Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
⚡️ Urgent Tender: Replacement And Installation Of 11 Kv Vcb ⚡️ Purvanchal Vidyut Vitran Nigam Limited, Varanasi, A State Government Undertaking, Is Seeking Bids For The Replacement And Installation Of A Damaged 11 Kv Voltage Circuit Breaker (Vcb) Under Edd Iv,V,Vi At Edc Ii Azamgarh. 📅 Bid Submission Deadline: 04/05/2024, 12:00 Pm 💲 Tender Fee: Inr 1180 💵 Earnest Money Deposit: Inr 8500 Interested Bidders Must Possess The Necessary Technical Expertise And Experience In Handling High Voltage Electrical Equipment. Proposals Should Include Detailed Technical Specifications, Methodology, And A Timeline For Project Completion. Keywords: 11 Kv Vcb, Electrical Equipment, Replacement, Installation, Purvanchal Vidyut Vitran Nigam Limited, State Government Undertaking, Tender, Edd Iv,V,Vi, Azamgarh| Particulars | Details |
|---|---|
| Title |
Changing Of Damaged 11 Kv Vcb And Installing New 11 Kv Vcb Under Edd Iv,V,Vi Azamgarh
|
| Description |
Changing Of Damaged 11 Kv Vcb And Installing New 11 Kv Vcb Under Edd Iv,V,Vi Azamgarh
|
| Organisation | Purvanchal Vidyut Vitran Nigam Limited Varanasi | State Govt. and UT |
| Tender Id | 2024_PVVNV_923483_1 |
|
Reference Number |
71/EDC-II(A)/2023-24 |
| Tender Fee | 1180 |
| EMD | 8500 |
| Tender Value | - |
| Place | EDC-II AZAMGARH |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1594987 |
| Start Date | April 27, 2024 20:30 |
| End Date |
Expired
04/05/2024
Expired 891 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Replacement of damaged slew bearing with new one at trf make stacker cum reclaimer machine in coal handling plant of ktps-v and vi stages.
Replacement of damaged slew bearing with new one at trf make stacker cum reclaimer machine in coal handling plant of ktps-v and vi stages.
Read moreErection, testing and commissioning of switchyard for 7nos. 33/11 kv sub stations at i) mylaram (vg), (ii) sathapoor (vg), iii) marikal (vg), (iv) rachalapally (vg) v) jedipally (vg), vi) siddapur (vg), and vii) ramajipally (vg), of nagarkurnool circle
Erection, testing and commissioning of switchyard for 7nos. 33/11 kv sub stations at i) mylaram (vg), (ii) sathapoor (vg), iii) marikal (vg), (iv) rachalapally (vg) v) jedipally (vg), vi) siddapur (vg), and vii) ramajipally (vg), of nagarkurnool circle
Read moreSupply, erection, testing and commissioning of the following works on turnkey basis in narayanpet district under makthal-narayanpet-kodangal lift irrigation scheme(package-3) i) 220/11kv liss at jayamma cheruvu, perapalla(v), narayanpet(m). ii) 220kv tmdc line from existing 220/132kv kosigiss to proposed 220/11kvss at jayamma cheruvu ss (27.298km). iii) 2nos. 220kv bays at 220/132kv ss kosigi. iv) 1no.132/11kv transformer bay at existing 132/11kv panchadevpahad ss
Supply, erection, testing and commissioning of the following works on turnkey basis in narayanpet district under makthal-narayanpet-kodangal lift irrigation scheme(package-3) i) 220/11kv liss at jayamma cheruvu, perapalla(v), narayanpet(m). ii) 220kv tmdc line from existing 220/132kv kosigiss to proposed 220/11kvss at jayamma cheruvu ss (27.298km). iii) 2nos. 220kv bays at 220/132kv ss kosigi. iv) 1no.132/11kv transformer bay at existing 132/11kv panchadevpahad ss
Read moreErection, testing and commissioning of switchyard for 09nos. 33/11 kv sub stations at i) narreguda(vg), (ii) appaipally(vg), iii) lingampally (regadimylvar) (vg), (iv) polkampally (vg), v) gudur (vg), vi) jaffarpally (vg), vii) pudur (vg), viii) hazipur (vg), and ix) mekavanampally (vg), of vikarabad circle
Erection, testing and commissioning of switchyard for 09nos. 33/11 kv sub stations at i) narreguda(vg), (ii) appaipally(vg), iii) lingampally (regadimylvar) (vg), (iv) polkampally (vg), v) gudur (vg), vi) jaffarpally (vg), vii) pudur (vg), viii) hazipur (vg), and ix) mekavanampally (vg), of vikarabad circle
Read moreConstruction of rta unit office with driving track at husnabad in siddipet district. sub-work: consultancy services for preparation of (i) soil testing (ii) architectural designs and drawings (iii) structural designs and drawings (iv) mep drawings (v) periodical site visits (vi) submission of architectural as built drawings-2nd call
Construction of rta unit office with driving track at husnabad in siddipet district. sub-work: consultancy services for preparation of (i) soil testing (ii) architectural designs and drawings (iii) structural designs and drawings (iv) mep drawings (v) periodical site visits (vi) submission of architectural as built drawings-2nd call
Read moreErection, testing and commissioning of switchyard for 10nos. 33/11 kv sub stations at i) mutyalampalli(vg), ii) nalvanikunta(vg), iii) polkampally(vg), iv) chinnarevally(vg), v) gollapally(vg), vi)kallepally(vg), vii) munnanur(vg), viii) nakkalabanda(vg), ix) peddapally (vg), and x)gadiryala (vg) of mahabubnagar circle
Erection, testing and commissioning of switchyard for 10nos. 33/11 kv sub stations at i) mutyalampalli(vg), ii) nalvanikunta(vg), iii) polkampally(vg), iv) chinnarevally(vg), v) gollapally(vg), vi)kallepally(vg), vii) munnanur(vg), viii) nakkalabanda(vg), ix) peddapally (vg), and x)gadiryala (vg) of mahabubnagar circle
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreChanging of damaged 33kv vcb and construction of new vcb under edd iv,v,and vi azamgarh
Changing of damaged 33 kv vcb and construction of new vcb under edd iv,v,and vi azamgarh
Read moreof your Industry type