Tender Details
Particulars | Details |
---|---|
Title |
Removing Poster, Exterior Painting Of Wall From Shriram College To Hindu College , University Of Delhi
|
Description |
Removing Poster, Exterior Painting Of Wall From Shriram College To Hindu College , University Of Delhi
|
Organisation | Delhi University | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 500 |
EMD | 4129 |
Tender Value | |
Place | North Campus |
Link |
AAAAAAAAAA Login to view |
Start Date | November 29, 2024 23:30 |
End Date |
16/12/2024 ( 8 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Synthetic enamel exterior finishing brillient green shade isc:221 specification as per is:8662/2004 (second rev.) and for pigment content as an additional requirement of icf/md/spec.:- 045 (rev.03) in drum of 20 ltrs
For complete deion and other details, please refer to tender
Read moreSupply of epoxy cum polyurethane painting system (two pack) for the exterior painting.
For complete deion and other details, please refer to tender
Read moreRe-sectioning from km 0.00 to km 0.500, strengthening from km 0.00 to km 8.20 and km 15.00 to km 15.50 and widening and strengthening from km 8.20 to km 15.00 of nh-327 -old nh-31c- in the district of darjeeling, job no.554.
Re-sectioning from km 0.00 to km 0.500, strengthening from km 0.00 to km 8.20 and km 15.00 to km 15.50 and widening and strengthening from km 8.20 to km 15.00 of nh-327 -old nh-31c- in the district of darjeeling, job no.554.
Read moreConstruction work of 4-laning of sandalpur to nasrullaganj bypass end pkgi of nh-146b from design km 0.000 to design km 43.250 (dl 43.250 km) under nh(o) in madhya pradesh on hybrid annuity mode
Construction work of 4-laning of sandalpur to nasrullaganj bypass end pkgi of nh-146b from design km 0.000 to design km 43.250 (dl 43.250 km) under nh(o) in madhya pradesh on hybrid annuity mode
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreWidening to 4 lane of nh-20 (old nh-75e) from km 16.400 to km 47.700 (tupudana to kundibartoli) in the state of jharkhand (total length 31.300 km) on hybrid annuity mode.
Widening to 4 lane of nh-20 (old nh-75e) from km 16.400 (design chainage) to km
 47.700 (design chainage(tupudana to
 kundibartoli) in the state of jharkhand
 (total length 31.300 km) on hybrid annuity
 mode.
Read moreDevelop. of 4laning of gudebellur ch.182.930 to junc with nh 167n bhootpur chincholi road near palamuru university ch.262.940 in hyderabad panaji sec of nh167 l80.01km under nh(o) in telangana on ham mode
Develop. of 4laning of gudebellur ch.182.930 to junc with nh 167n bhootpur chincholi road near palamuru university ch.262.940 in hyderabad panaji sec of nh167 l80.01km under nh(o) in telangana on ham mode
Read moreProviding speed calming measures in kallar elephant corridor from km 56/000 to km 58/400 of nh-181 ( coimbatore -ooty -gundalpet road ) under ap-2024-25 in the state of tamil nadu
Providing speed calming measures in kallar elephant corridor from km 56/000 to km 58/400 of nh-181 ( coimbatore -ooty -gundalpet road ) under ap-2024-25 in the state of tamil nadu
Read moreDevelop. of 4lane ac sirhind sehna sec of nh205ag from dak expressway ne5 near malerkotla ch79.200 to junc with lb highway nh754 ad near vill sehna ch.134.290 tl 55.09 km pkgii part of mohali barnala ic in punjab under nh(o) on ham
Develop. of 4lane ac sirhind sehna sec of nh205ag from dak expressway ne5 near malerkotla ch79.200 to junc with lb highway nh754 ad near vill sehna ch.134.290 tl 55.09 km pkgii part of mohali barnala ic in punjab under nh(o) on ham
Read moreDevelop of 4lane ac sirhind sehna sec of nh205ag delhi amritsar highway nh44 near vill sirhind ch.27.370 to junc with dak expressway ne5 near malerkotla ch.79.200 total l51.83 km pkgi as a part of mohali barnala ic in punjab under nh o on ham
Develop of 4lane ac sirhind sehna sec of nh205ag delhi amritsar highway nh44 near vill sirhind ch.27.370 to junc with dak expressway ne5 near malerkotla ch.79.200 total l51.83 km pkgi as a part of mohali barnala ic in punjab under nh o on ham
Read moreof your Industry type