| Particulars | Details |
|---|---|
| Title |
Integrated Automatic Velocity Meter Along With Accessories For Existing Flood Early Warning With Ac
|
| Description |
|
| Organisation | Hydro Power | Ministry of Power |
| Tender Id | GEM/2023/B/3577623 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | June 16, 2023 17:50 |
| End Date |
Expired
26/06/2023
Expired 1203 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
AIMIL LIMITED
1144786
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | EMD Status | MSE/MII Status | Status |
|---|---|---|---|---|---|---|
| 1 | AIMIL LIMITED | - | 23-06-2023 17:18:26 | Offline upload | MII | Qualified |
| 2 | M/S R.K. ENGINEERING CORPRATION | - | 23-06-2023 12:43:27 | KVIC | MII N/A | Disqualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | AIMIL LIMITED(MII) | Item Categories : Integrated Automatic Velocity Meter along with accessories for existing flood early warning with ac | 1144786.00 | L1 |
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| Integrated Automatic Velocity Meter along with accessories for existing flood early warning with accessories as per attached specifications | NA | BOQ Item | 1 | ₹ 639560.000 |
| Siren for DAM as per attached specifications | NA | BOQ Item | 1 | ₹ 304626.000 |
| Accessories solar panel as per attached specifications | NA | BOQ Item | 2 | ₹ 129800.000 |
| Installation | NA | BOQ Item | 1 | ₹ 70800.000 |
Supply and installation of velocity sensors for early warning system installed at kamutal village
Read more
Establishment of automatic water level recorder (awlr)/ velocity sensor for early warning system at upstream gnd sites for tld-iii ps reservoir
Establishment of automatic water level recorder (awlr)/ velocity sensor for early warning system at upstream gnd sites for tld-iii ps reservoir
Read moreEstablishment of automatic water level recorder (awlr)/ velocity sensor for early warning system at upstream gnd sites for tld-iii ps reservoir
Establishment of automatic water level recorder (awlr)/ velocity sensor for early warning system at upstream gnd sites for tld-iii ps reservoir
Read moreSupply, installation and amc of automatic water level recorder(awlr) and velocity sensor for early warning system (aws) for gauge and flow meter site at jiwa,hurla,manihar,pancha and jigrai nallah along with trc of phep-ii,pkg.no-c-765
Supply, installation and amc of automatic water level recorder(awlr) and velocity sensor for early warning system (aws) for gauge and flow meter site at jiwa,hurla,manihar,pancha and jigrai nallah along with trc of phep-ii,pkg.no-c-765
Read moreSupply installation, testing and commissioning of flood early warning system at dam for 900 mw baglihar hep
Supply installation, testing and commissioning of flood early warning system at dam for 900 mw baglihar hep
Read moreImplementation of early flood warning system (efws) in vishnugad pipalkoti hydro electric project (4 x 111 mw)
Implementation of early
 flood warning system (efws) in vishnugad pipalkoti hydro electric project (4 x 111 mw)
Read moreSupply installation testing commissioning of early flood warning system (efws) for larji hydro electric project 126 mw
Supply installation testing commissioning of early flood warning system (efws) for larji hydro electric project 126 mw
Read moreEstablishment of flood early warning system, control and command centre including design, supply, installation and commissioning (fully integrated system, comprising of gis based rainfall, storm water modeling, flood visualization simulation data ac
Establishment of flood early warning system, control and command centre including design, supply, installation and commissioning (fully integrated system, comprising of gis based rainfall, storm water modeling, flood visualization simulation data ac
Read moreEstablishment of flood early warning system control and command centre including design supply installation and commissioning fully integrated system comprising of gis based rainfall storm water modeling flood visualization simulation data ac
Establishment of flood early warning system control and command centre including design supply installation and commissioning fully integrated system comprising of gis based rainfall storm water modeling flood visualization simulation data ac
Read moreof your Industry type