Tender Details

Particulars Details
Title
Construction Of 04 Four No Community Leach Pit At Beliakala Under Chiltore Gp Out Of Sbm Fund For The Year 2023 24
Description
Construction Of 04 Four No Community Leach Pit At Beliakala Under Chiltore Gp Out Of Sbm Fund For The Year 2023 24
Organisation Government of West Bengal
Tender Id 2023_ZPHD_562450_1
Reference
Number
08/CHILTORE GP/2023-24
Tender Fee 750
EMD 2789
Tender Value
Place CHILTORE GP
Link
View Original Tender Notice

https://wbtenders.gov.in

Start Date September 01, 2023 23:30
End Date
Expired 08/09/2023

Expired 1025 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders

The proposed construction of briefing room and pathway shed infront of c1, c2, c3 building at nowdapara phe (eastern block) for accommoding 2 coy of cisf personnel under kolkata north division, p.w.dte. during the year 2025-26

Read more
Engagement of user fee agency through eq on (8 nos/11 nos) fee plazas (07 no fee plazas in the state of haryana and 04 no fee plaza in the state of punjab) for project four-lane greenfield delhi-amritsar-katra expressway (ne-5) on ham

Engagement of user fee agency through eq on (8 nos/11 nos) fee plazas (07 no fee plazas in the state of haryana and 04 no fee plaza in the state of punjab) for project four-lane greenfield delhi-amritsar-katra expressway (ne-5) on ham

Read more
Special repair to jcos govt md accn bldg no p-685/01 to 04 at ajmer line under the area of age b/r-i of ge (army) no 1 jodhpur

Special repair to jcos govt md accn bldg no p-685/01 to 04 at ajmer line under the area of age b/r-i of ge (army) no 1 jodhpur

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Fabrication and repairing of 150 hp direct haulage for smooth and safe haulage operation at pit no. 09 in madhaipur colliery under pandaveswar area.

Fabrication and repairing of 150 hp direct haulage for smooth and safe haulage operation at pit no. 09 in madhaipur colliery under pandaveswar area.

Read more
Urgent repair works 1.00 kmp to 1.500 kmp in patches tengua-basulichak road under haldia construction sub-division no-i in the district of purba medinipur in the year 2026-2027. sl-03

Urgent repair works 1.00 kmp to 1.500 kmp in patches tengua-basulichak road under haldia construction sub-division no-i in the district of purba medinipur in the year 2026-2027.

Read more
Construction of rcc drain at km 140, km 183, km 204 and guard toe wall of at ch. 151.200 of nh-23 (new nh-143) under nh division, gumla for the year 2025-26.

Construction of rcc drain at km 140, km 183, km 204 and guard toe wall of at ch. 151.200 of nh-23 (new nh-143) under nh division, gumla for the year 2025-26.

Read more
Complete repairing/rewinding of 03 numbers of 10hp,550v,3phase,2900rpm submersible pump motors for ensuring smooth water supply to the residential quarters and boiler reservoir from riverside borehole, old 7 no. pit and water reservoir at madhaipur

Complete repairing/rewinding of 03 numbers of 10hp,550v,3phase,2900rpm submersible pump motors for ensuring smooth water supply to the residential quarters and boiler reservoir from riverside borehole, old 7 no. pit and water reservoir at madhaipur

Read more
Engagement of 02 nos. tractor mounted water tanker for supplying of water for construction purpose at hijukita rehab site (near school and masjid area) for the period of 320 days under rajmahal area.

Engagement of 02 nos. tractor mounted water tanker for supplying of water for construction purpose at hijukita rehab site (near school and masjid area) for the period of 320 days under rajmahal area.

Read more
Construction of 04 four no community leach pit at kotalsole under chiltore gp out of sbm fund for the year 2023-24

Construction of 04 four no community leach pit at kotalsole under chiltore gp out of sbm fund for the year 2023-24

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise