Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
20/2025 26/Ce/Ee Ii/Bengaluru
|
| Description |
Construction Of Multi Storied Laboratory Building At Indian Institute Of Astrophysics (Iia), Koramangala, Bengaluru. Sh: Laboratory Building (Basement, Ground Floor And Five Upper Floors) Including Internal Water Supply, Sanitary Installations, Drainage, Internal And External Installations, Firefighting And Fire Alarm System, Cctv, Vrf Or Vrv Air Conditioning, Pressurized Mechanical Ventilation System, Ups, Lan And Epabx, Audio Video System, Solar Photovoltaic Power Generation, Lifts, Stp, Ug Sump And Pump House Etc And Development And Bulk Services.
|
| Organisation | Central Public Works Department (CPWD) | Central Govt. Ministry/Department |
| Tender Id | 123822 |
|
Reference Number |
2300010103-HB-07028 |
| Tender Fee | 0 |
| EMD | 75.45 Lakh |
| Tender Value | |
| Place | |
| Link |
View Original Tender Notice
https://etender.cpwd.gov.in/cppcpwdtenderview.html?tid=637077642463707764243132333832322432302f323032352d32362f43452f45452d49492f42656e67616c757275 |
| Start Date | August 20, 2025 19:12 |
| End Date |
Expired
15/09/2025
Expired 293 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
32/2025-26/ee-ii/bengaluru
Construction of buildings under 4th phase at national institute of unani medicine (nium) campus, bengaluru. sh: construction of ug/pg academic block with library, 200 bedded hostel, administrative building, guest house and examination hall including internal water supply and sanitary installations drainage, internal electrical installations, firefighting and fire alarm system, cctv, vrf/vrv air conditioning, ups, lan lifts etc and development and bulk services sh: providing ghar advisory and documentation services.
Read moreSetting up work stations and internet connectivity for it staff at 6th floor in the new civil sectt. building, sec.-17, chandigarh. (pdg. e.i, vrv/vrf system and elv services i.e lan, epabx, fire alarm and cctv system) (pdg. lan, epabx, fire alarm).
Setting up work stations and internet connectivity for it staff at 6th floor in the new civil sectt. building, sec.-17, chandigarh. (pdg. e.i, vrv/vrf system and elv services i.e lan, epabx, fire alarm and cctv system) (pdg. lan, epabx, fire alarm).
Read more31/2025-26/ee-ii/bengaluru
Providing services of third party quality assurance (tpqa) for construction of buildings under 4th phase at national institute of unani medicine (nium) campus, bengaluru. sh: construction of ug/pg academic block with library, 200 bedded hostal, administrative building, guest house and examination hall including internal water supply and sanitary installations, drainage, internal electrical installations, firefighting and fire alarm system, cctv, vrf or vrv air conditioning, ups, lan, lifts etc and development and bulk services, covered under agreement no.14/ce/ee-ii/2025-26 (main agreement)
Read more49/se/ee(e)/clted/2023-24
C/o. central library building for central university of kerala at kasaragod internal electrical installations. firefighting , vrf ac, cctv,av system and lifts etc.- balance work.
Read more55/se/ee(e)/clted/2023-24
C/o. central library building for central university of kerala at kasaragod internal electrical installations , firefighting, vrf ac, cctv,av system and lifts etc.- balance work
Read moreSetting up work stations and internet connectivity for it staff at 6th floor in the new civil sectt. building, sec.-17, chandigarh (pdg. e.i, vrv/vrf system and elv services i.e lan, epabx, fire alarm and cctv system) (pdg. electrical installation)
Setting up work stations and internet connectivity for it staff at 6th floor in the new civil sectt. building, sec.-17, chandigarh (pdg. e.i, vrv/vrf system and elv services i.e lan, epabx, fire alarm and cctv system) (pdg. electrical installation)
Read moreConstruction of academic science block 2 (basement g 10 upper floors) including rcc framed structure with pt beams, finishing works, water supply sanitary installations, internal electrical installation and cable laying, firefighting system
Construction of academic science block 2 (basement g 10
 upper floors) including rcc framed structure with pt beams,
 finishing works, water supply and sanitary installations, internal
 electrical installation and cable laying, firefighting system
Read more14/clted/2024-25
C/o. central library building for central university of kerala at kasaragod internal electrical installations, firefighting, vrf ac, cctv, av system and lifts etc.- balance work- sh: providing under deck insulation in first floor.
Read moreRenovation of office building of sc-st commission, bays no. 49-52, sec.-2, panchkula (pdg. elv services i.e audio and video, cctv system, fire alarm system, lan system and epabx system only)
Renovation of office building of sc-st commission, bays no. 49-52, sec.-2, panchkula (pdg. elv services i.e audio and video, cctv system, fire alarm system, lan system and epabx system only)
Read more23(niq)/ae(c)-iv/iitkpd-ii/2025/01
Construction of new building (g plus 4 storied for computer science and engineering department at iit kharagpur including internal water supply, sanitary installations, internal electrical installations, lifts, firefighting, air-conditioning and external electrical installations, lan, cctv, landscaping, including comprehensive operation and maintainence of civil, e and services for 05 years at iit kharagpur, west bengal.
Read moreof your Industry type