Tender Details
Particulars | Details |
---|---|
Title |
Rna Extraction Kit 50 Reaction Pack 1,Rna Extraction Kit 50 Reaction Pack 2,Rna Extraction Kit 50
|
Description |
|
Organisation | Department of Agricultural Research and Education (DARE) | Ministry of Agriculture and Farmers Welfare |
Tender Id | GEM/2024/B/4418937 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | January 08, 2024 16:56 |
End Date |
18/01/2024 ( Expired 497 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
New connectivity of road from 1. l424-coloni-1 to boro kangrai, l- 2.637 km , package- tr0315-p4 , block- dasda. 2. l422-shaliram para and aniram para, l- 2.662 km, package- tr0322-p4 , block- dasda. 3. l426-sailaram and daranimohan para, l- 1.205 k
Pm-janman works
Read moreHiring services 1 number brand new tata 407 gold sfc dcr33hsd 2wd bs6 2 at plm department ps5 noonmati for a period of four years
Hiring services 1 number brand new tata 407 gold sfc dcr33hsd 2wd bs6 2 at plm department ps5 noonmati for a period of four years
Read more(i) cont. of h.l. bridge with approach road over chas nala at 5th km of dhanbad-pathardih-sindri road (2 x 14.6m and (ii) cont. of h.l. bridge with approach road over chas nala at 7th km of dps road (1 x 14.6m) under plan head for the year 2025-26.
(i) cont. of h.l. bridge with approach road over chas nala at 5th km of dhanbad-pathardih-sindri road (2 x 14.6m and (ii) cont. of h.l. bridge with approach road over chas nala at 7th km of dps road (1 x 14.6m) under plan head for the year 2025-26.
Read moreUpgradation of muktsar-abohar road via panniwala (mktodr-32) rd 0.00-19.20, 28.00-37.70 equal to 28.90 km including maintenance of road for 3 year (1 year defect liability period plus 2 year maintenance period)
Upgradation of muktsar-abohar road via panniwala (mktodr-32) rd 0.00-19.20, 28.00-37.70 equal to 28.90 km including maintenance of road for 3 year (1 year defect liability period plus 2 year maintenance period)
Read moreConstruction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreAs per attached eoi documents 1,as per attached eoi documents 2,as per attached eoi documents 3,as
Read more
Providing laying and jointing of 80 mm dia and 50 mm dia g.i. pipe line with labor and material at site ward no. 50 file no. 04/25x9/1
Providing laying and jointing of 80 mm dia and 50 mm dia g.i. pipe line with labor and material at site ward no. 50 file no. 04/25x9/1
Read moreReplacement of gate valve and sluice valve at different location with labor and material at site ward no. 50 and 52 file no. 145/25x9/1
Replacement of gate valve and sluice valve at different location with labor and material at site ward no. 50 and 52 file no. 145/25x9/1
Read moreBiennial maintenance of ash slurry line extension at different dp and dp changeover (both phase -1 and phase -2) inside ash pond of sgtpp
Biennial maintenance of ash slurry line extension at different dp and dp changeover (both phase -1 and phase -2) inside ash pond of sgtpp
Read moreof your Industry type