Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
M1060500206 Gas Chem Argon 99.999 Perc Gr 1 Is5760,Hydraulic Testing Of Cylinder,Cylinder Valve Rep
|
Description |
|
Organisation | NA | Ministry of Power |
Tender Id | GEM/2024/B/5587408 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | November 11, 2024 14:55 |
End Date |
22/11/2024 ( Expired 209 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Aoh kit ep contactor filter on/off. each consist of 7 items 8 nos. (1) cartridge body assly, aal part no. 2220007100/04 - 01 nos (2) rubber o ring valve housing, aal part no. 2220007100/06 - 02 nos (3) rubber o ring piston sm, aal part no. 2220007100/07 - 01 no (4) rubber o ring cylinder sm, aal part no. 2220007100/05 - 01 no. (5) rubber o ring air conn, aal part no. 2220007100/08 - 01 no. (6) seal piston sm, aal partno. 2220007100/09 - 01 no. (7) rubber cap, aal part no. 2220007100/10 - 0
For complete deion and other details, please refer to tender
Read moreSpl rep wks to bldg no b ts 24 of 11 sikhli and b lt from 1 to 13 and 22 total 14 at 19 sikhli spl rep of bldg b tp 19 2 9 gr baisakhi under ge 859 ews
Spl rep wks to bldg no b ts 24 of 11 sikhli and b lt from 1 to 13 and 22 total 14 at 19 sikhli spl rep of bldg b tp 19 2 9 gr baisakhi under ge 859 ews
Read moreSpare hydraulic cylinder as per item no. 1 of techncial specification,seal kit of hydraulic cylinde
Read more
Design engineering manufacturing supply installation testing and commissioning of 1 no spherical valve miv along with dismantlement for shanan power house
Design engineering manufacturing supply installation testing and commissioning of 1 no spherical valve miv along with dismantlement for shanan power house
Read moreCustom bid for services - refilling and testing of two 93 kgs hfc 227 ea gas cylinder for main dat
Read more
Corrigendum 1 for the work of hydraulic testing of fire extinguishers to postpone tod
Corrigendum 1 for the work of hydraulic testing of fire extinguishers to postpone tod
Read moreSupply of h.p. hydraulic cylinder for main control valve of tdbfps of 600mw
Supply of h.p. hydraulic cylinder for main control valve of tdbfps of 600mw
Read moreOutsourcing of services for nd testing and hydraulic pressure testing of air receiver tanks of hemm at rgocm-1 on rate contract basis
Outsourcing of services for nd testing and hydraulic pressure testing of air receiver tanks of hemm at rgocm-1 on rate contract basis
Read moreof your Industry type