Tender Details
Particulars | Details |
---|---|
Title |
Improvements To Link Road Dichpally Nizamabad At Km. 13/2 To Kondur (Via) Devi Theatre, Ntr Statue, Post Office, Railway Station, Dubba, Kaloor Road From Km 0/0 To 15/2. In Nizamabad District (Working Reach From Km 1/340 To Km 3/0).
|
Description |
Improvements To Link Road Dichpally Nizamabad At Km. 13/2 To Kondur (Via) Devi Theatre, Ntr Statue, Post Office, Railway Station, Dubba, Kaloor Road From Km 0/0 To 15/2. In Nizamabad District (Working Reach From Km 1/340 To Km 3/0).
|
Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
Tender Id | 551753 |
Reference Number |
1606-6/DCE(R)/EE-R/DEE-III/AEE-V/2024-25/NZB Dt:15.10.2024 |
Tender Fee | 11800 |
EMD | 4.91 Lakh |
Tender Value | |
Place | TS |
Link | http://eprocurement.telangana.gov.in/ |
Start Date | October 18, 2024 22:30 |
End Date |
25/10/2024 ( Expired 206 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Pr of the road from pwd road at ujan dudpur to pwd road at ujan dudpur via biplab chakraborty house total length 2 00 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km to ch 1 00 km
Pr of the road from pwd road at ujan dudpur to pwd road at ujan dudpur via biplab chakraborty house total length 2 00 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km to ch 1 00 km
Read moreLink road from rc. 21 to hayagriva polytechnic at sooramangalam improvements to the link road from subbarayar statue to rambakkam main road and link road from rc 21 to hayagriva polytechnic at sooramangalam km 0.040 to 0.530 and km 2.210 to 3.245
Link road from rc. 21 to hayagriva polytechnic at sooramangalam improvements to the link road from subbarayar statue to rambakkam main road and link road from rc 21 to hayagriva polytechnic at sooramangalam km 0.040 to 0.530 and km 2.210 to 3.245
Read moreFdr to reconstruction of damaged, narrow pipe culverts from km 0/0 to 10/0 (12nos), construction of drain in kulaspur village limits from km 3/8-10 and strengthening of road in mullangi village limits from km 7/4-8 on mogpal to nh-44 (via) kanjar, kulaspur dichpally railway station road and lead road to kanjar from km 0/0 to 15/4 in nizamabad district (2nd call).
Fdr to reconstruction of damaged, narrow pipe culverts from km 0/0 to 10/0 (12nos), construction of drain in kulaspur village limits from km 3/8-10 and strengthening of road in mullangi village limits from km 7/4-8 on mogpal to nh-44 (via) kanjar, kulaspur dichpally railway station road and lead road to kanjar from km 0/0 to 15/4 in nizamabad district (2nd call).
Read morePeriodical renewal to nh16 to nh-44 via donkal, renjarla from km 14/0 to 23/850 including construction of h.p culvert at km 6/2-4, 6/6-8, 7/2-4,9/8-10 and protective wall at km 8/8 in nizamabad district.. (sub work- providing road safety interventions)
Periodical renewal to nh16 to nh-44 via donkal, renjarla from km 14/0 to 23/850 including construction of h.p culvert at km 6/2-4, 6/6-8, 7/2-4,9/8-10 and protective wall at km 8/8 in nizamabad district.. (sub work- providing road safety interventions)
Read morePeriodical renewal to lead road to erajpally road from km 0/0 to 2/150 in nizamabad district. (sub work- providing road safety interventions)
Periodical renewal to lead road to erajpally road from km 0/0 to 2/150 in nizamabad district. (sub work- providing road safety interventions)
Read moreDharmapuri district - strengthening of the road from mrl-15 galegounadanur to pudupatti (via) errabaiyanahalli, karubaiyanahalli, nekkunthi km. 0/0 - 4/800 in package no.tn04-272
Strengthening of the road from mrl-15 galegounadanur to pudupatti (via) errabaiyanahalli, karubaiyanahalli, nekkunthi km. 0/0 - 4/800
Read moreAnnual maintenance plan-i for the year 2025-26 on thatharna to thanga i.e link road to village devna km. 0/0 to 3/130 vr (non pmgsy)(sh repair of pot holes and bitumenous concrete 25 mm thick using plastic based from km. 2/00 to 3/130 ) 1.130
Annual maintenance plan-i for the year 2025-26 on thatharna to thanga i.e link road to village devna km. 0/0 to 3/130 vr (non pmgsy)(sh repair of pot holes and bitumenous concrete 25 mm thick using plastic based from km. 2/00 to 3/130 ) 1.130
Read moreWidening and strengthening of 1. r and b pwd road to pagidimarri via road kothapally, anantharam, vemireddygudem, deepavarigudem from km 0/0 to 8/7, ii. pagidimarri to madhanapuram road from km 0/0 to 3/0 and iii. pagidimarri road to khudavanpur road from km 0/0 to 3/0 ( including constructions of hlb at km 8/2-4 on somannavagu in nalgonda district ( sub work: conducting sub soil investigation work for hlb at km 8/2-4)
Widening and strengthening of 1. r and b pwd road to pagidimarri via road kothapally, anantharam, vemireddygudem, deepavarigudem from km 0/0 to 8/7, ii. pagidimarri to madhanapuram road from km 0/0 to 3/0 and iii. pagidimarri road to khudavanpur road from km 0/0 to 3/0 ( including constructions of hlb at km 8/2-4 on somannavagu in nalgonda district ( sub work: conducting sub soil investigation work for hlb at km 8/2-4)
Read moreWidening and strengthening from single lane to double lane of nalgonda town portion from km 0/0 - 1/0 in municipal limits, nalgonda - mushampally road from km 0/0 -12/0, mushampally - kannekal via dharmapuram km 0/0 -6/2 ( pr road) and mukundhapur - thipparthy road from km 16/0 -24/5 in nalgonda district ( sub work :- conducting sub soil investigation work for hlb at km 23/724 of mukundapur - thipparthy road )
Widening and strengthening from single lane to double lane of nalgonda town portion from km 0/0 - 1/0 in municipal limits, nalgonda - mushampally road from km 0/0 -12/0, mushampally - kannekal via dharmapuram km 0/0 -6/2 ( pr road) and mukundhapur - thipparthy road from km 16/0 -24/5 in nalgonda district ( sub work :- conducting sub soil investigation work for hlb at km 23/724 of mukundapur - thipparthy road )
Read moreWidening and strengthening of 1. r and b pwd road to pagidimarri via road kothapally, anantharam, vemireddygudem, deepavarigudem from km 0/0 to 8/7, ii. pagidimarri to madhanapuram road from km 0/0 to 3/0 and iii. pagidimarri road to khudavanpur road from km 0/0 to 3/0 ( including constructions of hlb at km 8/2-4 on somannavagu in nalgonda district ( sub work: providing consultancy services for conducting topograhical survey and preparation of plan and profile)
Widening and strengthening of 1. r and b pwd road to pagidimarri via road kothapally, anantharam, vemireddygudem, deepavarigudem from km 0/0 to 8/7, ii. pagidimarri to madhanapuram road from km 0/0 to 3/0 and iii. pagidimarri road to khudavanpur road from km 0/0 to 3/0 ( including constructions of hlb at km 8/2-4 on somannavagu in nalgonda district ( sub work: providing consultancy services for conducting topograhical survey and preparation of plan and profile)
Read moreof your Industry type