Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Balance Work Of Rapid Sand Filtration Plant Heripora Ganiwan Including Improvement Of Pipe Network At New Colony/ Other Paties Of Ganiwan (Ut Capex)
|
| Description |
Balance Work Of Rapid Sand Filtration Plant Heripora Ganiwan Including Improvement Of Pipe Network At New Colony/ Other Paties Of Ganiwan (Ut Capex)
|
| Organisation | Government of Jammu and Kashmir |
| Tender Id | 2023_PHE_240843_1 |
|
Reference Number |
FRESH ENIT NO 52 OF 2023 - 24 |
| Tender Fee | 2500 |
| EMD | 1.05 Lakh |
| Tender Value | - |
| Place | OFFICE OF THE EXEN JS PHE RWSD GBL/SGR |
| Link |
View Original Tender Notice
https://jktenders.gov.in |
| Start Date | December 21, 2023 15:30 |
| End Date |
Expired
03/01/2024
Expired 1014 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of coal and sand filter media for rapid gravity sand filters of water systems
Supply of coal and sand filter media for rapid gravity sand filters of water systems
Read moreImprovement strengthening extension of pipe network at ward no. 7,8,9 and 10. (under distt. capex)
Improvement strengthening extension of pipe network at ward no. 7,8,9 and 10. (under distt. capex)
Read moreImprovement strengthening extension of pipe network at ward no. 4,5,6 and 16.(under distt. capex)
Improvement strengthening extension of pipe network at ward no. 4,5,6 and 16.(under distt. capex)
Read moreImprovement strengthening extension of pipe network at ward no. 1,2,3 and 17.(under distt. capex)
Improvement strengthening extension of pipe network at ward no. 1,2,3 and 17.(under distt. capex)
Read moreCompletion of balance works, including construction of intake chamber at headsite, constt of pre-settling tank with washout/sluice chamber, 0.05 mgd slow sand filtration plant, 0.25 lac gallons sr with sluice chamber, staff quarter including laying a
Completion of balance works, including construction of intake chamber at headsite, constt of pre-settling tank with washout/sluice chamber, 0.05 mgd slow sand filtration plant, 0.25 lac gallons sr with sluice chamber, staff quarter including laying a
Read moreFixed bed catalytic reactor,advanced integrated biosel research and process development system,lab scale gasifier unit,electrocoagulation combined with membrane filtration,precision analytical balance
Fixed bed catalytic reactor,advanced integrated biosel research and process development system,lab scale gasifier unit,electrocoagulation combined with membrane filtration,precision analytical balance
Read moreBalance work for re-modelling of phe control room and renovation of office building under district capex budget 2025-26
Balance work for re-modelling of phe control room and renovation of office building under district capex budget 2025-26
Read moreImprovement of ht/lt network under jurisduction of division iv khanyar of kpdcl under ut capex 2026-27. work code pddss2627100235
Improvement of ht/lt network under jurisduction of division iv khanyar of kpdcl under ut capex 2026-27. work code pddss2627100235
Read moreExtension of distribution network by way of providing / fitting of 20mm dia g.i. pipe-line at meerakshah colony zakura district capex
Extension of distribution network by way of providing / fitting of 20mm dia g.i. pipe-line at meerakshah colony zakura district capex
Read moreBalance work of devsthan mandi karmolla mohalla w.no 01 pyt sangar block pouni district reasi under capex pri for the year 2026-27
Balance work of devsthan mandi karmolla mohalla w.no 01 pyt sangar block pouni district reasi under capex pri for the year 2026-27
Read moreof your Industry type