Tender Details
Particulars | Details |
---|---|
Title |
Making Brick Wall Length 296.10m Along With The Steps To Facilitate Railing In Travelling Roadways In Incline No. 1 At P.B. Inc., Phularitand Section Of Amp Colliery.
|
Description |
Making Brick Wall Length 296.10m Along With The Steps To Facilitate Railing In Travelling Roadways In Incline No. 1 At P.B. Inc., Phularitand Section Of Amp Colliery.
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2025_BCCL_332967_1 |
Reference Number |
GM/AR-I/Survey/ e-NIT/2024-25/03 Date-19.03.2025 |
Tender Fee | 0 |
EMD | 6100 |
Tender Value | |
Place | AMP COLLIERY, BARORA AREA |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345168 |
Start Date | March 20, 2025 23:30 |
End Date |
25/03/2025 ( Expired 75 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreConstruction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Read moreRehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at nakrasota zone-38 asansol under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at nakrasota zone-38 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at kankhoya kali mandir zone-37 asansol under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at kankhoya kali mandir zone-37 asansol under amrut 2.0 phase-iii within amc
Read moreSupply work of auto tipper with fuel (transport) along with driver, helper and supervisor for door-to-door garbage collection in wards no. 1 to 35 of the municipality in the year 2025-26.
Supply iot work of auto tipper with fuel (transport) along with driver, helper and supervisor for door-to-door garbage collection in wards no. 1 to 35 of the municipality in the year 2025-26.
Read moreRepair of road from bera mokampara more to the house of nitish saha at bera uttarpara along with repair of drain by the side of road in ward no 14 under dainhat municipality
Repair of road from bera mokampara more to the house of nitish saha at bera uttarpara along with repair of drain by the side of road in ward no 14 under dainhat municipality
Read moreSpl repair to bldg no. p-548 (1-6) permt or md accn at map-ii of 14 idsr and roof treatment and wall panels in bldg no. p-275, rs auditorium under ge clement town
Spl repair to bldg no. p-548 (1-6) permt or md accn at map-ii of 14 idsr and roof treatment and wall panels in bldg no. p-275, rs auditorium under ge clement town
Read moreCa no. ge af no.1/gur-34/2025-26 repair and cleaning of sewage lines, man hole, drains, rain water harvesting pits alongwith repairs to , boundary wall, fencing and gate in the area of 27 ed and 31 mcu at af stn palam, under ge (p) af gurgaon no 1
Ca no. ge af no.1/gur-34/2025-26 repair and cleaning of sewage lines, man hole, drains, rain water harvesting pits alongwith repairs to , boundary wall, fencing and gate in the area of 27 ed and 31 mcu at af stn palam, under ge (p) af gurgaon no 1
Read moreTechnical consultant for carrying out consultancy services for the preparation of dpr for construction of new bridge on devidaspura drain at khajala gehri road to gadli along with one no rub/ box pushing method including approaches in distt asr
Technical consultant for carrying out consultancy services for the preparation of dpr for construction of new bridge on devidaspura drain at khajala gehri road to gadli along with one no rub/ box pushing method including approaches in distt asr
Read moreof your Industry type