Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Dismantling Of Bucket, Bucket Door Cardon Coupling From Stick Assembly, Line Boring Of 02 Nos Holes Of Stick Assembly, Fitting Of 02 Nos Bushes In Stick Assembly And 02 Nos Bushes In Cardon Coupling And Fitment Of Same Of Ln T Ck300 0696 Dakra Ocp.
|
Description |
Dismantling Of Bucket, Bucket Door Cardon Coupling From Stick Assembly, Line Boring Of 02 Nos Holes Of Stick
Assembly, Fitting Of 02 Nos Bushes In Stick Assembly And 02 Nos Bushes In Cardon Coupling And Fitment Of Same Of Ln T Ck300 0696 Dakra Ocp.
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_327798_1 |
Reference Number |
GM(NK)/Excv/eTender/24-25/101 |
Tender Fee | 0 |
EMD | 2300 |
Tender Value | |
Place | Dakra OCP |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=339776 |
Start Date | February 04, 2025 16:30 |
End Date |
13/02/2025 ( Expired 143 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Running and maintenance of existing 02 nos over head steel press tank inside police line tank compound by dismantling and re-crecting the tank in the existing location, 01 no over head steel pressed tank at sainik vishram ghar,near.........
Running and maintenance of existing 02 nos over head steel press tank inside police line tank compound by dismantling and re-crecting the tank in the existing location, 01 no over head steel pressed tank at sainik vishram ghar,near.........
Read moreDismantling idle 11 kv f-16 o/h,11kv and 6.6 kv o/h line of existing pumping of area-i under ocp m1 patch maheshpur/jogidih 11kv o/h line up to maheshpur section substation engaged in colonies/basties etc.550v o/h line from maheshpur substation
Dismantling idle 11 kv f-16 o/h,11kv and 6.6 kv o/h line of existing pumping of area-i under ocp m1 patch maheshpur/jogidih 11kv o/h line up to maheshpur section substation engaged in colonies/basties etc.550v o/h line from maheshpur substation
Read moreRepairing and fitting of (02 nos.) trolley wheel, shaft and line repairing of unit no. 930 and 932 in rlb section of kathara washery
Repairing and fitting of (02 nos.) trolley wheel, shaft and line repairing of unit no. 930 and 932 in rlb section of kathara washery
Read moreFabrication and erection of 471 screens feed collector, pipe line fitting of audco valve, supporting structure etc after complete dismantling the same at 9 meters level and scrap materials removed from working site to scrap yard at fine coal section
Fabrication and erection of 471 screens feed collector, pipe line fitting of audco valve, supporting structure etc after complete dismantling the same at 9 meters level and scrap materials removed from working site to scrap yard at fine coal section
Read moreRepairing of lhs and rhs sprocket shaft with serviceable shaft both side sprocket fitting with provided nut bolt after material filling in holes, dismantling both side track from body, track chain cutting and complete fitting work of dozer 13781
Repairing of lhs and rhs sprocket shaft with serviceable shaft both side sprocket fitting with provided nut bolt after material filling in holes, dismantling both side track from body, track chain cutting and complete fitting work of dozer 13781
Read moreRepairing of boom foundation eye with line boring in boom eye housing, fabrication of bushes in stick housing along with dismantling, repairing and fitment of tooth point adapter, tooth point and different cracks developed in boom and stick of ckd-30
Repairing of boom foundation eye with line boring in boom eye housing, fabrication of bushes in stick housing along with dismantling, repairing and fitment of tooth point adapter, tooth point and different cracks developed in boom and stick of ckd-30
Read moreA.transportation of 01 no. of defunct tg-unit-3, 02 nos. of old, obsolete tr, it accessories after dismantling from powerhouse to hydro museum premises near forebay tank and re-assembling the same and carrying out other necessary works at shp.
A.transportation of 01 no. of defunct tg-unit-3, 02 nos. of old, obsolete tr, it accessories after dismantling from powerhouse to hydro museum premises near forebay tank and re-assembling the same and carrying out other necessary works at shp.
Read moreMaking of new pin and rubber bush coupling assembly with other accessories of the four nos. of 2000 g.p.m., 150 m head pump set, in operation at karo ocp, bnk area
Making of new pin and rubber bush coupling assembly with other accessories of the four nos. of 2000 g.p.m., 150 m head pump set, in operation at karo ocp, bnk area
Read moreDismantling and fitting of track chain, replacing 02 nos. track pad and guard broken bolt taking out and straightening the track guard dozer 11902 and damaged guard welding and 08 nos of link cutting, machining and fitting in machine of dozer 11971
Dismantling and fitting of track chain, replacing 02 nos. track pad and guard broken bolt taking out and straightening the track guard dozer 11902 and damaged guard welding and 08 nos of link cutting, machining and fitting in machine of dozer 11971
Read moreGeneral fund -removal of wet silt sludge from srinivasa tiffin center to sudda vagu kaluva, vijetha school to ganesh nagar bridge, christian assembly church to gaffar bakery, sunkulamma temple to coconut shop line and various places in ward nos 22,23,24 and 25 in kurnool municipal corporation
Removal of wet silt sludge from srinivasa tiffin center to sudda vagu kaluva, vijetha school to ganesh nagar bridge, christian assembly church to gaffar bakery, sunkulamma temple to coconut shop line and various places in ward nos 22,23,24 and 25 in kurnool municipal corporation
Read moreof your Industry type