Survey, Soil Investigation, Design, Supply, Laying, Construction And Commissioning Of Stp Of 80 Mld Dhankhedhi And Sewer Line Of 163 Km And 1 No. Mps Of 80 Mld And Pumping Main Including House Service Connection As Per Scope Of Work With 10 Years
|
Description |
Survey, Soil Investigation, Design, Supply, Laying, Construction And Commissioning Of Stp Of 80 Mld Dhankhedhi And Sewer Line Of 163 Km And 1 No. Mps Of 80 Mld And Pumping Main Including House Service Connection As Per Scope Of Work With 10 Years
|
Organisation | Directorate Urban Administration and Development | State Govt. and UT |
Tender Id | 2024_UAD_383330_1 |
Reference Number |
61/EE/STP/24-25/E-TENDER-G-1 |
Tender Fee | 51180 |
EMD | 1.5 Crore |
Tender Value | |
Place | INDORE |
Link | https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=457688 |
Start Date | December 17, 2024 17:45 |
End Date |
14/01/2025 ( Expired 96 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Investigation and survey on gis basis of the project area including soil investigation engineering design hydraulic and structural as required procurement of all labour and material t and p etc and construction of various components complete
Construction of 0.6 mld stp pumping station conveyance system and other associated sewerage works and drain works in patelpuram gaytri shaktipeeth, gomti nagar vistar sector1 district lucknow up india
Read moreStrengthening of sewerage (providing and laying of rising main sewer line for various sps (28, 18, 15a, 16, 31) to stp-54 and sps-10/33), noida.
Strengthening of sewerage (providing and laying of rising main sewer line for various sps (28, 18, 15a, 16, 31) to stp-54 and sps-10/33), noida.
Read moreSurvey design fabrication supply installation testing and commissioning of total 10 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract (cmc) for 05 years
Survey design fabrication supply installation testing and commissioning of total 10 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract (cmc) for 05 years
Read moreSurvey design fabrication supply installation testing and commissioning of total 10 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract (cmc) for 05 years
Survey design fabrication supply installation testing and commissioning of total 10 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract (cmc) for 05 years
Read moreInvestigation, survey (on g.i.s. vasis) and construction of 10 mld stp with 30 kld c0-treatment, i and d of drains and structure, rising main, treated effluent line with scada etc. in auraiya nagar palika parishad, district auraiya under s.b.m. 2.0
Investigation, survey (on g.i.s. vasis) and construction of 10 mld stp with 30 kld c0-treatment, i and d of drains and structure, rising main, treated effluent line with scada etc. in auraiya nagar palika parishad, district auraiya under s.b.m. 2.0
Read moreSurvey and design of laying of sewer network including providing laying testing and commissioning and different area of ward no. 41 file no. 101/24x9/1
Survey and design of laying of sewer network including providing laying testing and commissioning and different area of ward no. 41 file no. 101/24x9/1
Read moreProviding and laying of 300mm dia sewer line from aksham hospital to punjab national bank sector-7a market and from h.no-175 to sector-7-10 chowk (main sewer line) sector -7a of ward no-34 old faridabad
Providing and laying of 300mm dia sewer line from aksham hospital to punjab national bank sector-7a market and from h.no-175 to sector-7-10 chowk (main sewer line) sector -7a of ward no-34 old faridabad
Read moreLaying new water supply line from borewells near welfare building, main gate two wheeler parking and guest house to pump house and supply and commissioning of pump near main gate parking inside cmti
Laying new water supply line from borewells near welfare building, main gate two wheeler parking and guest house to pump house and supply and commissioning of pump near main gate parking inside cmti
Read moreLaying and interconnection of 300 mm dia 10 mtr, 03 mtr and 32 mtr sewer line at house no b 48 part 1, in front of aman enclave a block a 1 part and a1 khali plot phase-3 shatabdi nagar at ward no 50
Laying and interconnection of 300 mm dia 10 mtr, 03 mtr and 32 mtr sewer line at house no b 48 part 1, in front of aman enclave a block a 1 part and a1 khali plot phase-3 shatabdi nagar at ward no 50
Read moreAugmentation of water supply to bhawanipatna municipality including o and m for 5 years under amrut 2.0 swap-iii
Construction of rcc intake well, pump house and pumping arrangements, 20 mld wtp with all ancillary works, laying of rwrm and cwrm, construction of rcc esr, boundary wall, approach road and internal and external electrification, etc.