Tender Details
Particulars | Details |
---|---|
Title |
Shifting Of Existing Water Supply Pipeline Coming Under Alignment Of Village Road Proposed For Widening In Dnh Area (6th Call)
|
Description |
Shifting Of Existing Water Supply Pipeline Coming Under Alignment Of Village Road Proposed For Widening In Dnh Area (6th Call)
|
Organisation | UT Administration of Dadra and Nagar Haveli | State Govt. and UT |
Tender Id | 2025_UTDNH_7553_1 |
Reference Number |
E TENDER NOTICE NUMBER 05 OF 2025-2026 |
Tender Fee | 3000 |
EMD | 9.93 Lakh |
Tender Value | |
Place | DNH |
Link | https://dnhtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=7746 |
Start Date | April 29, 2025 18:30 |
End Date |
09/05/2025 ( Expired 6 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Read moreDesign and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Design and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Read moreAAAAAAAAAA
Login to viewBalance pipeline laying, road repair with allied works under proposed ground water based asuti i asuti ii and chatta gp pwss to accommodate fhtc in thakurpukur-maheshtala block under swd - i, p.h.e. dte district south 24 parganas.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read moreQuality improvement of drinking water supply by way of construction of 07 (seven) nos. of 5000 gph capacity package type irp in/c 03 nos. semi permanent irp pump house under the jurisdiction of sub-division, kamalpur during the year 2024-25/group-i.
Quality improvement of drinking water supply by way of construction of 07 (seven) nos. of 5000 gph capacity package type irp in/c 03 nos. semi permanent irp pump house under the jurisdiction of sub-division, kamalpur during the year 2024-25/group-i.
Read moreMaintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Read moreConstruction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii
Construction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii&#x0d name of subwork- construction of 1000 mld intake pump house for jaipur an
Read moreRates for material use in operation and maintenance of water supply system.
Rates for material use in operation and maintenance of water supply system.
Read moreof your Industry type