Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Emergency Light (Fire Alarm) , Required For Shop Floor During Emergency Purpose. (Suggested By Iso
|
| Description |
|
| Organisation | Department of Heavy Industry | Ministry of Heavy Industries and Public Enterprises |
| Tender Id | GEM/2023/B/3615280 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | June 26, 2023 16:43 |
| End Date |
Expired
06/07/2023
Expired 1197 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
First aid box,first aid box 2,fire extinguisher,safety signage,lab coat,gloves plastic,gloves rubber,disposable cap,safety goggles,face shield,spill control kit,eye wash bottle,biohazard bin,chemical resistant apron,emergency torch,caution floor sign,spray bottle,door closer
First aid box,first aid box 2,fire extinguisher,safety signage,lab coat,gloves plastic,gloves rubber,disposable cap,safety goggles,face shield,spill control kit,eye wash bottle,biohazard bin,chemical resistant apron,emergency torch,caution floor sign,spray bottle,door closer
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - metro rail stations and depot sitc of wall floor mounted power supply boxes and cables etc required for vrf outdoor units at elevated stations and fire pump panel at t..
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - metro rail stations and depot sitc of wall floor mounted power supply boxes and cables etc required for vrf outdoor units at elevated stations and fire pump panel at t..
Read moreTrough floor assembly complete for 3 phase memu/dmc coach note:- 1.0 extra channels are to be provided on suitable location of trough floor assembly for lifting/transporation purpose ., as per drawing: em11545 alt b item no. 6 to be supplied as loose in seprate packing, packing instruction: no special packing required. the protruding, threaded portion, gauges and loose items etc. if any are to be protected with suitable covering to prevent it from damage. however transit damage if any sh
Trough floor assembly complete for 3 phase memu/dmc coach note:- 1.0 extra channels are to be provided on suitable location of trough floor assembly for lifting/transporation purpose ., as per drawing: em11545 alt b item no. 6 to be supplied as loose in seprate packing, packing instruction: no special packing required. the protruding, threaded portion, gauges and loose items etc. if any are to be protected with suitable covering to prevent it from damage. however transit damage if any sh
Read moreFire alarm hooter, required for shop floor(iso requirement) . industrial motor siren 220v sound ran
Read more
Emergency light (fire alarm) , required for eot crane safety alert. (tower light) . make-jigo tower
Read more
Operation and maintenance of fire alarm system - emergency repair/repl of fire alarm two loop panel
Read more
Operation and maintenance of fire alarm system - emergency repair/repl of fire alarm two loop panel
Read more
of your Industry type