Tender Details
Particulars | Details |
---|---|
Title |
Stud M12,Stud M14,Stud 1 M14,Stud M16,Stud 1 M16,Stud 2 M16,Stud M20,Stud 1 M20
|
Description |
|
Organisation | Department of Military Affairs | Ministry of Defence |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | April 10, 2025 19:59 |
End Date |
01/05/2025 ( 11 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Well hd x 4cp 15m, 20 in x13.3/8" x9.5/8* (edp-165103003),x-mas tree 2-9/16" x 2-1/16" -15m (edp-16
Read more
Hiring of model- 25/latest model of 1 no. omni bus/traveler (t-2), 25-1 seating capacity or equivalent sel vehicle for utilization period of bus up to 03 years or 2,50,000 kms for ae(tlm) sub dn., mpptcl, satna
Hiring of model- 25/latest model of 1 no. omni bus/traveler (t-2), 25-1 seating capacity or equivalent sel vehicle for utilization period of bus up to 03 years or 2,50,000 kms for ae(tlm) sub dn., mpptcl, satna
Read moreShort term maintenance contracts from km 0/0-1/6, km1/6-2/6, km 4/6-6/6, km 11/6-12/6 of nh 381a vellakovil - sankagiri road in the state of tamil nadu for the year 2024-25
Short term maintenance contracts from km 0/0-1/6, km1/6-2/6, km 4/6-6/6, km 11/6-12/6 of nh 381a vellakovil - sankagiri road in the state of tamil nadu for the year 2024-25
Read moreBiennial maintenance of ash slurry line extension at different dp and dp changeover (both phase #1 and phase # 2) inside ash pond of sgtpp
Biennial maintenance of ash slurry line extension at different dp and dp changeover (both phase #1 and phase #2) inside ash pond of sgtpp.
Read moreMachinery spares 1,machinery spares 2,machinery spares 3,machinery spares 4,machinery spares 5,mach
Read more
Led light type 1,led light type 2,led light type 3,led light type 4,led light driver type 1,led lig
Read more
1. front wind shield glass (right side) 2. front wind shield glass (left side)
1. front wind shield glass (right side)&#x0d 2. front wind shield glass (left side)
Read moreProcurement of complete lp turbine rotor assembly with turbine blades for 2x600mw at unit no. 1 and 2 at sstpp, mppgcl, dongalia
Procurement of complete lp turbine rotor assembly with turbine blades for 2x600mw at unit no. 1 and 2 at sstpp, mppgcl, dongalia
Read moreof your Industry type