Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Hyb Divn : Jkm Bdhn Section: Elimination Of Manned Level Crossing Gate No 4/Jb At Km 5/500 550 By Providing Rub Between Jkm Bdhn Stations.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 78843977 |
Reference Number |
80_DRM_W_HYB |
Tender Fee | 0 |
EMD | 5.38 Lakh |
Tender Value | |
Place | Secunderabad |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/012025/78843977/viewNitPdf_4796399.pdf |
Start Date | December 06, 2024 23:15 |
End Date |
06/01/2025 ( Expired 175 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Providing of solar/power caution blinkers and illumination by solar/conventional lighting at median opening locations of morth identified blackspots/accident spots of hyderabad-vijayawada section of nh-65 from km.40 to 221.500 in the state of tg, ap.
Providing of solar/power caution blinkers and illumination by solar/conventional lighting at median opening locations of morth identified blackspots/accident spots of hyderabad-vijayawada section of nh-65 from km.40 to 221.500 in the state of tg, ap.
Read moreShifting height raising of 220 kv sc shamli baghpat transmission line under etd shamli due to crossing of proposed panipat-shamli section of nh709ad pkg1 between tower location no 5 and 6 at ch 32160
Shifting height raising of 220 kv sc shamli baghpat transmission line under etd shamli due to crossing of proposed panipat-shamli section of nh709ad pkg1 between tower location no 5 and 6 at ch 32160
Read moreConstruction of limited height subway (lhs)/rub near proposed at km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Construction of limited height subway (lhs)/rub near proposed at km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Read moreInternal improvement works of section no. s-408 (package-5) for water supply scheme 1. khuban and modi khera, block abohar, distt. fazilka (under nabard xxvii/jjm)
Repair of old ohsr (250 cum), repair of pump chamber 6.10m x 4.88m, distribution system, providing and fixing household connection and site laying at head works (boundary wall, footpath etc.) complete in all respect and all other works contgent the
Read moreConstruction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreConstruction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Read moreConstruction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Read moreModification work of 132kv s/c hisar sadulpur tr. line bw loc no. 328 and 329 at railway track crossing between railway tp point 171/3 and 171/4 of hmg-sdlp section as deposit work of ms. railway (mlin/22.14) on labour rate contract basis
Modification work of 132kv s/c hisar sadulpur tr. line bw loc no. 328 and 329 at railway track crossing between railway tp point 171/3 and 171/4 of hmg-sdlp section as deposit work of ms. railway (mlin/22.14) on labour rate contract basis
Read moreBalance work in construction of rob in lieu of level crossing no. 449 at gwalior-dholpur section at the risk and cost of previous agency
Balance work in construction of rob in lieu of level crossing no. 449 at km 1262/02-04 on gwalior-dholpur section at the risk and cost of previous agency
Read moreEstimate for providing fixing damage steel wire ropes of ubdc head regulators gate no 1 2 5 6 7 9 12 and fixing er weight of gate no 5 ubdc h r gate no 1 of additional h r at headworks madhopur
Estimate for providing fixing damage steel wire ropes of ubdc head regulators gate no 1 2 5 6 7 9 12 and fixing er weight of gate no 5 ubdc h r gate no 1 of additional h r at headworks madhopurfixing er weight of gate no. 5 ubdc h/r gate n
Read moreof your Industry type