Tender Details

Particulars Details
Title
Construction Of Road From Tari To Bhagla Upto Ranthal By Way 07 Nos 900mm Dia Hume Pipe Culvert In Km 4th Rd 525 550,700 725,900 950 And Km 5th 150 200,
Description
Construction Of Road From Tari To Bhagla Upto Ranthal By Way 07 Nos 900mm Dia Hume Pipe Culvert In Km 4th Rd 525 550,700 725,900 950 And Km 5th 150 200
Organisation Government of Jammu and Kashmir
Tender Id 2023_PWDJK_233508_7
Reference
Number
eNIT NO 08 of 2023/23 Dated 13/10/2023
Tender Fee 600
EMD 40000
Tender Value
Place kalakote
Link https://jktenders.gov.in
Start Date October 14, 2023 21:30
End Date

25/10/2023 ( Expired 565 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of hume pipe drain chamber and cc road from baliram house to pal shop in chandrashekhar ward betul

Construction of hume pipe drain chamber and cc road from baliram house to pal shop in chandrashekhar ward betul

Read more
Construction of hume pipe drain chamber and cc road from ashok mohare house to nagore house in chandrashekhar ward betul

Construction of hume pipe drain chamber and cc road from ashok mohare house to nagore house in chandrashekhar ward betul

Read more
Replacement of 6 nos. existing narrow-poor minor bridge-culvert by suitable waterways structure with provision of temp. di etc. and raising of embankment ... in between km 610.00 to km 626.00 of nh-31 i the dist. of jalpaiguri, job no.566.

Replacement of 6 nos. existing narrow-poor minor bridge-culvert by suitable waterways structure with provision of temp. di etc. and raising of embankment ... in between km 610.00 to km 626.00 of nh-31 i the dist. of jalpaiguri, job no.566.

Read more
Periodical renewal to nh16 to nh-44 via donkal, renjarla from km 14/0 to 23/850 including construction of h.p culvert at km 6/2-4, 6/6-8, 7/2-4,9/8-10 and protective wall at km 8/8 in nizamabad district.. (sub work- providing road safety interventions)

Periodical renewal to nh16 to nh-44 via donkal, renjarla from km 14/0 to 23/850 including construction of h.p culvert at km 6/2-4, 6/6-8, 7/2-4,9/8-10 and protective wall at km 8/8 in nizamabad district.. (sub work- providing road safety interventions)

Read more
Balance work for construction of road from kaloon to haji shark harayala via dharana, mendhar by way of earth work in cutting, cross drainage, walling , providing and laying of 150mm thick wbm grade-ii,75mm thick wbm grade-iii and 25 mm thick ogpc

Balance work for construction of road from kaloon to haji shark harayala via dharana, mendhar by way of earth work in cutting, cross drainage, walling , providing and laying of 150mm thick wbm grade-ii,75mm thick wbm grade-iii and 25 mm thick ogpc

Read more
Balance work for construction of link road from tanta to draman via kuthal by way of earthwork 3 00 mtrs span rcc culvert 900 mm dia hp culvert 6 00 mtrs rcc culvert 3 00 mtrs height semi pucca r wall 2 00 mtrs height semi pucca r wall 2 50 m

Balance work for construction of link road from tanta to draman via kuthal by way of earthwork 3 00 mtrs span rcc culvert 900 mm dia hp culvert 6 00 mtrs rcc culvert 3 00 mtrs height semi pucca r wall 2 00 mtrs height semi pucca r wall 2 50 m

Read more
Laying of 275 meter 250 mm dia sewer hume pipe line and construction of 28 nos manhole chamber and road reinstatement work at ward-78 englishganj variouse gully

Laying of 275 meter 250 mm dia sewer hume pipe line and construction of 28 nos manhole chamber and road reinstatement work at ward-78 englishganj variouse gully

Read more
Laying of 347 meter 250 mm dia sewer hume pipe line and construction of 35 nos manhole chamber and road reinstatement work at ward-58 moh gulab nagar guddad bagh

Laying of 347 meter 250 mm dia sewer hume pipe line and construction of 35 nos manhole chamber and road reinstatement work at ward-58 moh gulab nagar guddad bagh

Read more
Laying of 558 meter 350 mm dia sewer hume pipe line and construction of 53 nos manhole chamber and road reinstatement work at ward-78 moh english ganj dr. kheda kothi to dulha miyan mazar and various gully.

Laying of 558 meter 350 mm dia sewer hume pipe line and construction of 53 nos manhole chamber and road reinstatement work at ward-78 moh english ganj dr. kheda kothi to dulha miyan mazar and various gully.

Read more
Laying of 734 meter 250 mm dia sewer hume pipe line and construction of 72 nos manhole chamber and road reinstatement work at ward-67 awas vikas various guly

Laying of 734 meter 250 mm dia sewer hume pipe line and construction of 72 nos manhole chamber and road reinstatement work at ward-67 awas vikas various guly

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise