Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Sitc Of Crash Rated Bollard And Boom Barrier
|
| Description |
|
| Organisation | Airports Authority of India (AAI) | Ministry of Civil Aviation |
| Tender Id | GEM/2024/B/5533821 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | October 22, 2024 22:49 |
| End Date |
Expired
12/11/2024
Expired 698 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Beautification of tolichowki flyover by providing artistic painting to ceiling and crash barrier in ward no.131 - tolichowki, golconda circle-32 golconda zone ghmc
Beautification of tolichowki flyover by providing artistic painting to ceiling and crash barrier in ward no.131 - tolichowki, golconda circle-32 golconda zone ghmc
Read moreBeautification for shaikpet flyover by providing artistic painting to pillars and crash barrier in ward no.223 shaikpet, cir-32 golconda, golconda zone, ghmc
Beautification for shaikpet flyover by providing artistic painting to pillars and crash barrier in ward no.223 shaikpet, cir-32 golconda, golconda zone, ghmc
Read moreDevelopment of sports arena by providing balance works under shaikpet flyover and providing artistic painting to crash barrier, ward no. 223 shaikpet, circle-32, golconda, golconda zone, ghmc.
Development of sports arena by providing balance works under shaikpet flyover and providing artistic painting to crash barrier, ward no. 223 shaikpet, circle-32, golconda, golconda zone, ghmc.
Read moreHiring of 1 no. 0.50 to 0.75 cu.m long boom shovel with 20 meters boom length for removal of fire coal and repair of existing ground level 16000t capacity bunkers in ocp3 chp, rg2 for a period of 100 hrs or 30 days whichever is earlier.
Hiring of 1 no. 0.50 to 0.75 cu.m long boom shovel with 20 meters boom length for removal of fire coal and repair of existing ground level 16000t capacity bunkers in ocp3 chp, rg2 for a period of 100 hrs or 30 days whichever is earlier.
Read moreRepairing of walkways and platform of boom pulley assy. of 7820 dragline and fabrication and fitment of side collars of drag and hoist rope drum of 7820 dragline.
Repairing of walkways and platform of boom pulley assy. of 7820 dragline and fabrication and fitment of side collars of drag and hoist rope drum of 7820 dragline.
Read moreDismantling and buyback of existing lift and sitc of new 6 passenger lift for haritha hotel, indur inn, nizambad, telangana (2nd call)
Dismantling and buyback of existing lift and sitc of new 6 passenger lift for haritha hotel, indur inn, nizambad, telangana (2nd call)
Read moreSitc of ht panels, main lt panel, lt cable and wiring work in new substation for new rio building at igims, patna
Sitc of ht panels, main lt panel, lt cable and wiring work in new substation for new rio building at igims, patna
Read moreSitc of automatic pp glass bottle pre sterilization line post sterilization line and retort for flavoured milk in pp cum glass bottles at mega dairy raviryal
Sitc of automatic pp glass bottle pre sterilization line post sterilization line and retort for flavoured milk in pp cum glass bottles at mega dairy raviryal
Read moreSitc of transformer (750 kva), ht & lt panel and cable, apfc (capacitor) panel, wiring and shifting of existing 320 kva dg at new s/s beside the cm secretariat, along with operation & maintenance for five years in the campus of 4 no. deshratan marg (4 kga), patna, bihar
Sitc of transformer (750 kva), ht & lt panel and cable, apfc (capacitor) panel, wiring and shifting of existing 320 kva dg at new s/s beside the cm secretariat, along with operation & maintenance for five years in the campus of 4 no. deshratan marg (4 kga), patna, bihar
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreof your Industry type