Tender Details

Particulars Details
Title
Shifting Of Utility Line Of Dws Passing Along The Proposed Road From Shyamali Bazar Sainik Board To G.B Trauma Centre Left Side
Description
Estimate For Shifting Of Utility Under Dws Sub Division No Iii Kunjaban Agartala Of Dws Department For Road Widening By Pwd From Shyamali Bazar Sainik Board To Gb Trauma Centre During The Year 2024 25
Organisation Director (Urban Development Department) | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 1000
EMD 61783
Tender Value
Place Agartala
Link

AAAAAAAAAA

Login to view
Start Date June 06, 2025 23:30
End Date

26/06/2025 ( 19 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst

Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst

Read more
Shifting of utility line of dws passing along the proposed road from shyamali bazar sainik board to g.b trauma centre left side

Estimate for shifting of utility under dws sub division no iii kunjaban agartala of dws department for road widening by pwd from shyamali bazar sainik board to gb trauma centre during the year 2024 25

Read more
Macadamization of main link bagh islam krankshivan colony sopore from krankshivan culvert to fajar pre school including link road at jalalabad near army camp left side of bus stand by way of providing and laying 75 mm thick wet mix macadam,50 mm thic

Macadamization of main link bagh islam krankshivan colony sopore from krankshivan culvert to fajar pre school including link road at jalalabad near army camp left side of bus stand by way of providing and laying 75 mm thick wet mix macadam,50 mm thic

Read more
Construction of rcc culverts at sarada colony 14th and 15th lines and cc outfall drain to sarada colony main road from 13th line to 15th line (south side) in div no.50 under ae-6 section.

Construction of rcc culverts at sarada colony 14th and 15th lines and cc outfall drain to sarada colony main road from 13th line to 15th line (south side) in div no.50 under ae-6 section.

Read more
Construction of rcc culverts at sarada colony 13th and 19th lines and cc outfall drain to sarada colony main road from 13th line to 14th line (north side) in div no.50 under ae-6 section

Construction of rcc culverts at sarada colony 13th and 19th lines and cc outfall drain to sarada colony main road from 13th line to 14th line (north side) in div no.50 under ae-6 section

Read more
Upkeeping and beautification approach road area from shop no.owl-99 to owl-120 at line bazar of owl estate, ishapore through cpp portal

Upkeeping and beautification approach road area from shop no.owl-99 to owl-120 at line bazar of owl estate, ishapore through cpp portal

Read more
Construction of drain cc road and drain from har prasad house to vinod mill along the railway line in ward 45.

Construction of drain cc road and drain from har prasad house to vinod mill along the railway line in ward 45.

Read more
Repair of road from bera mokampara more to the house of nitish saha at bera uttarpara along with repair of drain by the side of road in ward no 14 under dainhat municipality

Repair of road from bera mokampara more to the house of nitish saha at bera uttarpara along with repair of drain by the side of road in ward no 14 under dainhat municipality

Read more
Urgent mtc. on road from tulabari health sub-centre to chaimarua bazar under killa sub-division pwd(rnb) during the year 2025-26./ s.h. construction of toe wall by cc block pitching, filling, brick soling and allied work etc. (gr-i)

Urgent mtc. on road from tulabari health sub-centre to chaimarua bazar under killa sub-division pwd(rnb) during the year 2025-26./ s.h. construction of toe wall by cc block pitching, filling, brick soling and allied work etc. (gr-i)

Read more
Construction of paved path and laying of water supply line from arnehar road back side of a-18 building to lp-02 hostel block at north campus of iit mandi

Construction of paved path and laying of water supply line from arnehar road back side of a-18 building to lp-02 hostel block at north campus of iit mandi

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise