Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Coupling Bolts For 125 Mw Generator And Lp Turbine Rotor
|
| Description |
|
| Organisation | Materials Management | Ministry of Coal |
| Tender Id | GEM/2023/B/3971957 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | September 16, 2023 21:20 |
| End Date |
Expired
19/10/2023
Expired 1090 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
BHARAT HEAVY ELECTRICALS LIMITED
2390000
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | BHARAT HEAVY ELECTRICALS LIMITED | Make : Bharata Heavy Electricals Limited Model : coupling Bolt Title : coupling Bolt | 16-10-2023 17:27:31 | MII | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | BHARAT HEAVY ELECTRICALS LIMITED(MII) | Item Categories : Coupling bolts for 125MW Generator and LP turbine rotor | 2390257.00 | L1 |
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| coupling Bolt | Bharata Heavy Electricals Limited | coupling Bolt | 1 | ₹ 2390000.000 |
Supply of double part endless wire rope sling as per specification attached,supply of sling with both end reeving, 6 x 37 fibre core construction as per specification attached,hp turbine turn buckle of min. 10 tonnes swl with both ends fork for turbine hp rotor as per specf,lp turbine turn buckle of min. 40 tonnes swl with both ends fork for turbine lp rotor as per specf
Supply of double part endless wire rope sling as per specification attached,supply of sling with both end reeving, 6 x 37 fibre core construction as per specification attached,hp turbine turn buckle of min. 10 tonnes swl with both ends fork for turbine hp rotor as per specf,lp turbine turn buckle of min. 40 tonnes swl with both ends fork for turbine lp rotor as per specf
Read moreLp(p) -2715: incremental encoder,spring steel coupling
Lp(p) -2715: incremental encoder,spring steel coupling
Read moreAssembly of gas turbine rotor with the supply of consumables make
Assembly of gas turbine rotor with the supply of consumables makesiemens model v94.2 at ntpc dadri
Read moreWork of re-insulation of generator rotor coils, damper segment of generator rotor unit no. 4, packing, transportation from sgtps ph-ii to firm workshop n vice versa, work of generator rotor repairing for the rectification of rotor earth of 210, sgtps
Work of re-insulation of generator rotor coils, damper segment of generator rotor unit no. 4, packing, transportation from sgtps ph-ii to firm workshop n vice versa, work of generator rotor repairing for the rectification of rotor earth of 210, sgtps
Read moreReconditioning refurbishment of rotor blade row1 of 13 d2 gas turbine of
Reconditioning refurbishment of rotor blade row1 of 13 d2 gas turbine ofntpc anta
Read morePump sludge screw,stator pump,rotor pump,coupling joint kit,coupling rod,gasket pump,gland packing pump
Pump sludge screw,stator pump,rotor pump,coupling joint kit,coupling rod,gasket pump,gland packing pump
Read moreProcurement of hip turbine rotor with complete blade assembly with extension shaft for main turbine of unit5and6, 2x660 mw units of csctpp, chhabra
Procurement of hip turbine rotor with complete blade assembly with extension shaft for main turbine of unit5and6, 2x660 mw units of csctpp, chhabra
Read moreSupply of lp turbine lead diaphragms for unit-3,4 of tm division/stage-ii/btps
Supply of lp turbine lead diaphragms for unit-3,4 of tm division/stage-ii/btps
Read moreDesign and development of technology demonstrator of 25kw part electric gas turbine generator
Design and development of technology demonstrator of 25kw part electric gas turbine generator
Read moreof your Industry type