickening of existing 33 kv khellani-doda-ii line and (ii) erection of new 33kv line on acsr wolf conductor from bheli ghat to dhara
Read moreRendering services for erection and start-up of proposed tissue machine of tnpl unit ii including isbl piping, electrical and instrumentation works
Rendering services for erection and start-up of proposed tissue machine of tnpl unit ii including isbl piping, electrical and instrumentation works
Read moreShifting of 33 kv badabazar feeder for development of maa samaleswari temple area under samalei plan- phase-ii at sambalpur under badabazar electrical section.
Shifting of 33 kv badabazar feeder for development of maa samaleswari temple area under samalei plan- phase-ii at sambalpur under badabazar electrical section.
Read moreEmergency hydraulic disc brake system for crane #2020(03a) & 2133(33) of sms-ii in rsp
Design, engineering, manufacturing, supply, transportation, erection & commissioning of emergency hydraulic disc brake system for crane #2020(03a) & 2133(33) of sms-ii in rourkela steel plant.
Read moreTtps operation circle cad annual maintenance of unit ii lt 415v ac switch gear bus modules, incomer breaker, tie breaker and 6.6kv/433v, 1600kva, acwph service transformer ii during the forth coming annual overhaul period 2025 to 2026 in acwph
Ttps operation circle cad annual maintenance of unit ii lt 415v ac switch gear bus modules, incomer breaker, tie breaker and 6.6kv/433v, 1600kva, acwph service transformer ii during the forth coming annual overhaul period 2025 to 2026 in acwph
Read moreof your Industry type