Tender Details
Particulars | Details |
---|---|
Title |
Cleaning And Desilting Of Storm Water Drain In Ward No. 35 Div 3 B Under Mcg.
|
Description |
Cleaning And Desilting Of Storm Water Drain In Ward No. 35 Div 3 B Under Mcg.
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 2180 |
EMD | 42880 |
Tender Value | |
Place | Gurugram |
Link |
AAAAAAAAAA Login to view |
Start Date | June 06, 2025 14:30 |
End Date |
13/06/2025 ( 1 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreLandslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreConstruction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278
Construction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278
Read moreRe-bidding strengthning and improvement of roads under world bank aided project tresp in rupaichari block under sabroom division, pwd (r and b). gr-i
Re-bidding strengthning and improvement of roads under world bank aided project tresp in rupaichari block under sabroom division, pwd (r and b). gr-i
Read moreFor surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 400 kv sarni-seoni line and 400 kv sarni-indirasagar line under tlm sub dn. sarni under ee eht (maint.) dn.itarsi
For surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 400 kv sarni-seoni line and 400 kv sarni-indirasagar line under tlm sub dn. sarni under ee eht (maint.) dn.itarsi
Read moreSurface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 132 kv harda-seoni malwa and 132 kv itarsi-seoni malwa line under tlm sub dn. harda under ee (eht-maint.) dn itarsi.
Surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 132 kv harda-seoni malwa and 132 kv itarsi-seoni malwa line under tlm sub dn. harda under ee (eht-maint.) dn itarsi.
Read moreBiennial contract for coal mill rejection and assistance in misc jobs of operation department including equipment cleaning for all units btps
Biennial contract for coal mill rejection and assistance in misc jobs of operation department including equipment cleaning for all units btps
Read moreRoad safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)
Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)
Read moreof your Industry type