Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling And Withdrawal Of Ht2000 Gpm Pump, Motor Set With Their Baseplate, Starter And Its Pipe Line And Transporting To Safe Place Due To Give Free Space To The Hemm For Ob Removal At Old Ghutway Patch 3 Of Damoda Colliery.
|
| Description |
Dismantling And Withdrawal Of Ht2000 Gpm Pump, Motor Set With Their Baseplate, Starter And Its Pipe Line And Transporting To Safe Place Due To Give Free Space To The Hemm For Ob Removal At Old Ghutway Patch 3 Of Damoda Colliery.
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_BCCL_283266_1 |
|
Reference Number |
BCCL/GM/AR-1/AM (ENM)/E-TENDER/2023-24/123 |
| Tender Fee | - |
| EMD | 466 |
| Tender Value | - |
| Place | ENM DEPARTMENT, BARORA AREA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | July 10, 2023 17:30 |
| End Date |
Expired
21/07/2023
Expired 1145 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismantling and withdrawal of ht2000gpm pump, motor with their baseplate, er and its pipe line and transporting to safe place due to give free space to the hemm for ob removal at old ghutway patch-3 of damoda colliery under barora area.
Dismantling and withdrawal of ht2000gpm pump, motor with their baseplate, er and its pipe line and 
 transporting to safe place due to give free space to the hemm for ob removal at old ghutway patch-3 of damoda 
 colliery under barora area.
Read moreShifting of ht2000gpm pump, motor set in lower side of the sump due to decreasing of water level at old ghutway patch-3 of damoda colliery, barora area.
Shifting of ht2000gpm pump, motor set in lower side of the sump due to decreasing of water level at old ghutway patch-3 of damoda colliery, barora area.
Read moreShifting of ht2000gpm pump, motor in upper side of the sump due to increasing of water level and other miscellaneous pumping and pipeline works at old ghutway patch-3 of damoda colliery
Shifting of ht2000gpm pump, motor in upper side of the sump due to increasing of water level and other 
 miscellaneous pumping and pipeline works at old ghutway patch-3 of damoda colliery
Read moreMaking of 02nos.of shed through dismantling, cutting, transporting and fabrication of iron materials at weighbridge and old ghutway patch-3 for safety purpose at damoda colliery.
Making of 02nos.of shed through dismantling, cutting, transporting and fabrication of iron materials at weighbridge and old ghutway patch-3 for safety purpose at damoda colliery.
Read moreTransporting, installation of 2000gpm pump motor set at old ghutway partch-3 main sump and erection of its 8inch dia pipeline for dewatering of mine water and other miscellaneous pumping and pipeline works at old ghutway patch-3 at damoda colliery.
Transporting, installation of 2000gpm pump motor set at old ghutway partch-3 main sump and erection of its 8inch dia pipeline for dewatering of mine water and other miscellaneous pumping and pipeline works at old ghutway patch-3 at damoda colliery.
Read moreof your Industry type