Tender Details

Particulars Details
Title
Pipeline Installation By Hdd Method For Kcpl Ph Ii Of Gail
Description
Pipeline Installation By Hdd Method Across Seven Nos Crossings For Phase Ii Project Of M/S Gail
Organisation Central Public Procurement Portal 2
Tender Id 2023_GAIL_163041_1
Reference
Number
SM/B411-000-MK-T-9570/1009
Tender Fee 0
EMD 39.5 Lakh
Tender Value -
Place VC (Webex Meeting)
Link
View Original Tender Notice

https://etenders.gov.in

Start Date August 10, 2023 20:30
End Date
Expired 30/08/2023

Expired 1094 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Installation of a pipeline for water drainage from rajput mohalla community center towards chougan johad sarayan.

Installation of a pipeline for water drainage from rajput mohalla community center towards chougan johad sarayan.

Read more
Experienced manufacturers/eligible bidders for supplying, fabrication and installation of 26 (nos.) of monogram acrylic selfie points with 3d letters and artistic design displaying the message "i love sitamarhi municipal corporation-sitamarhi" at locations specified by sitamarhi nagar nigam.

Experienced manufacturers/eligible bidders for supplying, fabrication and installation of 26 (nos.) of monogram acrylic selfie points with 3d letters and artistic design displaying the message "i love sitamarhi municipal corporation-sitamarhi" at locations specified by sitamarhi nagar nigam.

Read more
Construction of 20 nos. 125mm x 45 mtr. gravel packed tubewell & 10 no. 125/115 mm dia 60 mtr deep drilled tubewell for sinking of i.m.-ii handpump with platform, drain & soakpit due to drought condition and falling water level in water scarce area of district nawada under p.h. division, nawada by natural disaster (apada) head for the year 2026-27..

Construction of 20 nos. 125mm x 45 mtr. gravel packed tubewell & 10 no. 125/115 mm dia 60 mtr deep drilled tubewell for sinking of i.m.-ii handpump with platform, drain & soakpit due to drought condition and falling water level in water scarce area of district nawada under p.h. division, nawada by natural disaster (apada) head for the year 2026-27..

Read more
Resurvey of hirebandady bit i & ii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 25.00 km in puttur range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.

Resurvey of hirebandady bit i & ii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 25.00 km in puttur range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.

Read more
Resurvey of kodiyadibeliyuru block bit i & ii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 09.00 km in puttur range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.

Resurvey of kodiyadibeliyuru block bit i & ii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 09.00 km in puttur range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.

Read more
Resurvey of balpa rf block bit i, ii & iii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 6.75 km in panja range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.

Resurvey of balpa rf block bit i, ii & iii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 6.75 km in panja range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.

Read more
Pipeline installation by hdd method

Pipeline installation by hdd method&#x0d across five nos. crossings for krishnagiri&#x0d coimbatore pipeline phase-i project of m/s gail

Read more
Pipeline installation by hdd method across 25 nos of crossings in salem comibatore section of kkbmpl ii project

Pipeline installation by hdd method across 25 nos of crossings in salem comibatore section of kkbmpl ii project

Read more
Composite work for carrying out mitigation measure at ch. 118.4 of dupl network by hdd method

Composite work for carrying out mitigation measure at ch. 118.4 of dupl network by hdd method

Read more
Laying of 8 inch steel gas pipeline by hdd method for crossing of brahmani river and associated works at rourkela ga cgd project of gail gas limited

Laying of 8 inch steel gas pipeline by hdd method for crossing of brahmani river and associated works at rourkela ga cgd project of gail gas limited

Read more
Click Here to Download Dockets