Tender Details

Particulars Details
Title
Fabrication And Erection Of Pipe Ag Api Four To Eight Inch,Supply Fabrication And Fixing Of Reducer
Description
Organisation Bharat Petroleum Corporation Ltd | Ministry of Petroleum and Natural Gas
Tender Id GEM/2023/B/3750020
Reference
Number
Tender Fee
EMD
Tender Value
Place
Link https://gem.gov.in/
Start Date July 27, 2023 22:35
End Date

11/08/2023 ( Expired 695 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Tender Result
Tender Status: Active
Additional Information: Average Turn Over of Last 3 Years: 50 Lakhs Experience with Gov. Required: Years
Buyer Details
Name: Krishna Gopal Singh
Address: 515401,ANDHRA PRADESH,India,Krishna Gopal Singh,09937-443795-,[email protected],Bharat petroleum corporation limited Gooty POL Depot, Near Power Grid corportion limited. Old NH-7, Gooty-515401, Anantapuram Dist.(A.P.) Ph: 08552-200612(Direct), 200611,ANANTHAPUR
Ministry: Ministry Of Petroleum And Natural Gas
Department: Bharat Petroleum Corporation Ltd
Organisation: Bharat Petroleum Corporation Ltd
Office Address: Gooty
Similar Tenders
Repairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)

Repairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)

Read more
Design, manufacturing, supply, erection and commissioning of cnc die grinding machine (dia 500mm to 1000mm)

Design, manufacturing, supply, erection and commissioning of cnc die grinding machine (dia 500mm to 1000mm) alongwith all mandatory spares and accessories

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Read more
Construction of various 220 kv transmission lines associated with 220kv gss bambloo (dist-bikaner) including survey, supply of all equipments/materials, erection (including civil works), testing and commissioning (turnkey project) bn9019002517

Construction of various 220 kv transmission lines associated with 220kv gss bambloo (dist-bikaner) including survey, supply of all equipments/materials, erection (including civil works), testing and commissioning (turnkey project) bn9019002517

Read more
Rehabilitation and upgradation of armori to gadchiroli section of nh 353c from km 77-900 to 114-800 to four lane standards in the state of maharashtra on ham mode (length -36.900 km).

Rehabilitation and upgradation of armori to gadchiroli section of nh 353c from km 77-900 to 114-800 to four lane standards in the state of maharashtra on ham mode (length -36.900 km).

Read more
Empanelment of electrical contractors for a period of two years for supply of material erection testing commissioning of augmentation of existing 33 kv sub stations and lines construction of new 33 kv lines augmentation of existing 33 kv lines and

Empanelment of electrical contractors for a period of two years for supply of material erection testing commissioning of augmentation of existing 33 kv substations and lines construction of new 33 kv lines augmentation of existing 33 kv lines

Read more
Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450

Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450

Read more
Supply, fabrication, assembly and installation of stainless steel equipments in laundry area at wmp, frfcf

Supply, fabrication, assembly and installation of stainless steel equipments in laundry area at wmp, frfcf

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise