Tender Details

Particulars Details
Title
Offloading Work For Hydraulic Pressure And Ultrasonic Thickness Testing Of 47 Nos. Pressure Vessels Installed In Different Machines And Workshop Of Excavation Department Of Block B Project
Description
Offloading Work For Hydraulic Pressure And Ultrasonic Thickness Testing Of 47 Nos. Pressure Vessels Installed In Different Machines And Workshop Of Excavation Department Of Block B Project
Organisation Northern Coalfields Limited | Public Sector Undertakings
Tender Id 2025_NCL_330108_1
Reference
Number
BLB/EXCV/ETN/24-25/561
Tender Fee 0
EMD 800
Tender Value -
Place OFFICE OF GM BLOCK-B AREA
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=342188

Start Date February 25, 2025 15:00
End Date
Expired 07/03/2025

Expired 591 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Ultrasonic thickness (ut) survey of pressure vessels in 500 tpd methanol plant of apl

Ultrasonic thickness (ut) survey of pressure vessels in 500 tpd methanol plant of apl

Read more
Comprehensive annual maintenance contract (camc) of 14 (fourteen) nos. electric driven air compressors with air dryer and inspection, testing and certification of 14 (fourteen) nos. pressure vessels as per statutory requirement, calibration of pressure safety valve and pressure gauges installed at crw/hrt.

Comprehensive annual maintenance contract (camc) of 14 (fourteen) nos. electric driven air compressors with air dryer and inspection, testing and certification of 14 (fourteen) nos. pressure vessels as per statutory requirement, calibration of pressure safety valve and pressure gauges installed at crw/hrt.

Read more
Out sourcing of nd testing, hydraulic pressure testing, calibration of pressure gauge and relief valve and shell thickness measurement of air reciever tanks of hemm working at kkocp for period of 3 years.

Out sourcing of nd testing, hydraulic pressure testing, calibration of pressure gauge and relief valve and shell thickness measurement of air reciever tanks of hemm working at kkocp for period of 3 years.

Read more
Grp repair kit,air less spray painting machine, part no. 5 by 8 hp motor,lp air compressor with hose reel 30 mtrs, part no. 15 bar pressure,12 ft bed lathe, 220v, 3 jaw chuck, foot brake, coolant system,wood turning lathe machine,electric oven 1000w, part no. 230v ac, 50 hz,automatic winding machine,auto transformer,hydraulic power pipe bending machine, part no. thickness 2.5 mm-8

Grp repair kit,air less spray painting machine, part no. 5 by 8 hp motor,lp air compressor with hose reel 30 mtrs, part no. 15 bar pressure,12 ft bed lathe, 220v, 3 jaw chuck, foot brake, coolant system,wood turning lathe machine,electric oven 1000w, part no. 230v ac, 50 hz,automatic winding machine,auto transformer,hydraulic power pipe bending machine, part no. thickness 2.5 mm-8

Read more
Offloading work for hydraulic pressure and ultrasonic thickness testing of 47 nos. pressure vessels installed in different machines and workshop of excavation department of block-b project

Offloading work for hydraulic pressure and ultrasonic thickness testing of 47 nos. pressure vessels installed in different machines and workshop of excavation department of block-b project

Read more
Offloading work for hydraulic pressure and ultrasonic thickness testing of 216 nos pressure vessels installed in different machines and workshops of excavation department of dudhichua project

Offloading work for hydraulic pressure and ultrasonic thickness testing of 216 nos pressure vessels installed in different machines and workshops of excavation department of dudhichua project

Read more
Offloading work for hydraulic pressure and ultrasonic thickness testing of 216 nos pressure vessels installed in different machines and workshops of excavation department of dudhichua project

Offloading work for hydraulic pressure and ultrasonic thickness testing of 216 nos pressure vessels installed in different machines and workshops of excavation department of dudhichua project

Read more
Offloading work for hydraulic pressure and ultrasonic thickness testing of 219 nos pressure vessels installed in different machines and workshops of excavation department of dudhichua project

Offloading work for hydraulic pressure and ultrasonic thickness testing of 219 nos pressure vessels installed in different machines and workshops of excavation department of dudhichua project

Read more
Ultrasonic thickness and hydraulic testing and certification of air receivers, pressure vessels, and tanks for hemm machines of dongri buzurg mine

Ultrasonic thickness and hydraulic testing and certification of air receivers, pressure vessels, and tanks for hemm machines of dongri buzurg mine

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise