Tender Details

Particulars Details
Title
Integrated Automatic Velocity Meter Along With Accessories For Existing Flood Early Warning With Ac
Description
Organisation Hydro Power | Ministry of Power
Tender Id GEM/2023/B/3577623
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://gem.gov.in/

Start Date June 16, 2023 17:50
End Date
Expired 26/06/2023

Expired 1203 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Awarded Contractor / Winner

AIMIL LIMITED

Contract Value

1144786

Tender Status: active
Buyer Name: Rahul Kumar Verma
Ministry: Ministry Of Power
Department: Hydro Power
Organisation: Kiru Hep Cvpppl

Technical Evaluation Results

S.No. Seller Name Offered Item Participated On EMD Status MSE/MII Status Status
1 AIMIL LIMITED - 23-06-2023 17:18:26 Offline upload MII Qualified
2 M/S R.K. ENGINEERING CORPRATION - 23-06-2023 12:43:27 KVIC MII N/A Disqualified

Financial Evaluation Results

S.No. Seller Name Offered Item Total Price Rank
1 AIMIL LIMITED(MII) Item Categories : Integrated Automatic Velocity Meter along with accessories for existing flood early warning with ac 1144786.00 L1

Ordered Items & Contract Pricing

Product Brand Model Ordered Quantity Price
Integrated Automatic Velocity Meter along with accessories for existing flood early warning with accessories as per attached specifications NA BOQ Item 1 ₹ 639560.000
Siren for DAM as per attached specifications NA BOQ Item 1 ₹ 304626.000
Accessories solar panel as per attached specifications NA BOQ Item 2 ₹ 129800.000
Installation NA BOQ Item 1 ₹ 70800.000
Similar Tenders
Establishment of automatic water level recorder (awlr)/ velocity sensor for early warning system at upstream gnd sites for tld-iii ps reservoir

Establishment of automatic water level recorder (awlr)/ velocity sensor for early warning system at upstream gnd sites for tld-iii ps reservoir

Read more
Establishment of automatic water level recorder (awlr)/ velocity sensor for early warning system at upstream gnd sites for tld-iii ps reservoir

Establishment of automatic water level recorder (awlr)/ velocity sensor for early warning system at upstream gnd sites for tld-iii ps reservoir

Read more
Supply, installation and amc of automatic water level recorder(awlr) and velocity sensor for early warning system (aws) for gauge and flow meter site at jiwa,hurla,manihar,pancha and jigrai nallah along with trc of phep-ii,pkg.no-c-765

Supply, installation and amc of automatic water level recorder(awlr) and velocity sensor for early warning system (aws) for gauge and flow meter site at jiwa,hurla,manihar,pancha and jigrai nallah along with trc of phep-ii,pkg.no-c-765

Read more
Supply installation, testing and commissioning of flood early warning system at dam for 900 mw baglihar hep

Supply installation, testing and commissioning of flood early warning system at dam for 900 mw baglihar hep

Read more
Implementation of early flood warning system (efws) in vishnugad pipalkoti hydro electric project (4 x 111 mw)

Implementation of early&#x0d flood warning system (efws) in vishnugad pipalkoti hydro electric project (4 x 111 mw)&#x0d

Read more
Supply installation testing commissioning of early flood warning system (efws) for larji hydro electric project 126 mw

Supply installation testing commissioning of early flood warning system (efws) for larji hydro electric project 126 mw

Read more
Establishment of flood early warning system, control and command centre including design, supply, installation and commissioning (fully integrated system, comprising of gis based rainfall, storm water modeling, flood visualization simulation data ac

Establishment of flood early warning system, control and command centre including design, supply, installation and commissioning (fully integrated system, comprising of gis based rainfall, storm water modeling, flood visualization simulation data ac

Read more
Establishment of flood early warning system control and command centre including design supply installation and commissioning fully integrated system comprising of gis based rainfall storm water modeling flood visualization simulation data ac

Establishment of flood early warning system control and command centre including design supply installation and commissioning fully integrated system comprising of gis based rainfall storm water modeling flood visualization simulation data ac

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise