Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of 4 Nos. Sectionalisation Stoppings In Cm Panel 6 And Panel 7 In R Vii Seam At 3 And 4 Incline Under Jpc
|
| Description |
Construction Of 4 Nos. Sectionalisation Stoppings In Cm Panel 6 And Panel 7 In R Vii Seam At 3 And 4 Incline Under Jpc
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_ECL_293943_1 |
|
Reference Number |
GM/JNR/CIVIL/e-Tender/23-24/ 444 dated 10.11.2023 |
| Tender Fee | - |
| EMD | 12700 |
| Tender Value | - |
| Place | Online |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | November 18, 2023 16:30 |
| End Date |
Expired
28/11/2023
Expired 1054 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of 03 nos sectionalisation stoppings between trunk panel and panel 8a of rvii seam at 3 and 4 unit under jpc
Construction of 03 nos sectionalisation stoppings between trunk panel and panel 8a of rvii seam at 3 and 4 unit under jpc
Read moreMaintenance of belt conveyor for cm panel of 10b(top) seam at haldibari ug mine.
Maintenance of belt conveyor for cm panel of 10b(top) seam at haldibari ug mine.
Read moreConstruction of underground drain along rviiit2, r viiib1 and r vii seam with main incline and construction of three nos. of guard wall at shyamsundarpur colliery.
Construction of underground drain along rviiit2, r viiib1 and r vii seam with main incline and construction of three nos. of guard wall at shyamsundarpur colliery.
Read moreProposal for rimming 01no bore hole from surface to rvi seam for dewatering at mic jpc
Proposal for rimming 01no bore hole from surface to rvi seam for dewatering at mic jpc
Read moreConstruction of side protection wall and construction of 245 nos. steps for cm panel of 10b seam at haldibari ug mine.
Construction of side protection wall and construction of 245 nos. steps for cm panel of 10b seam at haldibari ug mine.
Read moreConstruction of 50 nos. bricks ventilation stoppings in g-iii bottom seam at bagdewa ug mine, korba area.
Construction of 50 nos. bricks ventilation stoppings in g-iii bottom seam at bagdewa ug mine, korba area.
Read moreLine packing including packing with materials for cm panel no. 40r, 34r and 34la dev. distt. of 10b seam at haldibari ug mine.
Line packing including packing with materials for cm panel no. 40r, 34r and 34la dev. distt. of 10b seam at haldibari ug mine.
Read moreProposal for cleaning of 02 no existing bore hole from surface to rvi seam for cable lowering at mic jpc
Proposal for cleaning of 02 no existing bore hole from surface to rvi seam for cable lowering at mic jpc
Read moreCleaning of debris mixed with coal at r-vii bonbahal seam of porascole west colliery
Cleaning of debris mixed with coal at r-vii bonbahal seam of porascole west colliery
Read moreConstruction of 02 nos. complete isolation stoppings (fly ash bricks) and 04 nos. preparatory complete isolation stoppings, including all materials, in 32l dep. panel, lws at tawa-ii mine, pathakhera area, wcl
Construction of 02 nos. complete isolation stoppings (fly ash bricks) and 04 nos. preparatory complete isolation stoppings, including all materials, in 32l dep. panel, lws at tawa-ii mine, pathakhera area, wcl
Read moreof your Industry type