Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Work Of Various Work Site Of Kawad Due To Kawad Yatra Against Passed Estimate (Mr) Under Of Edd 4, Shamli Under Edc,Shamli
|
| Description |
Work Of Various Work Site Of Kawad Due To Kawad Yatra Against Passed Estimate (Mr) Under Of Edd 4, Shamli Under Edc,Shamli
|
| Organisation | Paschimanchal Vidyut Vitran Nigam Ltd. | State Govt. and UT |
| Tender Id | 2024_PVVNL_936102_1 |
|
Reference Number |
WORK E-TENDER NO-33/2024-25 |
| Tender Fee | 1180 |
| EMD | 1800 |
| Tender Value | |
| Place | SE, EDC SHAMLI |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1618313 |
| Start Date | July 06, 2024 22:30 |
| End Date |
Expired
15/07/2024
Expired 689 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Quick repair work of fault/damage caused due to excessive heat at all 33/11 kv substations under edd harraiya basti
Quick repair work of fault/damage caused due to excessive heat at all 33/11 kv substations under edd harraiya basti
Read moreVarious work for the strengthening of the 33 kv sub station- chowk,mukhyalaya, ghughuli, and mithaura under edd-i maharajganj and edd nichlaul)
Various work for the strengthening of the 33 kv sub station- chowk,mukhyalaya, ghughuli, and mithaura under edd-i maharajganj and edd nichlaul)
Read moreWork of ab cable in various areas under business plan 2026-27 ee, edd- harahua, varanai
Work of ab cable in various areas under business plan 2026-27 ee, edd- harahua, varanai
Read moreFor work of installed 250 kva t/f due to overloaded to additional new dt at various site under business plan scheme 2026-27 in the area of ee,(11 kv city side south side) ghaziabad. under the jurisdiction of se, eudc-i, ghaziabad.
Read moreFor work of installed 250 kva t/f due to overloaded to additional new dt at various site under business plan scheme 2026-27 in the area of ee,(11 kv city side south side) ghaziabad. under the jurisdiction of se, eudc-i, ghaziabad.
Read moreEstimate for re-organization of lt line network damaged due to land slide at village kunduni on dated 03.09.2025 in (e) section majharanoo under esd no i hpsebl, joginder nagar.
Estimate for re-organization of lt line network damaged due to land slide at village kunduni on dated 03.09.2025 in (e) section majharanoo under esd no i hpsebl, joginder nagar.
Read moreQuantum of works involved in maintenance and replacement of 33 kv, 11 kv and l.t. line which are damaged due to acciedent of vehicle, theft of wire and heavy storm (daiviya aapda) etc. under the area of edsd-i, kashi ram under the edd-i, p.d. nagar,
Quantum of works involved in maintenance and replacement of 33 kv, 11 kv and l.t. line which are damaged due to acciedent of vehicle, theft of wire and heavy storm (daiviya aapda) etc. under the area of edsd-i, kashi ram under the edd-i, p.d. nagar,
Read moreQuantum of works involved in maintenance and replacement of 33 kv, 11 kv and l.t. line which are damaged due to acciedent of vehicle, theft of wire and heavy storm (daiviya aapda) etc. under the area of edsd-iii, bicchiya under the edd-i, p.d. nagar,
Quantum of works involved in maintenance and replacement of 33 kv, 11 kv and l.t. line which are damaged due to acciedent of vehicle, theft of wire and heavy storm (daiviya aapda) etc. under the area of edsd-iii, bicchiya under the edd-i, p.d. nagar,
Read moreDue to the occurrence of faults from time to time in the vcbs installed at various sub-stations of electricity distribution division-muradnagar, work related to the repair material of vcbs for efficient operation and maintenance of power supply.
Due to the occurrence of faults from time to time in the vcbs installed at various sub-stations of electricity distribution division-muradnagar, work related to the repair material of vcbs for efficient operation and maintenance of power supply.
Read moreWork of overhauling and capacity enhancement of power transformers, as well as line construction and strengthening, within the industrial area (phase-1) under the jurisdiction of edd- chandauli pursuant to the bp 2026-27 (on semi turn-key basis).
Work of overhauling and capacity enhancement of power transformers, as well as line construction and strengthening, within the industrial area (phase-1) under the jurisdiction of edd- chandauli pursuant to the bp 2026-27 (on semi turn-key basis).
Read moreof your Industry type