Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Py Ip Clearing Light Jungles And And Removal Of Floating Bos Putting
|
| Description |
Py Ip Clearing Light Jungles And And Removal Of Floating Bos Putting&Amp#X0d
Temporary Cross Bunds Lubricating And Controlling Shutters Etc From Main&Amp#X0d
Canal Ch 16 000km To Ch 42 500km Branch Canals Distributories And Field&Amp#X0d
Boothies
|
| Organisation | Irrigation Department | State Govt. and UT |
| Tender Id | 2024_Irrig_709690_1 |
|
Reference Number |
IRR/PI/3356/2024-2025 |
| Tender Fee | 555 |
| EMD | 4448 |
| Tender Value | - |
| Place | Perumachery |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1122436 |
| Start Date | December 05, 2024 20:30 |
| End Date |
Expired
12/12/2024
Expired 625 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Installation of new street light poles to address dark patches at csir-iict, hyderabad (phase-ii).
Installation of new street light poles to address dark patches at csir-iict, hyderabad (phase-ii).
Read morePyip _clearing light jungles and and removal of floating bos, putting temporary cross bunds, lubricating and controlling shutters etc from main canal ch.16/000km to ch 42_500km branch canals distributories and field boothies under pyip section 2_3
Pyip _clearing light jungles and and removal of floating bos, putting temporary&#x0d cross bunds, lubricating and controlling shutters etc from main canal ch.16/000km to ch 42_500km branch canals distributories and field boothies
Read moreNon plan 2025_26_pyip clearing light jungles and removal of floating bos putting temporary cross bunds lubricating and controlling shutters etc from main canal ch 0_000 km to ch 5_000 km under pyip section 1 veliyambra for the year 2025_26
Non plan 2025_26_pyip clearing light jungles and removal of floating bos putting temporary cross bunds lubricating and controlling shutters etc from main canal ch 0_000 km to ch 5_000 km under pyip section 1 veliyambra for the year 2025_26
Read morePyip clearing light jungle and removal of floating bos putting temporarycross bunds lubricating and controlling shutters etc during water distribution of main canalfrom ch5 080km to 15km edakkad branch canal
Pyip clearing light jungle and&#x0d removal of floating bos putting temporary&#x0d cross bunds lubricating and controlling shutters&#x0d etc during water distribution of main canal&#x0d etcfrom ch5 080km to 15km edakkad branch canal
Read moreClearing light jungles including over growth
Clearing light jungles including over growth and clearing &#x0d drains under b and s division angamaly for the year 2024-25&#x0d
Read moreClearing light jungles including over growth and clearing drains
Clearing light jungles including over growth and clearing drains under b and s division, angamaly for the year 2023-24.
Read morePyip_ clearing light jungle and removal of floating bos,putting temporary crossbunds lubricating and controlling shutters etc from mahe baranch canal ch.0_000 to 23_034and distributories canal and field boothies under pyip section no 3 kuthuparamb
Pyip_ clearing light jungle and removal of floating bos,putting temporary crossbunds lubricating and controlling shutters etc&#x0d from mahe baranch canal ch.0_000 to 23_034and distributories canal and field boothies&#x0d under pyip section no 3 ktpba
Read moreAction plan 2023 24 kip clearing light jungles urgent desiltation removal of floating bodies putting temporary cross bunds lubricating and controlling shutters etc for various canals under k i p o m section 1 2 .3 bharanikkavu
Clearing light jungle, removing floating bodies, earth work excation
Read moreGeneral main canal pyip clearing jungle
General main canal pyip clearing jungle&#x0d in main canal between ch 6 200km and&#x0d ch 15 000km and desiltation of cut and cover&#x0d near ch 9 500km for the year 2023 24 general&#x0d civil work&#x0d
Read moreGeneral desilting mbc pyip removal of
General desilting mbc pyip removal of slipped earth deposited on the canal bed in the open canal between ch 10 040 km and ch 10 220 km of mahe branch canal for the year 2023 24 general civil work
Read moreof your Industry type