Tender Details
Particulars | Details |
---|---|
Title |
Ssi, Dgn And Constr Of Two Nos Maj Pmt Bdg Of Span 50 M Over Hmaranglui River At Km 98.100 And 45 M Over Chotta Golsuri River At Km 140.875 On Rd L D P Incl Both Side Approach Road For All Two B Rs Under 71 Rcc/24 Tf Under (P) Psk In Mizoram (2nd Call)
|
Description |
Ssi, Dgn And Constr Of Two Nos Maj Pmt Bdg Of Span 50 M Over Hmaranglui River At Km 98.100 And 45 M Over Chotta Golsuri River At Km 140.875 On Rd L D P Incl Both Side Approach Road For All Two B Rs Under 71 Rcc/24 Tf Under (P) Psk In Mizoram (2nd Call)
|
Organisation | Dte General Border Roads Organisation | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 8.51 Lakh |
Tender Value | |
Place | Km 98.100 AND 140.875 ON LDP ROAD |
Link |
AAAAAAAAAA Login to view |
Start Date | June 11, 2025 15:30 |
End Date |
19/06/2025 ( 19 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ssi, dgn and constr of two nos maj pmt bdg of span 50m over hmaranglui river at km 98.100 and 45 m over chotta golsuri river at km 140.875 on rd l-d-p incl both side approach road for all two brs under 71 rcc/24 tf under (p) psk in mizoram (2nd call)
Ssi, dgn and constr of two nos maj pmt bdg of span 50m over hmaranglui river at km 98.100 and 45 m over chotta golsuri river at km 140.875 on rd l-d-p incl both side approach road for all two brs under 71 rcc/24 tf under (p) psk in mizoram (2nd call)
Read moreDesign and constr of 35 m span psc maj pmt br with open foundation over thangeni nallah incl proof check and ssi report at km 72 pt 550 on sktt rd under 94 rcc 38 brtf rd of project deepak in hp state
Design and constr of 35 m span psc maj pmt br with open foundation over thangeni nallah incl proof check and ssi report at km 72 pt 550 on sktt rd under 94 rcc 38 brtf rd of project deepak in hp state
Read moreSsi, dgn and constr of two nos maj pmt bdg of span 50m over hmaranglui river at km 98.100 and 45 m over chotta golsuri river at km 140.875 on rd l-d-p incl both side approach road for all two brs under 71 rcc/24 tf under pro psk in mizoram
Ssi, dgn and constr of two nos maj pmt bdg of span 50m over hmaranglui river at km 98.100 and 45 m over chotta golsuri river at km 140.875 on rd l-d-p incl both side approach road for all two brs under 71 rcc/24 tf under pro psk in mizoram
Read moreConstr of 04 nos maj pmt br steel super 45 m span at km 52.425 over galo nallah, 45 m span at km 57.425 over kogi nallah,35 m span at km 60.80 and 35 m span at km 63.30 over kojup nallah on rd t-n under 77 rcc of 23 tf/(p) arunank in a.p epc mode
Constr of 04 nos maj pmt br steel super 45 m span at km 52.425 over galo nallah, 45 m span at km 57.425 over kogi nallah,35 m span at km 60.80 and 35 m span at km 63.30 over kojup nallah on rd t-n under 77 rcc of 23 tf/(p) arunank in a.p epc mode.
Read moreSsi design and const of 90.00 m span maj pmt steel super structure bridge on well fdn over khankha river at km 1.90 incl ssi on rd sanklang toong rd under 107 rcc 758 brtf project swastik in the state of sikkim job no 314 201 tender no ce p swtk 29
Ssi design and const of 90.00 m span maj pmt steel super structure bridge on well fdn over khankha river at km 1.90 incl ssi on rd sanklang toong rd under 107 rcc 758 brtf project swastik in the state of sikkim job no 314 201 tender no ce p swtk 29
Read moreDesign and construction of 35 mtr span maj pmt bridge lingdong bridge psc box girder type superstructure on open foundation including ssi and approaches over ribim chu nallah at km 19.75 on dikchu sanklang road under 107 rcc/758tf (p) swastik in si
Design and construction of 35 mtr span maj pmt bridge lingdong bridge psc box girder type superstructure on open foundation including ssi and approaches over ribim chu nallah at km 19.75 on dikchu sanklang road under 107 rcc/758tf (p) swastik in si
Read moreDesign and construction of 35 mtr span maj pmt bridge lingdong bridge psc box girder type superstructure on open foundation including ssi and approaches over ribim chu nallah at km 19.75 on dikchu sanklang road under 107 rcc/758tf (p) swastik in si
Design and construction of 35 mtr span maj pmt bridge lingdong bridge psc box girder type superstructure on open foundation including ssi and approaches over ribim chu nallah at km 19.75 on dikchu sanklang road under 107 rcc/758tf (p) swastik in si
Read moreSsi, dgn and constr of two nos maj pmt bdg of span 50 m over hmaranglui river at km 98.100 and 45 m over chotta golsuri river at km 140.875 on rd l-d-p incl both side approach road for all two brs under 71 rcc/24 tf under pro psk in mizoram(2nd call)
Ssi, dgn and constr of two nos maj pmt bdg of span 50 m over hmaranglui river at km 98.100 and 45 m over chotta golsuri river at km 140.875 on rd l-d-p incl both side approach road for all two brs under 71 rcc/24 tf under pro psk in mizoram(2nd call)
Read moreSsi, dgn and constr of two nos maj pmt bdg of span 50 m over hmaranglui river at km 98.100 and 45 m over chotta golsuri river at km 140.875 on rd l-d-p incl both side approach road for all two brs under 71 rcc/ 24 tf under project pushpak in mizoram
Ssi, dgn and constr of two nos maj pmt bdg of span 50 m over hmaranglui river at km 98.100 and 45 m over chotta golsuri river at km 140.875 on rd l-d-p incl both side approach road for all two brs under 71 rcc/ 24 tf under project pushpak in mizoram
Read moreSs investigation design drawing const of 03 maj pmt br steel superstructure alongwith both approach roads in respect of 45 mtr span at km 23.450, 60 mtr span at km 30.425 and 75 mtr span at km 36.600 on rd n-tcc under 128rcc of 23 tf p ank in a.p
Ss investigation design drawing const of 03 maj pmt br steel superstructure alongwith both approach roads in respect of 45 mtr span at km 23.450, 60 mtr span at km 30.425 and 75 mtr span at km 36.600 on rd n-tcc under 128rcc of 23 tf p ank in a.p
Read moreof your Industry type