Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Offloading Work For Hydraulic Pressure And Ultrasonic Thickness Testing Of 47 Nos. Pressure Vessels Installed In Different Machines And Workshop Of Excavation Department Of Block B Project
|
| Description |
Offloading Work For Hydraulic Pressure And Ultrasonic Thickness Testing Of 47 Nos. Pressure Vessels Installed In Different Machines And Workshop Of Excavation Department Of Block B Project
|
| Organisation | Northern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_NCL_330108_1 |
|
Reference Number |
BLB/EXCV/ETN/24-25/561 |
| Tender Fee | 0 |
| EMD | 800 |
| Tender Value | - |
| Place | OFFICE OF GM BLOCK-B AREA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=342188 |
| Start Date | February 25, 2025 15:00 |
| End Date |
Expired
07/03/2025
Expired 591 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ultrasonic thickness (ut) survey of pressure vessels in 500 tpd methanol plant of apl
Ultrasonic thickness (ut) survey of pressure vessels in 500 tpd methanol plant of apl
Read moreComprehensive annual maintenance contract (camc) of 14 (fourteen) nos. electric driven air compressors with air dryer and inspection, testing and certification of 14 (fourteen) nos. pressure vessels as per statutory requirement, calibration of pressure safety valve and pressure gauges installed at crw/hrt.
Comprehensive annual maintenance contract (camc) of 14 (fourteen) nos. electric driven air compressors with air dryer and inspection, testing and certification of 14 (fourteen) nos. pressure vessels as per statutory requirement, calibration of pressure safety valve and pressure gauges installed at crw/hrt.
Read moreOut sourcing of nd testing, hydraulic pressure testing, calibration of pressure gauge and relief valve and shell thickness measurement of air reciever tanks of hemm working at kkocp for period of 3 years.
Out sourcing of nd testing, hydraulic pressure testing, calibration of pressure gauge and relief valve and shell thickness measurement of air reciever tanks of hemm working at kkocp for period of 3 years.
Read moreGrp repair kit,air less spray painting machine, part no. 5 by 8 hp motor,lp air compressor with hose reel 30 mtrs, part no. 15 bar pressure,12 ft bed lathe, 220v, 3 jaw chuck, foot brake, coolant system,wood turning lathe machine,electric oven 1000w, part no. 230v ac, 50 hz,automatic winding machine,auto transformer,hydraulic power pipe bending machine, part no. thickness 2.5 mm-8
Grp repair kit,air less spray painting machine, part no. 5 by 8 hp motor,lp air compressor with hose reel 30 mtrs, part no. 15 bar pressure,12 ft bed lathe, 220v, 3 jaw chuck, foot brake, coolant system,wood turning lathe machine,electric oven 1000w, part no. 230v ac, 50 hz,automatic winding machine,auto transformer,hydraulic power pipe bending machine, part no. thickness 2.5 mm-8
Read moreOffloading work for hydraulic pressure and ultrasonic thickness testing of 47 nos. pressure vessels installed in different machines and workshop of excavation department of block-b project
Offloading work for hydraulic pressure and ultrasonic thickness testing of 47 nos. pressure vessels installed in different machines and workshop of excavation department of block-b project
Read moreOffloading work for hydraulic pressure and ultrasonic thickness testing of 216 nos pressure vessels installed in different machines and workshops of excavation department of dudhichua project
Offloading work for hydraulic pressure and ultrasonic thickness testing of 216 nos pressure vessels installed in different machines and workshops of excavation department of dudhichua project
Read moreOffloading work for hydraulic pressure and ultrasonic thickness testing of 216 nos pressure vessels installed in different machines and workshops of excavation department of dudhichua project
Offloading work for hydraulic pressure and ultrasonic thickness testing of 216 nos pressure vessels installed in different machines and workshops of excavation department of dudhichua project
Read moreOffloading work for hydraulic pressure and ultrasonic thickness testing of 219 nos pressure vessels installed in different machines and workshops of excavation department of dudhichua project
Offloading work for hydraulic pressure and ultrasonic thickness testing of 219 nos pressure vessels installed in different machines and workshops of excavation department of dudhichua project
Read moreUltrasonic thickness measurement of above ground piping and pressure vessels for vijaipur,ultrasoni
Read more
Ultrasonic thickness and hydraulic testing and certification of air receivers, pressure vessels, and tanks for hemm machines of dongri buzurg mine
Ultrasonic thickness and hydraulic testing and certification of air receivers, pressure vessels, and tanks for hemm machines of dongri buzurg mine
Read moreof your Industry type