Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Improvement And Resurfacing Of Road From Anganwadi Junction Birsa Nagar Via Attam Pahad For A Length Of 1.905 Km Including Strengthening Of Side Berms From Dollygunj Junction To Attam Pahad.
|
Description |
Improvement And Resurfacing Of Road From Anganwadi Junction Birsa Nagar Via Attam Pahad For A Length Of 1.905 Km Including Strengthening Of Side Berms From Dollygunj Junction To Attam Pahad.
|
Organisation | Chief Engineer Andaman Public Works Department (APWD) | State Govt. and UT |
Tender Id | 2024_APWD_16164_1 |
Reference Number |
No.13/EE/SAD/APWD/2024-25 |
Tender Fee | 0 |
EMD | 5.71 Lakh |
Tender Value | |
Place | EE SAD APWD Sri.Vijaya Puram |
Link | https://eprocure.andaman.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=17235 |
Start Date | October 24, 2024 21:30 |
End Date |
01/11/2024 ( Expired 242 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Improvement and upgradation of nh-727a from km 88.670 (rampur bujurg) up border to km 92.992 (mairwa) siwan for the year 2024_25 on epc mode.
Improvement and upgradation of nh-727a from km 88.670 (rampur bujurg) up border to km 92.992 (mairwa) siwan for the year 2024_25 on epc mode.
Read moreConsultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Read moreUp-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh
Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh
Read moreConstruction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreRehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Rehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Read moreCa no. cwe/hills/rkt/38 of 2025-2026 provn of chain link fencing from main office via amn points to sheradeval mandir post approx length 1.5 km and ht 09 ft at mil stn pithoragarh
Ca no. cwe/hills/rkt/38 of 2025-2026 provn of chain link fencing from main office via amn points to sheradeval mandir post approx length 1.5 km and ht 09 ft at mil stn pithoragarh
Read moreOne time improvement of nh39 from km 172.900 jotsoma bypass junction to km 185.540 lerie welcome gate length 12.64 km under pwd nh division i kohima in the state of nagaland
One time improvement of nh39 from km 172.900 jotsoma bypass junction to km 185.540 lerie welcome gate length 12.64 km under pwd nh division i kohima in the state of nagaland
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreDevelopment of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)
Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)
Read moreDevelopment of 4 lane ac greenfield regional expressway on northern side of hyderabad from pragnapur vill (dc. 82.000) to rayagiri vill (dc. 125.000) for a design length of 43.000 km in telangana under nh(o) on epc mode (package iv)
Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from pragnapur vill (dc. 82.000) to rayagiri vill (dc. 125.000) for a design length of 43.000 km in telangana under nh(o) on epc mode (package iv)
Read moreof your Industry type