Tender Details

Particulars Details
Title
Shifting Of Existing Water Supply Pipeline Coming Under Alignment Of Village Road Proposed For Widening In Dnh Area (6th Call)
Description
Shifting Of Existing Water Supply Pipeline Coming Under Alignment Of Village Road Proposed For Widening In Dnh Area (6th Call)
Organisation UT Administration of Dadra and Nagar Haveli | State Govt. and UT
Tender Id 2025_UTDNH_7553_1
Reference
Number
E TENDER NOTICE NUMBER 05 OF 2025-2026
Tender Fee 3000
EMD 9.93 Lakh
Tender Value
Place DNH
Link https://dnhtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=7746
Start Date April 29, 2025 18:30
End Date

09/05/2025 ( Expired 6 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr

Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr

Read more
Design and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc

Design and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc

Read more

Balance pipeline laying, road repair with allied works under proposed ground water based asuti i asuti ii and chatta gp pwss to accommodate fhtc in thakurpukur-maheshtala block under swd - i, p.h.e. dte district south 24 parganas.

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Read more
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)

Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)

Read more
Quality improvement of drinking water supply by way of construction of 07 (seven) nos. of 5000 gph capacity package type irp in/c 03 nos. semi permanent irp pump house under the jurisdiction of sub-division, kamalpur during the year 2024-25/group-i.

Quality improvement of drinking water supply by way of construction of 07 (seven) nos. of 5000 gph capacity package type irp in/c 03 nos. semi permanent irp pump house under the jurisdiction of sub-division, kamalpur during the year 2024-25/group-i.

Read more
Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand

Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand

Read more
Construction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii

Construction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii&amp#x0d name of subwork- construction of 1000 mld intake pump house for jaipur an

Read more
Rates for material use in operation and maintenance of water supply system.

Rates for material use in operation and maintenance of water supply system.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise