Tender Details
Particulars | Details |
---|---|
Title |
Master Controller For 3 Phase Electric Loco To Clw Specn.No. Clw/Es/3/0031, Alt I
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 106574384 |
Reference Number |
71255051 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Chennai |
Link | https://www.ireps.gov.in/ireps/supply/pdfdocs/022025/106589570/viewNitPdf_4845698.pdf |
Start Date | January 24, 2025 22:50 |
End Date |
03/02/2025 ( Expired 124 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of four laning of nanasa to pidgaon section of nh47 old nh59a indore harda pkgiii length 47.445km design ch. 95.000 km to 142.445 km under bharatmala pariyojna phase-i economic corridor in the state of mp on ham basis
Ie services for construction of four laning of nanasa to pidgaon section of nh47 old nh59a indore harda pkgiii length 47.445km design ch. 95.000 km to 142.445 km under bharatmala pariyojna phase-i economic corridor in the state of mp on ham basis
Read moreRate contract for creation of 25 kva 63 kva 100 kva 250 kva 3-phase distribution transformer on turnkey basis at different locations along with ht/lt in electric division-iiijammu during the fin yr 2025-26 or till next tender is finalized.
Rate contract for creation of 25 kva 63 kva 100 kva 250 kva 3-phase distribution transformer on turnkey basis at different locations along with ht/lt in electric division-iii jammu during the fin yr 2025-26 or till next tender is finalized.
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreSitc of 82.5kva 3 phase silent canopy type dg for providing electric power back to ob-8 building narwal jammu
Sitc of 82.5kva 3 phase silent canopy type dg for providing electric power back to ob-8 building narwal jammu
Read moreSupply and delivery of 1800 nos rachyem indo macedon sintex equivalent make lt distribution junction box along with pole mounting clamps for service line 3 phase 4 wire connection in ab cable system to wbsedcls malda gazole and chanchal store
Supply and delivery of 1800 nos rachyem indo macedon sintex equivalent make lt distribution junction box along with pole mounting clamps for service line 3 phase 4 wire connection in ab cable system to wbsedcls malda gazole and chanchal store
Read moreProcurement of 100nb size electric resistance welded steel pipes confirming to is 1239 part i-2004 grade fe 410 for ph-iv stps sarni.
Procurement of 100nb size electric resistance welded steel pipes confirming to is 1239 part i-2004 grade fe 410 for laying of pipeline for disposal of ro-reject water of effluent treatment plant ph-iv to dust suppression/sprinkler system of chp-iv
Read moreWatch and ward services to rnd estates at drdo township, phase-i, (gate no.1, gate no.2, gate no.3, kv side gates and common amenities gates) cv raman nagar, bangalore
Watch and ward services to rnd estates at drdo township, phase-i, (gate no.1, gate no.2, gate no.3, kv side gates and common amenities gates) cv raman nagar, bangalore
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreOm of cpws scheme to balance habitations in srikakulam and gara mandal (phase-i killipalem project) for the year 2025-26 (excluding power charges)
Om of cpws scheme to balance habitations in srikakulam and gara mandal (phase-i-killipalem project) for the year 2025-26 (excluding power charges)
Read moreEstimate for construction of new 11 kv ht line and 3 - phase lt line and lt re-organization to proposed 25 kva ,11/0.4 kv s/stn thalehar in (e) section ahju under electrical sub- division, hpsebl, chauntra
Estimate for construction of new 11 kv ht line and 3 - phase lt line and lt re-organization to proposed 25 kva ,11/0.4 kv s/stn thalehar in (e) section ahju under electrical sub- division, hpsebl, chauntra
Read moreof your Industry type