Tender Details
Particulars | Details |
---|---|
Title |
Master Controller For 3 Phase Electric Loco To Clw Specn.No. Clw/Es/3/0031, Alt I
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 106574384 |
Reference Number |
71255051 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Chennai |
Link | https://www.ireps.gov.in/ireps/supply/pdfdocs/022025/106589570/viewNitPdf_4845698.pdf |
Start Date | January 24, 2025 22:50 |
End Date |
03/02/2025 ( Expired 77 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreSupply ,erection, testing and commissioning works for interconnection arrangement (tie feeder) of 6.6kv cubical switchgear panels incorporating vcb( vacuum circuit breaker rating- 12kv, 3150amp.,isc- 40ka at the rate 1sec.) for phase -i to phase- i
Supply ,erection, testing and commissioning works for interconnection arrangement (tie feeder) of 6.6kv cubical switchgear panels incorporating vcb( vacuum circuit breaker rating- 12kv, 3150amp.,isc- 40ka at the rate 1sec.) for phase -i to phase- i
Read moreIe services for o and m stage of 4 laning of dhangaon boregaon section of nh 347bg and 753l indore boregaon pkg iv from design ch. 81.000 to km. 139.000 length 58.00 km under bharatmala pariyojana phase i in the state of mp on ham
Ie services for o and m stage of 4 laning of dhangaon boregaon section of nh 347bg and 753l indore boregaon pkg iv from design ch. 81.000 to km. 139.000 length 58.00 km under bharatmala pariyojana phase i in the state of mp on ham
Read moreProvn of married accn for officers and airmen at 3 afsb gandhinagar (phase-i)
Provn of married accn for officers and airmen at 3 afsb gandhinagar (phase-i)
Read moreSelection of contractor for construction of external and internal rcc drain and box culvert at i.a. m.g. road (phase-i,ii and iii) distt. hapur (aiim 3) on epc basis
Selection of contractor for construction of external and internal rcc drain and box culvert at i.a. m.g. road (phase-i,ii and iii) distt. hapur (aiim 3) on epc basis
Read moreAmc for statcon make battery chargers installed for dc system of unit-i to iv, 400kv switchyard phase -i and ii, plcc of phase-i and ii and silo area phase-i, ctpp.
Amc for statcon make battery chargers installed for dc system of unit-i to iv, 400kv switchyard phase -i and ii, plcc of phase-i and ii and silo area phase-i, ctpp.
Read moreHire charges, fitting and fixing of 1 no. 1000 ltr. capacity pvc water tank over tata 107/207/mechanised van for supply of drinking water for bishpur gp hingalganj block under hasnabad sub-divn. p.h.e. dte. (phase-i)
Hire charges, fitting and fixing of 1 no. 1000 ltr. capacity pvc water tank over tata 107/207/mechanised van for supply of drinking water to for &#x0d bishpur gp, hingalganj block, under hasnabad sub-divn. p.h.e. dte. (phase-i)
Read more29163547 - overhauling kit for dead engine of ercp for kbil make electric ccb system of 3 phase locomotives
For complete deion and other details, please refer to tender
Read moreBull gear 107 teeth for wag9 loco as per rdso drg. no. skdp-3848 alt-1 or latest and rdso spec. no. mp.0.2800.19 (rev. 00) oct. 2005 or latest
For complete deion and other details, please refer to tender
Read moreIndependent engineer services for construction of strr (west side) nh948a obalapura (nelamangala taluk)) to kunigal (ramanagara taluk) from km 0 to km 79 (design chainage) phase-i in karnataka on ham (project length 79 kms)
Independent engineer services for construction of strr (west side) nh948a obalapura (nelamangala taluk)) to kunigal (ramanagara taluk) from km 0 to km 79 (design chainage) phase-i in karnataka on ham (project length 79 kms)
Read moreof your Industry type