Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ce.T.03/2025 Part A Gwnd Petty Works
|
| Description |
Triennial Petty Works Under The Jurisdiction Of General Works, Northern Division Including Bdlb Housing Colonies, Extendable By One Year On Two Occasions.
Part A Section 1 Quarters Section, Section 2 Hospital Section 3 Wadala Section
|
| Organisation | Mumbai Port Trust | Central Govt. Ministry/Department |
| Tender Id | 2025_MBPT_845771_1 |
|
Reference Number |
CE.T.03/2025 PART A GWND Petty Works |
| Tender Fee | 5250 |
| EMD | 7.6 Lakh |
| Tender Value | - |
| Place | MUMBAI |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=889056 |
| Start Date | January 31, 2025 14:30 |
| End Date |
Expired
05/02/2025
Expired 597 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Hiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreCe.t.03/2025 part c gwnd petty works
Triennial petty works under the jurisdiction of general works, northern division including bdlb housing colonies, extendable by one year on two occasions.
 part c section 7 water supply, section 8 roads
Read moreCe.t.03/2025 part b gwnd petty works
Triennial petty works under the jurisdiction of general works, northern division including bdlb housing colonies, extendable by one year on two occasions.
 part b section 4 cotton depot ex-bdld, section 5 grain depot, section 6 bunders)
Read moreCe.t.32/2025 monsoon protection gwnd
Triennial monsoon protection works in mbpa residential colonies under the jurisdiction of gwnd area, extendable by one year on two occasions
Read moreCe.t.09/2025 gwnd cc road
Reinstating the damaged concrete panels of cement concrete roads in the jurisdiction of gwnd
Read moreCe.t.65/2024 gwnd levelling
Filling and levelling the settled storage area at hay bunder and haji bunder, gwnd.
Read moreCe.t.45/2024 gwnd monsoon protection
Monsoon protection works in various mbpa residential colonies in gwnd area during the year 2024 part i ii
Read moreCe.t.20/2024 mod office gwnd
Upgradation of mod offices and canteen infrastructure in bunder section, gwnd.
Read moreCe.t.85/2023 gwnd garden maintenance
Biennial maintenance and rejuvenation of garden, green house, flower plants etc. at cotton depot area ,gwnd for the year 2023-24, 24-25
Read moreof your Industry type