Tender Details
Particulars | Details |
---|---|
Title |
Making Brick Wall Length 296.10m Along With The Steps To Facilitate Railing In Travelling Roadways In Incline No. 1 At P.B. Inc., Phularitand Section Of Amp Colliery.
|
Description |
Making Brick Wall Length 296.10m Along With The Steps To Facilitate Railing In Travelling Roadways In Incline No. 1 At P.B. Inc., Phularitand Section Of Amp Colliery.
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2025_BCCL_332967_1 |
Reference Number |
GM/AR-I/Survey/ e-NIT/2024-25/03 Date-19.03.2025 |
Tender Fee | 0 |
EMD | 6100 |
Tender Value | |
Place | AMP COLLIERY, BARORA AREA |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345168 |
Start Date | March 20, 2025 23:30 |
End Date |
25/03/2025 ( Expired 49 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreRehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Read moreConstruction of re wall of 2 lane r.o.b. in lieu x-ing no.-415 a / 3e at km 1313/0-1 (shankargarh-nari bari road) of north central railway on naini-manikpur rail section in district prayagraj
Construction of re wall of 2 lane r.o.b. in lieu x-ing no.-415 a /&#x0d 3e at km 1313/0-1 (shankargarh-nari bari road) of north central railway on naini-manikpur rail section in district prayagraj.
Read moreProviding, installation and commissioning of submersible pumping machinery along with allied electro-mechanical works for augmentation tube well in connection to accommodate fhtc at pump house no.-i and ii under kishorepur ground water based water
Providing, installation and commissioning of submersible pumping machinery along with allied electro-mechanical works for augmentation tube well in connection to accommodate fhtc at pump house no.-i and ii under kishorepur ground water based water
Read moreWork of making thickener serial number 1 (one) operational by replacement of damaged turn table complete set, center scraper, rake blade, center scraper support etc. (of broke down thickener no. 1) in order to ensure proper thickening of slimes at ws
Work of making thickener serial number 1 (one) operational by replacement of damaged turn table complete set, center scraper, rake blade, center scraper support etc. (of broke down thickener no. 1) in order to ensure proper thickening of slimes at ws
Read moreA. construction of 592 nos. pcc steps for travelling roadways location 1nd2l to 1nd25l in hr section-iv, b. construction of 154 nos pcc steps for travelling roadways location 1nd118l to 1nd123l in hr sec-i.
A. construction of 592 nos. pcc steps for travelling roadways location 1nd2l to 1nd25l in hr section-iv, b. construction of 154 nos pcc steps for travelling roadways location 1nd118l to 1nd123l in hr sec-i.
Read moreCa no. ge af no.1/gur-08/2025-26 repair to brick work, wall plastering to earthern traverse in x area at 54 asp under ge (af) gurgaon no 1
Ca no. ge af no.1/gur-08/2025-26 repair to brick work, wall plastering to earthern traverse in x area at 54 asp under ge (af) gurgaon no 1
Read moreDrilling of 175 mm dia and 150 mtr deep tubewell with installation of sumbersible motor pump including electrifcation network at site in gwalior vidhansabha ward 01 to 17 and 31,32,33 and 36 file no. 114/24x9/1
Drilling of 175 mm dia and 150 mtr deep tubewell with installation of sumbersible motor pump including electrifcation network at site in gwalior vidhansabha ward 01 to 17 and 31,32,33 and 36 file no. 114/24x9/1
Read moreUpgradation and construction of multai to mh border road section of nh-347a from design chainage 0.000 to 23.94 km (total length 23.94 km) to 2l with paved shoulder configuration along with one time improvement in 5.80 km length in the state of made
Upgradation and construction of multai to mh border road section of nh-347a from design chainage 0.000 to 23.94 km (total length 23.94 km) to 2l with paved shoulder configuration along with one time improvement in 5.80 km length in the state of made
Read moreTransport of material like roof bolts with nuts and bearing plates ,w- straps resin capsule, stemming material , stone dust from surface to all running districts in ug panel of l.w.s at chhatarpur mine no.1, pathakhera area, wcl
Transport of material like roof bolts with nuts and bearing plates ,w- straps resin capsule, stemming material , stone dust from surface to all running districts in ug panel of l.w.s at chhatarpur mine no.1, pathakhera area, wcl
Read moreof your Industry type